(3 days, 21 hours ago)
Lords ChamberMy Lords, this group of amendments relates to the regulation-making powers governing the nature of the restoration levy. The powers provide the framework for how the levy will operate and how it will be used to unlock development and deliver nature restoration. Let me reassure the noble Lord, Lord Framlingham, that we have a whole group on CPO powers, group 9, so I am sure we will have further discussions about that then. The substance of the levy will be governed by secondary legislation, which will be laid under the affirmative procedure following Royal Assent. It is worth highlighting that, as well as receiving scrutiny from Parliament, the relevant charging schedule will form part of the consultation on each EDP, and, to reiterate, the use of an EDP will be a choice for developers.
Turning to Amendments 256 and 313, tabled by the noble Lord, Blencathra, the Government have designed the nature restoration fund to work on a cost-recovery basis, with actions required to deliver EDPs funded by the developers who use the EDP. The framework of powers ensures that the levy can be designed to achieve this aim, and that all appropriate costs can be met through the levy. This follows the polluter pays principle, as the EDP will address the negative impact from development, so it is right that these costs be met through the levy. Given the range of matters that may need to be addressed through an EDP, there may be circumstances where the acquisition of land is required. Where this is the case, it is only right that this cost be recovered through the levy, rather than through public funds, whether the land is acquired by agreement or through compulsory purchase.
While I recognise the concern around the use of compulsory purchase, these are important powers to ensure sufficient certainty that, where necessary and appropriate, land can be acquired for delivering conservation measures. This again highlights the importance of consultation on each EDP to ensure proper scrutiny before the EDP is considered by the Secretary of State.
I am sorry to interrupt again, and I appreciate that other amendments deal with this, but the very simple principle is that if you are buying somebody’s land, you should pay a fair market price for it, surely.
The noble Lord is correct, and there are provisions for that in the process.
Turning to Amendment 307, tabled by the noble Lord, Lord Gascoigne, I note that he is a non-native species of Surrey; I hope he is not an invasive species of Surrey. His amendment would limit what administrative expenses could be included within a charging schedule to those included in Section 11 of the Natural Environment and Rural Communities Act 2006. These powers were drafted long before the NRF and extend solely to charging for providing a service and for licences. Natural England’s role in the NRF is wider than simply providing a service. It will be drafting EDPs, conducting surveys and analysis to work out the most appropriate conservation measures, and consulting on them and presenting them to the Secretary of State. It will subsequently have administration costs as part of implementation, such as contracts with service providers and administration of levy collection. Many noble Lords have also referred to the need for a proper scientific basis, and it will be important that it be able to deliver that scientific evidence.
As mentioned previously the Government’s objective is for the NRF and Natural England’s role in delivering it to operate on a cost-recovery basis, which would not be possible if we were to accept this amendment. To ensure value for money for the taxpayer, it is important that Natural England can recover all appropriate costs as part of the levy.
I turn to Amendment 308A from the noble Lord, Lord Gascoigne. We agree with the noble Lord. The Government are clear that money from nature restoration levies will be used to deliver the EDP and secure the necessary conservation measures. While Natural England will be the organisation drafting EDPs on behalf of the Secretary of State, it will not always be best placed to deliver the conservation measures, so we will work with other bodies when securing those measures. We will set out a procurement strategy in due course that will speak to the issues the noble Lord is driving at through his amendment.
When Natural England works with or through partners it will remain bound by the provision in Clause 71 to
“spend money received by virtue of the nature restoration levy on conservation measures that relate to the environmental feature in relation to which the levy is charged”.
Money used in this way cannot simply be used for other purposes. For that reason, Clause 71 still requires that this money be monitored and accounted for. On the basis that there is always a link between the levy and the delivery of conservation measures, regardless of whether Natural England is the body delivering them, I hope that the noble Lord will not press his amendment.
I turn to Amendment 309, again tabled by the noble Lord, Lord Gascoigne. As the noble Lord will be aware, the Government have tabled an amendment making it explicit that Natural England can only deliver network measures—measures that do not directly address the impact on a protected site but improve the same feature elsewhere—where it considers that they will make a greater contribution to the improvement of the environmental feature in question than measures that address the impact of development locally.
