High Speed 2 Debate

Full Debate: Read Full Debate
Department: HM Treasury
Wednesday 12th September 2018

(5 years, 7 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Jack Brereton Portrait Jack Brereton (Stoke-on-Trent South) (Con)
- Hansard - -

I congratulate my hon. Friend the Member for Stone (Sir William Cash) on securing the debate. As a great believer in the future of rail transport, I have long welcomed greater investment in our railways. On Second Reading of the High Speed Rail (West Midlands - Crewe) Bill, I raised the positive case for ensuring that HS2 trains serve Stoke-on-Trent, and I continue to push for the enhanced connectivity that our growing economy needs. I am pleased that the Department for Transport recognises that. However, I have continued to raise concerns about the level of disruption that we are likely to experience during construction—in particular, I did so at the Bill Select Committee. I will set out how HS2 could deliver much greater benefits for the substantial investment being made and how its impacts can be mitigated much more effectively.

The new high-speed rail line is sound in principle but, as I have always warned, for HS2 to maximise in practice the suggested social and economic benefits, it must be met with improvements locally on the conventional network. Indeed, much more work must be undertaken in partnership with Network Rail to assess what measures will be necessary to ensure that the conventional network is up to an acceptable standard to facilitate HS2 classic-compatible services.

Services via Stoke-on-Trent and Stafford should terminate not at Macclesfield but at Manchester, and work must be done to understand how additional capacity can be facilitated on the network north of Macclesfield to allow for that. In addition, work must be done to address constraints caused by the numerous junctions and level crossings on the network throughout Staffordshire. Importantly, there is a section of the line at Alsager that must be redoubled to increase capacity and the frequency of services linking through to Crewe and beyond.

While the commitment on HS2 services serving Stoke-on-Trent is welcome, current levels of economic growth demand more than one service an hour. In particular, the introduction of a classic-compatible service between Birmingham Curzon Street and Stoke-on-Trent, terminating at either Manchester Piccadilly or Liverpool Lime Street, would help relieve severe overcrowding on the network north of Birmingham.

There are clear challenges with running HS2 services on the conventional network, some of which I have outlined. I hope that the Minister will indicate what is being done to understand what works are required to achieve full integration. That spending must be planned for in Network Rail’s control period 6, which is due to start in 2019. As I continue to stress, it is essential that HS2 works effectively with Network Rail, the city council and other partners to ensure that improvements to Stoke station are completed.

My greatest concern is about construction traffic. Traffic modelling carried out by HS2 is based around the stipulation that 90% of excavated material will be reused in construction. As an estimate, for every 1% that that figure is out, there would be roughly an additional 250,000 vehicle movements. Geotechnical ground investigations have yet to be undertaken on phase 2a, but studies on phase 1 commenced in autumn 2017 and that data will include analysis of the quality of the excavated material, which will help inform whether it is viable to reuse 90% of it. It is essential that early lessons are learned from phase 1, and the data is vital to informing the traffic modelling.

There will be a significant impact from construction traffic on the road network along the route, especially at junction 15 of the M6, which serves Stoke-on-Trent. That location will see the highest impact from construction traffic during phase 2a. HS2 figures suggest that it will cause gridlock at the junction, with a 50% increase in HGVs at the morning peak and nearly a 100% increase at the afternoon peak. It has been widely recognised that the approach taken in the traffic assessment is insufficient; it is not a network analysis but an analysis of junctions independently of one another, which is most problematic at this location.

Junction 15 is made up of three interacting junctions, yet HS2 has analysed the impacts separately and independently, meaning that the full impact has not been recognised. I call for the Government and HS2 to take action to ensure that junction 15 is upgraded before the construction of phase 2a. That is essential to ensure that it can accommodate not only HS2 traffic but future growth in the economy and complete the national smart motorway spine. I also call for upgrades on the A34, where it is predicted there will be a 400-car queue every evening.