Govia Thameslink Railway: Standards

(asked on 7th July 2016) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, whether his Department is required to consult (a) passenger groups, (b) trade unions and (c) Network Rail before the introduction of an emergency timetable on Govia Thameslink Railway services can take place.


Answered by
 Portrait
Claire Perry
This question was answered on 14th July 2016

Emergency timetables are introduced by the rail industry in reaction to specific circumstances as they are responsible for operating the railway and do not need the prior approval of the Secretary of State. GTR has introduced a revised timetable which seeks to use the resources that are likely to be available in order to provide a service that passengers can rely on. It is for the operator, in conjunction with Network Rail, to manage the timetable effectively.