Debates between Nusrat Ghani and Cheryl Gillan during the 2017-2019 Parliament

Mon 15th Jul 2019
High Speed Rail (West Midlands - Crewe) Bill
Commons Chamber

Report stage & Report stage & 3rd reading & 3rd reading & 3rd reading: House of Commons & Report stage & Report stage: House of Commons
Wed 12th Sep 2018
Tue 30th Jan 2018
High Speed Rail (West Midlands - Crewe) Bill
Commons Chamber

2nd reading: House of Commons & Allocation of time motion: House of Commons & Carry-over motion: House of Commons & Money resolution: House of Commons & 2nd reading: House of Commons & Allocation of time motion: House of Commons & Carry-over motion: House of Commons & Money resolution: House of Commons & 2nd reading: House of Commons & Allocation of time motion: House of Commons & Carry-over motion: House of Commons & Money resolution: House of Commons & 2nd reading & 2nd reading: House of Commons & Allocation of time motion & Allocation of time motion: House of Commons & Carry-over motion & Carry-over motion: House of Commons & Money resolution & Money resolution: House of Commons & 2nd reading & Money resolution & Allocation of time motion & Carry-over motion & 2nd reading

High Speed Rail (West Midlands - Crewe) Bill

Debate between Nusrat Ghani and Cheryl Gillan
Report stage & 3rd reading & 3rd reading: House of Commons & Report stage: House of Commons
Monday 15th July 2019

(4 years, 10 months ago)

Commons Chamber
Read Full debate High Speed Rail (West Midlands-Crewe) Act 2021 View all High Speed Rail (West Midlands-Crewe) Act 2021 Debates Read Hansard Text Read Debate Ministerial Extracts Amendment Paper: Consideration of Bill Amendments as at 15 July 2019 - (15 Jul 2019)
Nusrat Ghani Portrait Ms Ghani
- Hansard - -

I want to put on the record my thanks to James for doing such fantastic work. My hon. Friend raised an important point. It should not be up to Members and their staff to continually liaise between HS2 and their constituents. It is HS2’s job to ensure that the community engagement is appropriate and done with humility and that cases are dealt with swiftly.

My hon. Friend once again challenged the budget. As I said, it is £55.7 billion. It is the job not only of the Department but of the chairman and the CEO to keep budgets tight. He also talked about spoil and its impact on traffic in his constituency. It is expected that 92% of excavated material generated by phase 2A will be used across the HS2 route and that 4% will be directed to local placement along the route. I am more than happy to meet him again to go through his issues and will make sure that Highways England is in the room as well. He mentioned three cases—the golf club, Hopton and Hanchurch. I have an update on all three and am more than happy to put them in writing to save time on the Floor of the House. If he wishes to meet, I can also provide him with an update then, but progress is being made. I understand from my notes that they are more or less satisfied with the arrangements made with HS2.

I welcome the support of my hon. Friend the Member for Copeland (Trudy Harrison). I agree about the transformative nature of public transport and its impact on national prosperity, which is why we are making such a significant investment in our railways. I remind her, because I know it is incredibly important to Copeland, that there will be more than £2.9 billion of trans-Pennine rail upgrades—the single biggest project commitment in control period 6.

My hon. Friend the Member for Congleton (Fiona Bruce) asked repeatedly what HS2 would do for her constituency. At its peak, there will be more than 300,000 people travelling daily on this line. It will connect eight of our top 10 cities. Two technical colleges are already in place to make sure that our youngsters and older people who want to reskill have a job for life. It will connect our country. I completely understand, as a constituency Member, how Members should and must fight for the best deal for their constituents, but this will be a transformative project. All the cases raised today by Members on both sides of the House of where HS2 Ltd is not acting as swiftly as it could be have been put on the record, and I will do my best to take forward any cases that remain undealt with.

