Energy Transmission Infrastructure (Carmarthenshire) Debate

Full Debate: Read Full Debate

Energy Transmission Infrastructure (Carmarthenshire)

Roger Williams Excerpts
Tuesday 19th November 2013

(10 years, 5 months ago)

Commons Chamber
Read Full debate Read Hansard Text
Jonathan Edwards Portrait Jonathan Edwards
- Hansard - - - Excerpts

The hon. Gentleman makes a valid point. Indeed, many tourism operators in my constituency believe that developments on this scale are a disincentive for them to invest further in the sector, which has been seen by all levels of government as a key part of our local economy.

Such is the scale of the proposed transmission project that there will be three different consultation processes before a final route is determined. We are currently in the middle of the first two consultation periods. One of the key elements of my submission to the first process was that local people feel that they are being excluded and that the process has not been open and transparent, with only selected organisations and community councils asked to contribute and no full public engagement.

The first consultation period is extremely significant, because following this initial stage the development company, Western Power Distribution, will have chosen a preferred route from four options. All four routes begin in the north of Carmarthenshire near technical advice note area G—which is the Labour Welsh Government’s jargon for the concentrated wind-generating development zone in the Brechfa forest—and terminate at the National Grid substation in Llandyfaelog in the south of the county. That is a connection distance of more than 30 km.

Villages such as Cwmffrwd, Idole and Llandyfaelog more than 20 miles away from Brechfa forest will now find themselves affected by a project many miles away. As I have said, they have been hoodwinked by the Department of Energy and Climate Change and the multinational companies building wind farms in the north of the county, because the subsequent transmission project is a fait accompli.

To balance matters out, perhaps I should aim my guns at the Labour Welsh Government as well. They determined the strategic development zones for energy generation. In the case of the Brechfa forest, they did so in the full knowledge that the local electricity grid had insufficient capacity to service the power generated by the new wind farms.

It is no good Labour Welsh Ministers saying, “Nothing to do with us, guvnor”, and pointing the finger at the Department of Energy and Climate Change. It is a dereliction of duty on their behalf to have selected strategic zones, in the case of Brechfa, so far away from the national grid that this large transmission infrastructure project is now required.

More than 200 people attended the public meetings that I have mentioned. It is fair to say that feelings ran extremely high. The major concern raised with us during those meetings was the visual impact of the poles that will support the overhead cables envisaged by Western Power Distribution. I am saying this not just because I am a native, but because Carmarthenshire is undoubtedly one of the most beautiful parts of the entire British Isles.

Roger Williams Portrait Roger Williams (Brecon and Radnorshire) (LD)
- Hansard - -

The hon. Gentleman and I share the privilege of representing part of the Brecon Beacons national park. Does he agree that many other parts of his lovely constituency have a landscape equivalent to that of a national park, and that the project will be a huge problem for the quality of such landscapes?

Jonathan Edwards Portrait Jonathan Edwards
- Hansard - - - Excerpts

The hon. Gentleman makes an important point. In areas of outstanding natural beauty, cables will have to go underground, but the Tywi valley, although extremely beautiful, is not designated as such and is therefore exempt, so that point is vital.

Carmarthenshire is known as the garden of Wales for good reason, with the Tywi valley hosting the National Botanic Garden of Wales and Aberglasney gardens, both of which are Welsh national treasures. During the public meetings I held on the issue, it was clear that only undergrounding the cables would be acceptable to those who attended.

That is the position of Carmarthenshire county council, which unanimously supported a Plaid Cymru motion:

“That Carmarthenshire County Council finds it totally unacceptable that the proposed Brechfa Forest wind farm(s) National Grid connection should be made via an overhead line supported by wooden pylons. As the Council itself has no statutory power in this matter, we ask the UK Energy Secretary to ensure that the connection cable is laid underground for its entire length”.

There is a clear precedent for undergrounding in Carmarthenshire. The Llyn Brianne hydroelectricity scheme in the north-east of my constituency was connected to the national grid via 20 miles of undergrounding in 1996.

In a one-sentence reply, the developers have stated that the cost of undergrounding is prohibitive. In this case, however, that is simply not good enough. In an answer to a parliamentary question, the Minister told me:

“In 2011, National Grid commissioned an independent study to give more clarity on the practicality, whole life costs and impacts of undergrounding and subsea cabling as alternatives to overhead lines. The Electricity Transmission Costing Study, prepared by technical experts and overseen and endorsed by the Institution of Engineering and Technology was published in January 2012… It contains estimated cost ranges for overhead lines and underground technologies.”—[Official Report, 8 July 2013; Vol. 566, c. 66W.]