Debates between William Cash and Cheryl Gillan during the 2015-2017 Parliament

HS2 Phase 2: Consultation

Debate between William Cash and Cheryl Gillan
Thursday 24th November 2016

(7 years, 6 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
William Cash Portrait Sir William Cash (Stone) (Con)
- Hansard - -

I want to make clear, on behalf of my constituents, my very strong objection to the proposals in section 4 of the document entitled, “HS2 Phase 2a: West Midlands to Crewe design refinement consultation”. I have already registered my objections to HS2 on many, many occasions. My right hon. Friend the Member for Chesham and Amersham (Mrs Gillan) and my hon. Friend the Member for Stafford (Jeremy Lefroy) have also taken a very strong line on this whole subject for a very long time. There will be a Bill, presumably after December. At some point, there will be a hybrid Bill, on which my constituents will be able to petition if they need to do so.

I want to set out my objections to these initial proposals. They amount to a railhead at Yarnfield, in between the proposed HS2 route and the M6, which is likely to become, we believe, a permanent maintenance facility to replace the infrastructure maintenance depot at Crewe. Stone Town Council has said in its objections that it is extremely disappointed with the level of consultation of Stone residents. That does not really fit in with the Minister’s saying in the previous debate, in which I took part with my right hon. and hon. Friends, that he was absolutely determined that consultation would be at the very highest level. I have to say that my constituents do not believe that that has been effective in this particular case, and I ask him to look into that.

I recently held a public meeting with my constituents in Yarnfield village hall, and the depth of frustration and anger at the proposals, which have caused extreme anxiety in the local area, was evident to all, as in a meeting with local residents that I had on the same day in Baldwins Gate, further to the north. I will hold a further public meeting on 3 December in Walton community centre.

The Yarnfield railhead sliver is totally new in the September 2016 consultation. The railhead was meant to have been in Crewe, and this is a shock to all my constituents in the towns of Stone and Eccleshall, and all the villages in and around the area, particularly Yarnfield. This is not a conceptual design, as the others have been; it is a detailed design that required much more time for consultation of the affected people. HS2’s standard consultation process was therefore hopelessly inadequate. Why did HS2 identify the Yarnfield area as appropriate instead of Crewe?

My constituents have raised an important issue in relation to the options appraisal in the community area report for my constituency. It contained eight options, but four were not taken forward. A brief commentary is provided with regard to only one of the four rejected options, which is Madeley. Of the remaining three, one is not related to Stone—option 5, for Crewe—and this is described in one section as the preferred environmental option. Of the three remaining Stone options, option 8—the Stone hybrid, now selected by HS2—seems to be a combination of options 2 and 3, but we have had only a very limited amount of time to consider all this. We believe that there has been misinformation about the number of jobs and a lack of evidence to demonstrate that there was availability in Crewe. This seems to have been overridden, and we do not understand why it has happened.

With regard to the railhead south of Crewe at the northern end of the phase 2a route, the consultation paper does not explain why Yarnfield must be chosen, nor why the so-called design development work would lead to the identification of Yarnfield as appropriate. The reason to move the location from Crewe to Yarnfield cannot be that Crewe is now to have 370 new homes, some of which have already been built. That would be baffling, because the site at Yarnfield is even more inappropriate given the positioning of local residential buildings.

The disruption that has already been caused by HS2 project preparation throughout my constituency, including Stone and Swynnerton, on top of the ongoing works at Norton Bridge that have been shattering the local area and having a great impact on nearby residents, has been excessive. Therefore, the attempt to minimise disruption in Crewe only to maximise it in Yarnfield does not seem, by any means, to be a good idea or a sensible option.

Cheryl Gillan Portrait Mrs Cheryl Gillan (Chesham and Amersham) (Con)
- Hansard - - - Excerpts

Does my hon. Friend agree that we need better communications with HS2? It has started to do the exploratory groundworks in my constituency, but it failed to get the correct permissions in Chalfont St Giles and since then a lorry has had an accident there. I think that we as MPs need a hotline to HS2 and to the Department, so that we can report some of the aggravation that is going down in our constituencies. If it is already happening in my hon. Friend’s constituency, all I can say is that I have a great deal of sympathy, because it is certainly happening in mine.