I hesitate to respond to my hon. Friend the Member for Lichfield (Michael Fabricant) in case he makes a passionate intervention, but I cannot see him in the Chamber. No doubt he will come back in. I thank the hon. Member for Crewe and Nantwich (Laura Smith) for her support for the Bill. She referred to businesses. There are 2,000 businesses already involved on the line and 9,000 people working on the line, and 98% of the businesses involved in HS2 are small and medium-sized enterprises.[Official Report, 16 July 2019, Vol. 663, c. 8MC.] I have personally tasked HS2 with making sure that it makes it an easier process for smaller businesses to bid for projects. I want this project to transform not just large but small businesses, making it easier for them to pitch for work.

The right hon. Member for Normanton, Pontefract and Castleford (Yvette Cooper) spoke about investment in the north. I was lucky enough to be in the Chamber earlier with the Rail Minister, my hon. Friend the Member for Harrogate and Knaresborough (Andrew Jones), and I can confirm that we are investing more than £40 billion in our existing network. Network Rail estimates that about 100 cities and towns could benefit from new or improved rail connections as a result of HS2. As some of the passionate speakers have noted today, it is not an either/or project; we need HS2 as well as continued investment in our rail and road network.

I do not see my hon. Friend the Member for Stone (Sir William Cash) in the Chamber, so I will move on. As I am running out of time, I will now deal with the new clauses. I welcomed what the hon. Member for York Central (Rachael Maskell) said about new clause 1, but I do not recognise the need for quarterly reporting. I think that once I have explained why, she will agree with me.

Let me first say something about the environment. The project is already bound not to exceed the likely significant environmental effects that were assessed and reported to Parliament. The environmental statement clearly sets out our approach to the monitoring, reporting and mitigation of environmental impacts during the construction of the phase 2a scheme, and follows industry best practice. Most important, the monitoring and reporting of individual environmental impacts must be tailored to the impacts in question. During phase 1 we are already publishing monthly and annual reports setting out compliance with air quality and dust commitments, and similar monthly reports on noise and vibration impacts are published.

Subject to Royal Assent, local environmental and management plans will be developed for each local authority along the phase 2a route. They will explain how the scheme will adapt to and deliver the required environmental and community protection measures in each local authority area. If we make a decision here today, we will tie the hands of local authorities, which will not be able to engage in important discussions. We should not, here in London, impose something separate and arbitrary that may not be locally appropriate. When authorities have those conversations with HS2 Ltd, they can make arrangements to receive monthly reports.

Contractors working for HS2 Ltd will be required to comply with the measures in the local environmental management plans in order to meet the environmental minimum requirements. HS2 Ltd will also consult statutory agencies and independent experts, such as the HS2 ecological review group, which will advise on the monitoring regime and report impacts on ecology and biodiversity. The hon. Lady said a lot about the need for local engagement, local empowerment and monthly reports. All that can and will take place if we allow it to happen, as it has in relation to other parts of the line. She may not have been aware that that was happening, but I think she will agree that if we accept her new clause we will not only increase costs, but create an unintended consequence whereby local authorities will lose their monthly reporting.

New clause 2 proposes a compensation scheme for tenants. We discussed that in the Public Bill Committee on 25 June, when I responded to a similar proposal. As I said then, the starting point is that the land compensation code does not shut out those who hold land, whatever the duration of their tenancies. It does not bar them from compensation. We have a responsibility to be absolutely accurate when we are talking about policies and the support that is provided. We may make people even more nervous about coming forward if they do not know what measures are available.

Most types of tenancy are already provided for under existing compensation, if they are impacted by the scheme. When they are not, the Government can use their flexible, non-statutory compensation arrangements to provide support where appropriate in a typical case, which is the category into which most of these cases will fall. The amount of compensation payable is set by the Ministry of Housing, Communities and Local Government. It applies to all Government-led infrastructure projects, and not just to HS2. Those arrangements have been debated, agreed and set by Parliament, together with a vast body of case law on the subject.

The hon. Lady may not be aware that HS2 Ltd has published a useful information note—“C15: guide to compensation for short term residential tenants”—which covers atypical cases. I am more than happy to sit down with her and explain it. I am also more than happy to ensure that, if necessary, the position is communicated to local community engagement forums as effectively as possible. I have previously hosted events in the House to enable Members on both sides of the House to manage particular scenarios with their constituents.

