High Speed 2 Railway Line: Buckinghamshire

(asked on 21st January 2015) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, what instructions he has given to HS2 Ltd on minimising transport disruption in Buckinghamshire during the construction of High Speed 2 (a) affecting the emergency services and (b) generally; and if he will make a statement.


Answered by
Robert Goodwill Portrait
Robert Goodwill
This question was answered on 26th January 2015

The Government’s aim is to ensure that traffic disruption caused by the construction of HS2 is reduced as far as reasonably practicable. This commitment is set out in the Environmental Minimum Requirements (EMRs) and draft Code of Construction Practice (CoCP) for Phase One of High Speed Two (HS2), as well as the various controls set out in the hybrid Bill.