Navy and Royal Fleet Auxiliary: Shipping

(asked on 19th October 2021) - View Source

Question to the Ministry of Defence:

To ask the Secretary of State for Defence, pursuant to the Answer of 8 September 2021 to Question 41708, on Navy and Royal Fleet Auxiliary: Shipping, and his letter dated 29 September 2021, for all periods of planned maintenance on (a) Royal Navy and (b) Royal Fleet Auxiliary surface vessels between 2017 and 2021 that finished later than originally scheduled, what the average delay was to the completion of the maintenance period (a) in number of weeks and (b) as a proportion of the originally planned time.


Answered by
Jeremy Quin Portrait
Jeremy Quin
This question was answered on 22nd October 2021

Unfortunately, it will take some time to collate and analyse the information requested. To ensure I can provide as much detail as possible, I will write to the Rt Hon. Member with the detail requested once it has been gathered and a copy of the letter will be placed in the Library of the House.