Under these proposals, Natural England will be required to state how it reached this conclusion with reference to the best available scientific evidence. Crucially, network measures could never be used where to do so would result in the loss of an irreplaceable habitat, as this would inherently not pass the overall improvement test. More generally, the amendment would limit actions within the boundary of a local planning authority that may not align with the ecological boundary of, or environmental impact on, a protected site. I trust that this speaks to the substance of Amendment 309, given that the Government’s amendment provides an ecological lock on the use of these measures by requiring Natural England to pay regard to the need to protect the overall coherence of the relevant site network.
Amendment 310, also from the noble Lord, Lord Gascoigne, would require the Secretary of State to bring forward regulations covering all the matters listed within Clause 71(3). There are many indispensable elements to the levy regulations that will be brought forward to ensure that this legislation can operate effectively. However, framing the power as a “may” rather than a “must” provides the Secretary of State with discretion when deciding whether it is necessary to bring forward specific requirements in regulations.
I turn to Amendment 312 from the noble Lord, Lord Gascoigne. The Government agree that transparency is vital throughout the EDP process. That is why the Bill already includes reporting requirements at the midpoint and endpoint of an EDP that will include information about the cost of conservation measures. In addition, Natural England will be required to publish annual reports across the NRF that will include a summary of Natural England’s accounts, with information about the total amount of levy received and the amount spent on conservation measures each year. Through this process, we are confident that there will be an adequate level of transparency in respect of both costings and expenditure.
I turn to Amendments 314 and 315, tabled by the noble Lords, Lord Gascoigne and Lord Blencathra. As I set out previously, removing Natural England’s ability to recover administrative expenses would require the Government or Natural England—and as a result, the taxpayer—to shoulder the cost of creating EDPs and any administrative costs of implementing them. Similarly, removing Natural England’s ability to include previous expenses would directly impact this and remove the Government’s ability to forward conservation fund measures to Natural England, which would then recover the money through the levy when development proposals come forward before repaying the Government. Furthermore, limiting the ability of Natural England to reserve money for future expenditure would restrict its flexibility to secure the most appropriate conservation measures and plan for unforeseen circumstances. Allowing these costs to be included within a charging schedule will ensure the long-term viability of the nature restoration fund and provide greater certainty that environmental outcomes will be achieved.
In a similar vein to previous amendments, Amendment 301A, tabled by the noble Lord, Lord Teverson, and spoken to by the noble Baroness, Lady Parminter, would require that money accepted through the nature restoration levy be classified as additional to the core funding of Defra or Natural England. I can assure the noble Lord that the legislation is clear that the nature restoration levy is provided to Natural England to deliver on the EDP and cannot be used for purposes outside the EDP. As part of this, and to ensure transparency, regulations may require Natural England to account separately for any money received through the nature restoration levy that would prevent this from being merged with central budgets.
Although the levy can be used by Natural England for administrative expenses in connection with an EDP, this must, as the drafting suggests, be in connection with an EDP. This might cover the costs of drafting and implementing a specific EDP, or a proportion of the cost of setting up a digital platform for the NRF generally, but the nature restoration levy would not affect the core budget of either Natural England or Defra, which remains a matter for the Government. With this explanation, I hope that the noble Lord will feel comfortable to withdraw his amendment.
On Amendment 307A, the nature restoration fund is being established to support development, so it is vital that the nature restoration levy does not undermine the economic viability of development while still being able to secure sufficient funding to deliver the necessary conservation measures to meet the overall improvement test. There is no legislative requirement to include contingency in the levy, as framed by this amendment. However, it is important that the regulations allow for circumstances where it may be necessary or prudent to include a precautionary buffer to support the delivery of conservation measures, whether through back-up conservation measures or simply because the primary conservation measures may cost more than originally anticipated.
Crucially, a draft charging schedule will include details of how the levy has been calculated. If a contingency were included in the charging schedule, this would form part of the draft EDP, which will be subject to consultation before being considered by the Secretary of State. While I am confident that the nature restoration levy will be set at a fair price that supports development, the use of EDPs will remain voluntary in all but the most exceptional circumstances. A developer is therefore free to use the existing system if they do not think the EDP or the levy is appropriate. Developers will have full clarity on what they are paying—