Joint Strike Fighter Aircraft

(asked on 10th December 2014) - View Source

Question to the Ministry of Defence:

To ask the Secretary of State for Defence, what changes have been made in the planned capability of the F-35 joint strike fighter because of the time taken to introduce the aircraft.


Answered by
Anna Soubry Portrait
Anna Soubry
This question was answered on 16th December 2014

In line with approvals, the F-35 Lightning programme is on track to enter UK service in 2018 at the planned capability standard.

Reticulating Splines