Cheryl Gillan Portrait Dame Cheryl Gillan
- Hansard - - - Excerpts

I apologise for missing the start of the Minister’s speech. I was chairing a debate in Westminster Hall.

Can the Minister assure me that the property registers and the holdings of properties will be accurate? I was recently given two lists of properties in my constituency that had been bought by HS2 Ltd, and they did not match. Properties that were missing from the second list had appeared on another list some years earlier. Can the Minister assure me that she will update the property registers, and will ensure that they are accurate in the first place?

Nusrat Ghani Portrait Ms Ghani
- Hansard - -

My right hon. Friend has raised the important issue of transparency and the need for data to be up to date. Members of Parliament who are working hard for their constituents need to know exactly what data they are speaking about. I shall be happy to ensure that any case that my right hon. Friend raises is dealt with by HS2 Ltd, and also to ensure that there is even greater clarity about the compensation packages that are available.

Let me now deal with new clause 4. Phase 2a has been under independent scrutiny since its conception. All elements of high-speed rail have been subject to scrutiny since the outset, not least in the House, through the petitioning process, through Public Bill Committee scrutiny and debate, and also through independent scrutiny conducted by the Infrastructure and Projects Authority and the National Audit Office.

Let me assure the House that, while HS2 is making huge progress in supporting 9,000 jobs across the country and being backed by businesses and business leaders in the midlands and the north, we will continue to scrutinise the project. HS2 will boost economic growth across the UK, and we are already seeing the benefits in the midlands and the north. However, I do not see the benefits of a further environmental assessment, given that we have already consulted extensively. That includes a seven-month consultation on the route back in 2013, a scope and methodology consultation in preparation for the environmental impact assessment in 2016, a consultation on the working draft of the environmental impact assessment—also in 2016—a consultation on the environmental statement deposited alongside the Bill in 2017, and two more consultations on the environmental statement and supplementary environmental statement alongside the additional Bill provisions in 2018 and 2019.

I hope Members agree that a huge amount of scrutiny has already taken place. There is also a board, which was strengthened last year by a new chairman, Allan Cook, who works closely with the executive to review the capability and capacity of HS2. It is the job of the chair and the board to ensure that the entire programme continues under scrutiny. I do not see what more another review will achieve, apart from adding another layer of bureaucracy and another cost, given that there have already been so many.

Let me now deal briefly with new clause 5. I thank my hon. Friend the Member for Eddisbury (Antoinette Sandbach) for being so patient. She has cited some very complicated cases, some of which have taken a long time to resolve. I can only apologise on behalf of HS2 Ltd if it has not worked as efficiently as possible with her constituents, or in providing information about local schools.

HS2: Buckinghamshire

Debate between Nusrat Ghani and Cheryl Gillan
Monday 29th April 2019

(5 years ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Nusrat Ghani Portrait The Parliamentary Under-Secretary of State for Transport (Ms Nusrat Ghani)
- Hansard - -

Completing HS2 is Government policy and is crucial to unlocking economic growth and improved productivity in the midlands and north. It is supported by Members on both sides of this House. I therefore have no intention of halting work on HS2 in Buckinghamshire or elsewhere. There are already 7,000 people and 2,000 businesses working to deliver the HS2 project, and early works are well under way. Once HS2 Ltd has reached agreement with its suppliers and the Government are satisfied about both affordability and value for money, we will make a full business case for phase 1. This will inform notice to proceed, which is the formal contractual process that enables each phase 1 supplier to move from design and development to construction. Notice to proceed is scheduled to take place later this year. The works that are now taking place are necessary to enable the construction of HS2 to move forward in accordance with the programme, following notice to proceed.