William Cash Portrait Sir William Cash
- Hansard - -

I am extremely grateful to, and concur with, my right hon. Friend. Accidents have occurred and I think that a hotline is an extremely good idea. I hope that the Minister is listening.

An analysis of the population of Yarnfield and the Stone area shows that over-65-year-olds make up a significant number of the local population. The proposed option will do nothing to enhance, let alone accommodate, an environment to support such an elderly population. Many residents in Yarnfield who are elderly and infirm will have to live with those proposals being imposed on them. Not only will they create dust, noise, light pollution and total disruption to all the residents of numerous surrounding villages and the Stone town, they will also ruin the lives of many who have chosen to retire to a rural environment and who have settled in the area in good faith. People in Stone town itself are also deeply concerned.

HS2 Ltd: Communication and Engagement

Debate between William Cash and Cheryl Gillan
Thursday 27th October 2016

(7 years, 6 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Cheryl Gillan Portrait Mrs Gillan
- Hansard - - - Excerpts

I am grateful for the break in proceedings and for that kind intervention by my hon. Friend. As I have said before, it is never possible to over-flatter a politician! I feel passionately about this issue, as do many others, and if I have the freedom to speak, I am very happy to reflect the views of others. I know that my hon. Friend the Member for Stafford (Jeremy Lefroy) has himself worked very hard on trying to mitigate this scheme. In fact, I am now alongside two Staffordshire Members. I am second to none in my admiration for the support that I have had from my colleagues who, I think, feel as strongly as I do.

At the time of Third Reading, I tabled amendments proposing the introduction of an adjudicator—an independent regulatory body that could deal with complaints swiftly and fairly. People who are affected by the scheme would have confidence and faith in such a body, and I think that it is still badly needed. I urge the Minister to think about the amendments again before Royal Assent, to accept them and to try to create a body that would give confidence and faith to the people who are being so badly affected.

William Cash Portrait Sir William Cash (Stone) (Con)
- Hansard - -

As my hon. Friend the Member for Stafford (Jeremy Lefroy) is aware, we have a serious problem in our part of Staffordshire. What my right hon. Friend the Member for Chesham and Amersham (Mrs Gillan) is suggesting would help enormously to deal with the frequent complaints about the manner in which HS2 Ltd is operating, which is causing local people enormous anxiety. I shall be seeing some of them over the weekend to discuss these very questions. I am deeply grateful to my right hon. Friend, and totally endorse her proposal.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - - - Excerpts

I thank my hon. Friend for what he says. We spent some time drafting the amendments, and some serious and senior legal brains were brought to bear. The Minister is new to his post, so he might not be as familiar with this project as the rest of us, and this would be a good opportunity for him to review my proposal. Then at least I would feel that it had been examined and considered before being rejected, whereas at the moment I feel that the proposal was rejected out of hand because it came from someone whose constituency was affected so badly by the scheme.

I am astounded by the lack of information that HS2 Ltd has about communications. I do not know whether the Minister has had a chance to look at the answers that have been supplied to my written questions over the past fortnight. In preparation for the debate, I asked for the annual budgets for communication and engagement by HS2 Ltd since 2010. The response stated that the figures could not be provided, as

“the amount of time spent on communication and engagement activity is not centrally tracked.”

I am astounded that, in spite of all the external criticism and scrutiny of its poor communications, HS2 Ltd is not even keeping track of what it is spending, how it is spending, and who is doing what.

William Cash Portrait Sir William Cash
- Hansard - -

The cost of HS2 started at £30 billion, then rose to £50 billion, and is now increasing further. According to the latest estimates from all the experts, it is rising exponentially. One can imagine that it might end up being £80 billion or even more, in which case it would cost more than Hinkley Point, the Heathrow development and a development at Gatwick, if that were also to take place. We are talking about a payment of massive sums for what many people regard as a badly thought out project that will cause a great deal of anxiety and trouble.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - - - Excerpts

It is a case of the three Hs: Hinkley, Heathrow, and HS2; and the greatest of them all is HS2. The Minister has probably heard me say this before, but I still think that the project is so gargantuan that it deserves to be overseen by a dedicated Minister who would keep an eye on it. A sum of £80 billion is larger than the budgets of many Departments of State. It is absurd to think that five Secretaries of State and as many Ministers have overseen this project over a comparatively short period. The lack of continuity is ridiculous. Now we have lost the chief executive, of course, who is going to Rolls-Royce. We have an interim chief executive—Mr Hill, I believe—who comes from CH2M, which has just received a bonus from HS2 for some of its works, and I believe is still in the running to bid for contracts. The arm’s length relationship with contractors does not seem to have been maintained in the current circumstances.

