Question to the Ministry of Defence:
To ask the Secretary of State for Defence, what the (a) initial and (b) final operating capability is for the Protector unmanned aerial vehicle.
The Initial Operating Capability for the Protector aircraft is 2023 with Full Operating Capability in 2025.