We are aiming for HS2 to be one of the most environmentally responsible infrastructure projects ever delivered in the UK, and managing its impact on the environment during construction is a high priority. HS2 will deliver a new green corridor made up of more than 650 hectares of new woodland, wetland and wildlife habitats alongside the line. More than 7 million new native trees and shrubs will be planted, to help blend the line into the landscape and leave a lasting legacy of high-quality green spaces all along the route. It will include more than 33 sq km of new and existing wildlife habitat—an increase of around 30%, compared with what is there now. Many of the early works that are now taking place on HS2 are activities aimed precisely at creating this environmental legacy. They are being done now to ensure that they become fully established as early as possible, alongside construction of the railway.

Cheryl Gillan Portrait Dame Cheryl Gillan
- Hansard - - - Excerpts

The notice to proceed for HS2 has again been delayed, I believe until December. In the meantime, enabling works continue to blight large parts of the county, and this error-ridden project is costing our local authorities more and more. The situation is critical, with the area of outstanding natural beauty suffering irreparable environmental damage from preparatory works, rather than the “legacy” the Minister just referred to, and the costs spiralling out of control, when this project could well be cancelled. Indeed, millions are being spent on consultants to try to reduce the costs, which will in all likelihood result in failure to deliver on environmental protections and promises.

Already hedgerows have been netted or removed, machinery has been brought in to remove mature oak trees, country road verges have been destroyed by HGVs, massive ugly earthworks have appeared at our prime tourist sites, construction worker camps are surrounded by prison-like barriers, and there is the horror of the depopulated areas where homeowners were forced to sell to HS2.

It is almost impossible to hold this monster to account. Written questions are answered so poorly that I have to submit freedom of information requests to elicit basic information. I want some straight answers today. Why is only a junior Minister with other responsibilities in charge of the largest infrastructure project in Europe, which costs more than Brexit? Surely it should have its own Minister, if not its own Department. In her written answer today and in her statement just now, the Minister gives the impression that the entire decision on the go-ahead of this project comes from her. Will she be the sole Minister responsible for issuing the notice to proceed?

Why has the cost of HS2 not been updated since 2015, and what are the actual costs at today’s prices? What is the latest evaluation of the cost-benefit analysis, and why has that not been done already? When will the Treasury review be completed, and will a full report be published? Is the delivery of HS2 still being flagged with an amber-red warning, and how regularly is Cabinet updated on this project? Has HS2 applied for and received all the environmental licences and permissions required to carry out this environmental vandalism in Buckinghamshire?

What level of control and monitoring does the Secretary of State exercise over the awarding of contracts and the finances, and if he does have a level of control, why has £1.7 million that was paid out in unauthorised redundancy payments not been recovered or any director held to account? What would it cost to cancel the project now? Why, with so many doubts and unanswered questions, will the Government not agree to a perfectly reasonable request from Bucks County Council to have a six-month pause to do a total re-evaluation of this project, which has already blown its timetable and its budget before it even has the go-ahead?

John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

The Minister’s use of the words “along the route” in her initial reply has somewhat widened the scope, which is no doubt music to the ears of the hon. Member for Stone (Sir William Cash), the hon. Member for North West Leicestershire (Andrew Bridgen) and, to judge by his grinning countenance, the hon. Member for South Dorset (Richard Drax).

Oral Answers to Questions

Debate between Nusrat Ghani and Cheryl Gillan
Thursday 14th February 2019

(5 years, 2 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Nusrat Ghani Portrait Ms Ghani
- Hansard - -

Stockton-on-Tees Borough Council receives almost £89,000 of bus service operators grant to support local bus services, and £75.5 million from the Government’s transforming cities fund has also been secured to improve local connectivity to Tees valley. We have not heard from Stockton-on-Tees Borough Council or the Tees Valley Combined Authority about using the extra powers available to them under the Bus Services Act 2017 to improve services and work more closely with local bus companies. If they were to get in touch, we could also let them know about the world of improvements they could deliver for the hon. Gentleman’s constituents.

Cheryl Gillan Portrait Dame Cheryl Gillan (Chesham and Amersham) (Con)
- Hansard - - - Excerpts

T9.   Who is controlling the money in the Department for Transport? In a written answer this week, the Minister tells me that in the last six months of 2018, HS2 spent £5,663,422 on 89 agency staff per month. That equates to just in excess of £120,000 in an annual salary. What on earth is going on in HS2? Who is making the taxpayer pay these amazingly overpaid prices for personnel on HS2? It is a waste of money; cancel it.

