Govia Thameslink Railway: Standards

(asked on 7th July 2016) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, whether external consultants were involved in the design of the (a) Remedial Plan or (b) emergency timetable for Govia Thameslink Railway services.


Answered by
 Portrait
Claire Perry
This question was answered on 14th July 2016

The Department did not design either the Remedial Plan, or the revised timetable being introduced on 11 July. Emergency timetables are introduced by the rail industry in reaction to specific circumstances as they are responsible for operating the railway and do not need the prior approval of the Secretary of State.