High Speed 2 Debate

Full Debate: Read Full Debate
Department: HM Treasury
Wednesday 10th July 2019

(4 years, 10 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - - - Excerpts

I fear that I am very much aware of what the hon. Gentleman says, and I agree with him.

Clearly, therefore, much of the capacity constraint on the west coast main line is spatially and temporally specific, being focused on the peak rush hours, and only in Euston and Birmingham. The biggest issue is crowding on individual trains at those times, rather than crowding throughout the day.

Laura Smith Portrait Laura Smith (Crewe and Nantwich) (Lab)
- Hansard - -

Does the right hon. Lady agree that HS2 will free up the main line so that freight will be able to operate more freely, which will help with congestion on our roads and be far more beneficial to the environment?

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - - - Excerpts

The hon. Lady is right that building a train line frees up capacity for freight lines and all sorts of other things; the question is the business case for this particular project. The question must be asked: is it worth spending £55.7 billion of public money, as allocated by the Department for Transport, to alleviate crowding issues in the morning and evening peaks? The main alternative considered by the Government, known as the strategic alternative, could have achieved the same result at a much lower cost, through a combination of infrastructure and rolling stock upgrades, at a cost of around £4.9 billion in 2011 prices. Additional capacity and more fast-line services could be delivered via Euston to relieve the specific pressure points during the peak-hour rushes, rather than building a whole new line that would create unneeded capacity throughout the day.

The Lords Economic Affairs Committee report concluded that the Government have

“yet to make a convincing case for proceeding with the project”

and it has

“not seen convincing evidence that the nature of the capacity problem warrants building HS2.”

--- Later in debate ---
Kelvin Hopkins Portrait Kelvin Hopkins
- Hansard - - - Excerpts

I agree with the hon. Gentleman; absolutely. Even within the northern region there are some dreadful train services. There are old charabancs on rail tracks that are a disgrace and should have been replaced, and the lines have not been electrified. They should have been.

Laura Smith Portrait Laura Smith
- Hansard - -

It is key to note that for Northern Powerhouse Rail to happen, we have to have the HS2 infrastructure in place.

Kelvin Hopkins Portrait Kelvin Hopkins
- Hansard - - - Excerpts

I think I have made my point. I am running out of time, Mr Hosie. I could go into much more detail, but on this occasion perhaps I should conclude here. I think the case against HS2 is overwhelming. I look forward to a sensible Government abandoning it and reinvesting in all the other schemes that are so much more beneficial and needed.