Nusrat Ghani Portrait Ms Ghani
- Hansard - -

I am well aware that my right hon. Friend has been a doughty and particularly inquisitive Member of Parliament on behalf of her constituents on HS2. She knows that there is a set budget to deliver HS2, and we must not forget the benefits it will bring across our country, demolishing the north-south divide and building a fairer country. This is more than a transport project; it is a transformative project linking eight of our 10 cities and investing in the midlands and the north of our country.

High Speed 2

Debate between Nusrat Ghani and Cheryl Gillan
Wednesday 12th September 2018

(5 years, 8 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Cheryl Gillan Portrait Dame Cheryl Gillan (Chesham and Amersham) (Con)
- Hansard - - - Excerpts

It is a pleasure to serve under your chairmanship, Mr Howarth.

I welcome yet another Minister for HS2 to the Front Bench. The turnover in Secretaries of State and junior Ministers responsible for this project at the Department for Transport has been regular, to say the least. I also congratulate my hon. Friend the Member for Stone (Sir William Cash) because he made many of the points that I wanted to make. I will try not to repeat some of them, although some inevitably bear repeating.

Back in 2009, when Andrew Adonis and the Labour party announced the project, I told him that not only was it going to damage my constituency, but that it was an unpopular and costly proposition, and would perhaps not benefit the country as a whole—it will certainly be paid for by the many and be used only by the few. Unfortunately, the incoming Government, of which I was a part—I tried hard to persuade my colleagues in Cabinet to drop the project—went for it. Today, we find ourselves in a situation in which not a single inch of track has been laid, but billions of pounds have already been spent.

To follow up on the point made by the hon. Member for Blackley and Broughton (Graham Stringer)—we first came into contact when I fought the Manchester Central European seat many moons ago—I am very lucky to have persuaded my colleagues to invest in tunnelling. That was not only for my constituents, but for the country as a whole, because this dreadful project is going through an environmentally sensitive area—an area of outstanding natural beauty. There is merit in looking at making the area a national park, although that may not be successful. Such a rare piece of our land, with fragile chalk streams, really deserves that protection. It is a shame that such protection does not cover the whole of the AONB but stops prematurely at the end of my constituency.

For me, this project has been one of poor management, poor corporate governance and failures in communication right along the way. Let me refer to a couple of constituency cases; in fact, I have a letter that I will hand to the Minister at the end, addressed to the Secretary of State, about yet another failure regarding a constituent. The issue is communication; as far as I am concerned, HS2 has not learned any lessons about communication with communities.

My constituent is troubled by the closure of Shire Lane, the partial closure of Roberts Lane and the completion date for the construction of the link road. Since last November, she has been given a range of dates, ranging from January this year to April and May, and now to September or even July next year. She has continually chased answers, only to be ignored or told that someone will get back to her.

My constituent’s complaints about HS2’s engagement can be summarised in terms of sporadic communication; broken promises; incorrect information; having to chase constantly, making her feel that she is a nuisance to officials; and the trivialising of her concerns. At the same, a very glossy engagement strategy brochure, which is a spin on public relations, has been delivered to her house. Goodness knows how much that cost to produce. It seems that HS2 is continually secretive. People must not be messed about like that.

My constituent received the first letter on 20 June, which stated that HS2 required land access. It said:

“we will need to enter your land to carry out surveys or investigations during the period from 23 July 2018 to 30 September 2018.”

The second letter, dated 22 August, was exactly the same, but changed the dates from 1 October to 31 December.

On the date of completion of the link road, the communications audit trail shows that HS2 took more than a month from the last known completion date for the link road to tell residents that it had been delayed another six months. That is not good enough. I will hand the letter to the Minister to pass to the Secretary of State. I am sure the Minister will look into this matter.