My right hon. Friend the Member for South Northamptonshire asked me to raise particular communications flaws in the need-to-sell scheme. Apparently, constituents still find it difficult to speak to a named lead on their case and cannot retrieve information from HS2 Ltd until they have made an application. On Tuesday, in reply to a written question inquiring about the effectiveness of the scheme, the responding Minister told me that it was operating fairly and as intended. That is certainly not reflected in my right hon. Friend’s remarks to me, so that is worth looking into. I hope that the Minister will respond positively to that.

I will not go into the inadequacy of the legislative process through which the HS2 Bill is being put through this House and the House of Lords. That is a matter for another time but, needless to say, the process itself causes a great deal of confusion and consternation. My right hon. and learned Friend the Member for Kenilworth and Southam (Jeremy Wright) raised with me the excellent point that better communication and provision of information would have negated the need for the House of Commons Select Committee to hear so many petitions. Constructive engagement beforehand could have promoted a dialogue away from the Committee Room, and thus speeded up the passage of the Bill. I think that people felt the only way they could communicate with HS2 Ltd was by depositing a petition and coming along in person to make their case.

I also wish to highlight the poor practice of corridor deals during the Select Committee process. The relocation of the construction haul road in Great Missenden in my constituency was agreed in principle between Buckinghamshire County Council and HS2 Ltd in such a deal. The promise by the promoter altered the evidence given thereafter in Committee and, as it stands, the pledge has not been fulfilled.

The nature of these corridor deals means that vital discussions are not transparent and assurances cannot be enforced. In this case, my constituents feel they are left in a very uncertain and unclear position as to HS2’s intentions towards a traffic management plan that will have an enormous local impact at Great Missenden.

My right hon. and learned Friend the Member for Kenilworth and Southam also asked me to raise the unsatisfactory fact that constituents need to resort to submitting freedom of information requests to obtain meaningful and detailed information. Once again, such information should have been available from HS2 Ltd at the outset, and it is a great shame that it does not display greater transparency. It must understand that I, as an MP—I think I am speaking for my hon. Friends in the Chamber with an interest in the matter—have always approached this on a twin-track basis. If I could not persuade the Government that this was not the scheme in the right place at the right time, and going to the right places, I would be working hard to mitigate its effect on my constituency, and especially on the area of outstanding natural beauty. However, it always seems to me that HS2 thinks that MPs are working against it, yet if this scheme is going to go through, we will have to accept that, but we need to work with HS2 to improve the outcomes for the people we represent.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - - - Excerpts

What is so depressing is the fact that the lessons from phase 1 that we have tried to point out do not seem to have been learned, and the mistakes are being repeated in phase 2. The burden of supplementing HS2’s poor performance has certainly fallen disproportionately on local authorities. I am fearful about the next part of the process and the planning that will follow, because there will be more and more burdens on our local authorities, whose budgets—let’s face it—are stretched as it is.

William Cash Portrait Sir William Cash
- Hansard - -

As my hon. Friend the Member for Stafford implied, the fact is that whatever is decided regarding the current Bill as it goes through the House of Lords will inevitably be applied as a precedent for the next Bill. That is why we need to follow closely what my right hon. Friend the Member for Chesham and Amersham says. I congratulate her on doing everything possible to get this right now.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - - - Excerpts

Separately from giving evidence and making recommendations on how we should change the procedures of the House, I think that everyone would agree that it is inequitable that our Standing Orders prevent Members of Parliament from appearing as petitioners in the other place. The Chairman of the Committee had no choice but to interpret the Standing Orders in that way, but to remove the right of advocacy from Members of Parliament seems self-defeating and inadequate, and I am sure that Members of both Houses will want that to change.