I had another case earlier this year that bears repetition. It was on compensation, which everyone seems to think is so highly paid to constituents who are thrown out of their homes. I raised this issue with the Secretary of State, and he had to fix it. After HS2 had agreed the compensation, my constituent wrote:

“Despite us having a clear and agreed contract for a year, signed in January 2017, having provided all the necessary documentation from our end, and HS2 Ltd being obligated by the contract to pay the sums to us within 21 days, three months later HS2 Ltd have still not fulfilled their side of it and made the additional payment to us.”

That transaction threatened a disabled couple’s move into their newly adapted home.

I think the Minister is familiar with the case, but it bears repetition because of the contrast with the lucrative high salaries paid to officials, which my hon. Friend the Member for Stone alluded to. HS2 paid at least £100,000 in salary and perks last year to 318 officials—up from 155 in 2015-16. It spent more than £600 million on consultants—well over double the figure the previous year. This is a taxpayer-owned project, but more than 25% of staff enjoy a six-figure remuneration package, including salary, bonus and company pension contributions. Four years ago, that proportion stood at 4%, and two years ago it was less than 17%. If we add that up—particularly the extremely expensive and often very aggressive and intimidating barristers who have been used in the hybrid Bill process—the costs really outweigh what is reasonably to be expected of a taxpayer-funded project.

I will not mention Carillion or the fact that the Department has not updated the costs of the project. There are so many areas in which this project falls down. For example, for years we pushed for a property bond scheme, but in May 2018, the Department set up a High Speed 2 property price support consultation, and it will publish its decision on the consultation exercise later this year. When will that consultation be published, and what are the chances of getting the property bond that has been promoted by many people?

The whole project is starting to slip and is out of control. The phase 2b Bill has been put back and will be tabled again in 2020. The Government say that will not have a bearing on the final completion date

Cheryl Gillan Portrait Dame Cheryl Gillan
- Hansard - - - Excerpts

The Minister is shaking her head, but I would like better clarification on that issue. It is depressing not only that the legislation is being halted and is slipping but that there are setbacks in the civil works. The initial costs for the main civil engineering contracts for the first phase of HS2 are £1 billion over budget. That will lead to delays in starting the works. Seven contracts covering the work were announced last July, estimated at £6.6 billion, but I understand those have slipped by at least six or nine months.

The Minister was shaking her head, but she will know how difficult it is to extract information about the project. I have been batting on about that for a long time. This is taxpayers’ money, and the project should be transparent. I understand that it is commercial in confidence, but it is not transparent. Indeed, if hon. Members try to read the documents, they will find a large amount are redacted. Minutes from meetings often are not published on the Government website in any timely manner. That goes against HS2’s framework agreement. The minutes are often meaningless. HS2 has published board minutes up to March 2018 as far as I know, but I am not sure that that fulfils its responsibility to engender public confidence and accuracy in the information it discloses. The Minister should address that. All minutes of all meetings should be published on a timely basis. HS2 is supposed to be committed to being an open and transparent organisation, but I am afraid that is far from the truth.

When it comes to my local area, I am exceedingly worried about my local authorities. They face potential local government reorganisation—we do not have a decision yet on that. The cost and burden on my county council and district council have been quite phenomenal. Neither will get back the time, money and true cost to our local institutions, and that is not to mention our parish and town councils, which have really been burdened in this matter.

I have nothing against the Minister, as she knows. We have known each other for quite some time, and I am very proud that she is a politician. She must not take this personally, but I have called for a dedicated Minister. The champion for the Oxford-Cambridge link, my hon. Friend the Member for Milton Keynes South (Iain Stewart), has called for a dedicated Minister on that project alone, yet HS2 is much larger and there is no sign of a dedicated Minister. He is a Minister just going into Government and has called for a dedicated Minister on something that is actually smaller and less complicated than this project.

I have been so disturbed by what I have read and heard recently about the failure to extract information about this project. One might think that I would get disheartened and get HS2 opposition fatigue, but I am afraid there is no such luck. Sometimes I feel I am the only person who is trying to hold the project to account, although my colleagues are doing a sterling job.

I wrote to the Secretary of State on 17 August because I was particularly perturbed that Sir John Armitt had called for the Government to invest £43 billion more in further transportation links so that HS2 could meet even the basic business assumptions made about it. I have asked the Secretary of State to ensure that the Government carry out a full evaluation of this project—its viability and its value for money for the taxpayer. These moneys could be spent on other areas of modernising transport and communications in the UK and on other matters. As can be seen in the newspapers today, many people think that the money would be better spent on health and education, certainly in view of the technological advances in transport. The Government are still playing catch-up on 5G and on other matters.

In the interests of the country and taxpayers, I hope the Minister, the Cabinet and the Secretary of State will respond positively to the request I made, which I copied to the Prime Minister, the Chancellor and the Chief Secretary to the Treasury for their consideration. Because of the major implications of this massive expenditure, the high costs and the poor corporate governance, HS2 should be completely independently assessed. If that results in a pause while that work takes place, I will be satisfied. I hope that HS2 will hit the buffers. It is not good value for money for the taxpayer.

--- Later in debate ---
Nusrat Ghani Portrait Ms Ghani
- Hansard - -

I know that my hon. Friend has raised that matter a number of times, including with the Select Committee. It is a detailed question that requires a detailed response. I am happy to provide him with a written response. I know that he has already had a response from the Select Committee, but I am more than happy to put things down on paper.

Phase 2a will connect Birmingham and Crewe from 2027, which is many years earlier than expected. Phase 2 will run from the west midlands to Manchester in the west and Leeds in the east, completing the network by 2033. We are committed to delivering to those timescales. Of course I am deeply aware that the project, despite its huge benefits, will have a significant impact on many people during construction.

Cheryl Gillan Portrait Dame Cheryl Gillan
- Hansard - - - Excerpts

I am grateful to the Minister for giving way, particularly as she is reading out some of the PR speech that I have heard before from Ministers about how marvellous HS2 is. Has she carried out an economic impact assessment on my constituency of Chesham and Amersham? Can she tell me exactly how we will benefit or what damage will be done to the economy? Can she give me detailed figures to show how HS2 benefits my constituency?

High Speed Rail (West Midlands - Crewe) Bill

Debate between Nusrat Ghani and Cheryl Gillan
2nd reading: House of Commons & Allocation of time motion: House of Commons & Carry-over motion: House of Commons & Money resolution: House of Commons & 2nd reading & Allocation of time motion & Carry-over motion & Money resolution
Tuesday 30th January 2018

(6 years, 3 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Nusrat Ghani Portrait Ms Ghani
- Hansard - -

We are working through the details. We will try and do it as quickly as we can, but it will be shortly—this year. I am sorry; I cannot provide more details now, but I will write to the hon. Member and let her know. This is very complicated and cannot be rushed. We need to make the decisions for the right reasons.

Cheryl Gillan Portrait Dame Cheryl Gillan
- Hansard - - - Excerpts

I welcome the passion with which the Minister is approaching her brief, but may I bring her back down to reality? The constituent I mentioned in my speech, who has been so badly affected by HS2 phase 1 and so badly let down by HS2 Ltd, which is not paying the bills it promised, and is contracted, to pay, is now on antidepressants and fears that this sort of thing is happening to many other people up and down the line. Could the Minister put some of her passion for the project into protecting the people who are so badly affected by the project?

Nusrat Ghani Portrait Ms Ghani
- Hansard - -

My right hon. Friend has raised many issues about HS2 Ltd, its relationship with our constituents and its poor performance in communication previously, with the Secretary of State and with Ministers who have held my current position. I will indeed endeavour to hold HS2 Ltd to account. I am more than happy to take on board any cases that my right hon. Friend wishes to present to me, and I am grateful for her words in opening her speech. I will do my best to outlive previous Ministers in this position.

To turn to the hon. Member for City of Chester (Christian Matheson), the consultation on the Crewe hub that we published last year included service pattern options that will reap benefits for Chester, north and south Wales, Shrewsbury and the wider region. As I mentioned, we expect to respond to that consultation shortly.