The burden on local authorities, especially in relation to communications, has been astronomical. The leader of Buckinghamshire County Council told the House of Lords HS2 Select Committee on Monday that the council had spent £110,264 in 2015-16 on community liaison relating to HS2. That was entirely to cover for HS2’s poor communications. The council has asked for retrospective compensation to recover those costs, which I think is entirely reasonable. I hope that the Minister will agree to that request. If he cannot do so at the Dispatch Box today, perhaps he will do me the courtesy of looking into the matter to see how we can compensate our local authorities.

I would like the Minister to note that I find it incredible that a county council can provide actual figures for communication and community engagement, down to the last pound, whereas HS2 Ltd cannot do so. Indeed, the county council has since incurred further costs in assisting HS2 Ltd’s groundwork investigations, as its staff are consistently used to help to mediate between HS2 Ltd and residents when intentions to access land have not been adequately communicated. HS2 Ltd could and should be doing that job satisfactorily on its own, if only it had the will. Prior to the introduction of the local engagement managers, local authorities were expected to plug the gap in communication and to provide residents with information that was not readily available from HS2 Ltd. The Minister should bear in mind the fact that that was all done at the councils’ own expense.

It is not just local authorities, parish councils and residents that are affected in this way; HS2 Ltd’s poor engagement reaches into a wider constituency. I have been contacted by the Woodland Trust, which reports that it has not been engaged on the independent review of biodiversity, as recommended in the House of Commons Select Committee, and that it might now have to petition the House of Lords without the information it needs. It also tells me that information regarding third-party planning applications has not been forthcoming from HS2 Ltd, and that that has caused unacceptable delays in compensation payments. A project of this size that brings with it such a heavy burden on our environment, in particular the violation of the AONB in the Chilterns, really should ensure that it deals with the detail and follows up with the environmental organisations that are trying to help to mitigate the project’s impact on the environment.

I ask the Minister to take note of the ongoing communication failures and to ensure that he will make sorting them out his priority. This catalogue of errors has considerably hindered HS2 Ltd’s operation—it is the company’s fault—and is costing the taxpayer even more money. The Minister needs to consider creating a scrutiny body with teeth to hold the organisation to account, especially with construction fast approaching.

HS2 Ltd needs a better attitude towards the affected people. When I was preparing for this debate, I thought of two main themes that I wanted to leave with the Minister. First, I want to ensure that there is an overhaul of the communication and engagement strategy and the attitudes of HS2 Ltd. That should be considered at the highest level of the Department for Transport. Secondly, echoing the interventions from my hon. Friend the Member for Stone (Sir William Cash), I want to ensure that this communication calamity never happens again. Residents who received substandard treatment during phase 1 should be the exception, not the rule. If residents are going to be treated the same way under phase 2, the taxpayer will be paying even more for the project than is anticipated.

We have to reconsider how we do major infrastructure projects. We had an announcement this week on Heathrow, which I welcomed because it will be of economic benefit to Buckinghamshire, my constituency and my residents. We finally got a decision after the Davies commission and years of investigation—the project has been examined from every angle. HS2, however, was written on the back of an envelope by a Labour Transport Minister and immediately adopted by the coalition Government. All those processes were not followed. One system is far too long and the other is far too short. We need to find a way of ensuring that our infrastructure projects are the right projects in the right places, and that communications and engagement are of the highest standard, otherwise greater problems will emerge as such projects progress.

I do not usually talk at such great length and did not realise that I was going to have the luxury of taking so many interventions. I thank my colleagues in the Chamber for their support today, particularly those who must remain silent. I hope that the Minister will assure me that he will use his influence radically to re-evaluate how HS2 Ltd deals with our constituents, and that he will embed a culture of respect, transparency, openness and improved communications.

High Speed Rail (London – West Midlands) Bill

Debate between William Cash and Cheryl Gillan
Wednesday 23rd March 2016

(8 years, 2 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Cheryl Gillan Portrait Mrs Gillan
- Hansard - - - Excerpts

I drew the House’s attention to that report in a point of order. The report is appended to today’s debate, but of course there was no possibility of tabling amendments that referred to that report in an attempt to alter HS2’s behaviour.

New clause 2 is designed to ensure that all local authorities are properly compensated for any damage to roads as a result of HS2 constructions. As others have confirmed, that vital safeguard should be added to the Bill. The Secretary of State, who is now in his place on the Front Bench, visited my constituency earlier this month and saw at first hand some of the problems that my constituents face. I am grateful for that visit. He also saw the problems we have in Buckinghamshire with potholes. I am particularly concerned about the roads in and around Great Missenden. Quite by chance, my right hon. Friend witnessed maintenance works being carried out on those roads during his visit.

Buckinghamshire County Council highways authority estimates that it will spend about £7.5 million on pothole-related maintenance over the next five years. That figure takes no account of patching, resurfacing, drainage, road sweeping and other related costs. I believe that considerable additional costs will arise from the large number of heavy goods vehicles pounding their way up and down some of Buckinghamshire’s fragile roads. Local authorities may well be reimbursed for reasonable costs, but what are reasonable costs? I want them to be reimbursed fully and I want that to be enshrined in statute, to make sure that the provision is both sufficient and justiciable.

New clause 3 is intended to increase the amounts allocated by the Department for Transport to the business and local economy fund and the community and environment fund from £30 million to £150 million. The £30 million originally announced for those funds to assist those affected by HS2 has been felt across the board to be meagre and insufficient, especially as the funding is intended to cover the entire route of phase 1. The Select Committee acknowledged the significant shortfall and the Government’s response to its final report stated that the sum would be increased to £40 million. I contend that that is not enough. The impacts of the project will be long standing and severe for the environment, local authorities and communities. Through new clause 3, I propose that the funding be increased to £150 million to give those affected the compensation they deserve and to ensure that adverse effects are minimised.

William Cash Portrait Sir William Cash
- Hansard - -

Both of us have signed new clause 33 on compensation by reference to a property bond. I wanted to put that on the record. My right hon. Friend is doing a great job, and I do not want to take up the time of the House to refer to new clause 33, knowing that she agrees with me.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - - - Excerpts

I am grateful to my hon. Friend, and grateful for the support that I have received from colleagues across the piece.

On new clause 3, there is currently no information on how the funds will be divided, which areas will be prioritised or how the money could be spent. There is also no clarification of whether, for example, the funds to be allocated will include the moneys already allocated to the Colne valley. Will those come out of this funding envelope? There has been a suggestion that the money will be delivered locally through local enterprise partnerships, but that would be most unsuitable. In Buckinghamshire, for example, we have two overlapping LEPs. How would the money be administered? I think it should be kept separate from the LEPs and genuinely given to local groups so that they can decide how best to distribute the funds. I urge the Minister both to increase the funds and to provide further details on how they will be administered.

The last new clause to which I shall speak in this group is new clause 4, which deals with compensation. All the MPs who have constituencies along the route will know that compensation issues have caused great worry and stress to our constituents, and many of the recommendations of the HS2 hybrid Bill Select Committee, although welcome, have yet to translate into changes to the schemes. The Select Committee’s report in February 2016 stated that

“the Government said that it would work to implement a revised process for the valuation of properties for ‘Need to Sell’ that will allow more local valuers to be used”.

That review was promised for autumn last year, but we are still waiting.

The Department for Transport’s response to the Select Committee report is silent on the valuation point, and although a response was promised before Third Reading, when I last looked I had not yet received that. I may be wrong—HS2 tends to slip out its documents just in time for debates, which I think is poor practice. In this case such poor practice is affecting people’s lives. Implementing a fair valuation process for property owners who are receiving unacceptably low offers from HS2 is of paramount importance.

I still have a large number of constituents who have been negotiating with HS2 for months to get a fair price for their property, and I know from colleagues that it is a similar story up and down the route. I have been appalled at the treatment of individuals, who have had to employ expensive lawyers even to get timely and rational answers from those employed by HS2 or from HS2 itself. My colleagues and I have raised these points for years, yet there continues to be a litany of errors from HS2. There have been internal emails that are rude and disrespectful about constituents. The Public Administration and Constitutional Affairs Committee report published earlier today refers to the Parliamentary and Health Service Ombudsman report, which accused HS2 of being guilty of maladministration. I believe that that has characterised the way in which HS2 has dealt with people who have lost their houses, their businesses and their land.

European Union Referendum Bill

Debate between William Cash and Cheryl Gillan
Monday 7th September 2015

(8 years, 8 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts