50 Alison Seabeck debates involving the Ministry of Defence

UK Submarine Supply Chain

Alison Seabeck Excerpts
Wednesday 10th July 2013

(10 years, 11 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Philip Dunne Portrait The Parliamentary Under-Secretary of State for Defence (Mr Philip Dunne)
- Hansard - - - Excerpts

It is a great pleasure to serve under your chairmanship today, Mr Rosindell.

I congratulate the hon. Member for Barrow and Furness (John Woodcock) on securing this important debate. He is a doughty champion of the skills and activities that take place around the submarine programme in his constituency, and I am delighted to have this opportunity to respond to this debate and to put on record the Government’s appreciation of all the work that he has done in his constituency to support that programme.

The recent return of HMS Trenchant from a record-breaking 11-month patrol reminds us of the unwavering dedication of our submariners. For 267 days, she was east of Suez, where our submarines have had a presence since 2001 and where she took part in NATO’s counter-terrorism and counter-narcotics operations. Therefore I would like to start my contribution to this debate by thanking all of those who serve in our submarines and their families, who support their loved ones while they are away, often for months on end. Their commitment is sustained because they know the importance of the role they undertake in protecting our nation. Whether they serve on a fleet submarine contributing to current operations—as HMS Triumph did, by launching cruise missile strikes during the NATO-led operation in Libya—or they deliver our continuous at-sea deterrent by patrolling the oceans every minute of every day—in April, of course, the Prime Minister welcomed HMS Victorious back from the 100th patrol of the current deterrent fleet, which was a notable milestone—our submarines have served this country steadfastly for more than 100 years. But their role is only made possible thanks to thousands of people around the UK, who build, support and maintain the submarines. Although Barrow, as the centre of excellence for submarine production, has the most visible part to play in this programme, we do not rely on that Cumbrian town alone.

Alison Seabeck Portrait Alison Seabeck (Plymouth, Moor View) (Lab)
- Hansard - -

Although it might be out of order, I would like to put on record the work done by the deep maintenance people in Babcock in Plymouth.

Philip Dunne Portrait Mr Dunne
- Hansard - - - Excerpts

I am naturally grateful to the hon. Lady for reminding me. She pre-empts my own remarks. I am happy for her to endorse that, because it is not just Cumbria that contributes to this enormous effort.

From specialist diver support courtesy of Divex in Aberdeen, to marine valves courtesy of Hale Hamilton in Uxbridge, not so far away, few corners of the UK do not benefit either directly or indirectly from the £9.8 billion total cost of the Astute programme—not least the maintenance on the south coast that the hon. Lady mentioned.

The current submarine build programme alone sustains more than 10,000 jobs across the UK, as we have heard. There are some 5,000 high quality and skilled jobs at nine BAE Systems sites across the UK and thousands more are supported through 400 suppliers across the country. Thanks to our commitment to build seven Astute class submarines, as set out in the strategic defence and security review, these people are set to be busy for years to come.

These are the biggest and most advanced attack submarines ever ordered for the Royal Navy and the first two have bidden farewell to Barrow to join their cousins at their base port, Clyde naval base. But the pace does not slacken. I have seen for myself the hive of activity that is the Devonshire dock hall, as the third boat, Artful, is set to follow closely behind. Construction of boats four, five and six is also underway.

It is easy to focus only on BAES in Barrow, but we should not forget that the power plant at the heart of every nuclear submarine—in the past, now and in the future—has come from the Rolls-Royce facility at Raynesway in Derby. Rolls-Royce has been central to our nuclear-powered submarine fleet for more than 60 years, as the only company in the UK with design and production capability in nuclear submarine reactor systems. We recently announced an investment of more than £1 billion, to ensure we retain this unique national strategic capability for many years to come. This investment will regenerate the facility and sustain reactor core production at the site, securing some 300 of the most highly skilled manufacturing jobs in the process.

Likewise, the fleet could not continue to operate without the support provided at Devonport dockyard, as the hon. Lady highlighted. The refuelling, refits and overhauls that are essential to keeping our submarines at sea are all carried out here, as the centre of excellence for submarine maintenance.

It is not only England that plays its part in the submarine programme. Quite apart from the vital work done in support of our operational submarines by the 6,700 personnel supporting operations on the Clyde, firms across Scotland are winning contracts in the supply chain for build and maintenance of the fleet. For example, as hon. Members from Scotland present in the Chamber are no doubt aware, the sensor support optimisation contract I signed recently with Thales UK in May has secured 50 high tech jobs in Glasgow, along with a further 250 in Crawley, Manchester and Somerset.

Oral Answers to Questions

Alison Seabeck Excerpts
Monday 17th June 2013

(10 years, 12 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord Hammond of Runnymede Portrait Mr Hammond
- Hansard - - - Excerpts

I will probably not share with my hon. Friend all the thoughts that I would like to offer to the Treasury and some of my colleagues, but I will say this: while it is easy to draw attention to such things as the number of horses in the army, the moral component of our armed forces—that which links it to the great tradition of military service in this country—is a very important part of delivering military capability and is money well spent.

Alison Seabeck Portrait Alison Seabeck (Plymouth, Moor View) (Lab)
- Hansard - -

Included in those discussions will be the projected savings from the proposed changes to Defence Equipment and Support announced in last week’s White Paper. For the benefit of the House, will the Secretary of State set out what specific flexibilities he has won from the Treasury—one assumes he got its agreement before publishing the White Paper—so that the DE&S-plus model can compete openly and fairly with the Government-owned, contractor-operated option during the assessment phase?

Lord Hammond of Runnymede Portrait Mr Hammond
- Hansard - - - Excerpts

That is precisely the purpose of the assessment phase: to explore the boundaries of how far we can take a wholly public sector DE&S-plus model as a benchmark against which we can score the bids we receive for the alternative GoCo proposal.

Oral Answers to Questions

Alison Seabeck Excerpts
Monday 15th April 2013

(11 years, 2 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Philip Dunne Portrait Mr Dunne
- Hansard - - - Excerpts

Our armed forces benefit directly from responsible defence exports. Not only do they help build bilateral relationships and defence co-operation with our key allies, but they raise capability, enhance the interoperability of allies and partner nations, and contribute to regional security around the globe. As far as the contribution to the UK economy is concerned, defence exports have a vital role to play in sustaining UK jobs, generating UK tax revenues and helping to ensure the long-term viability and cutting edge of our defence industrial base.

Alison Seabeck Portrait Alison Seabeck (Plymouth, Moor View) (Lab)
- Hansard - -

I would like to associate the Opposition with the Minister’s condolences to the family and friends of Lance Corporal Webb for their loss.

The Minister will be aware that the Brazilian navy is looking to acquire at least one, possibly two, new aircraft carriers, so there will be significant potential for export opportunities. French companies are already on the case, supported by the French Government, looking to procure the design work. Given that we are building two of the world’s most advanced aircraft carriers, as a result of which we will have the skills and a dip in ship-building orders between the end of the carrier build and the start of the Type 26—which, incidentally, we are looking to sell to the Brazilians—what discussions has his Department, including the Under-Secretary of State for Defence, the hon. Member for South West Wiltshire (Dr Murrison), during his recent visit, had with the Brazilians specifically to promote British interests in the design and build of those carriers?

Philip Dunne Portrait Mr Dunne
- Hansard - - - Excerpts

As the hon. Lady knows, Brazil and the UK entered into a maritime co-operation agreement as a result of the Prime Minister’s visit in recent months. As I said earlier, the Under-Secretary of State, my hon. Friend the Member for South West Wiltshire, visited Brazil only last week, when he discussed maritime co-operation, particularly in the offshore patrol vessel area. It is clear that the Brazilians wish to construct the aircraft carriers in their own shipyards, which means that there is no prospect of a direct export order for an entire ship; but as regards many of the systems, components and weapons systems, we will be seeking to provide opportunities for companies in this country supplying our aircraft carriers, which are currently under construction in Rosyth, to bid into the Brazilian and other nations’ programmes.

Oral Answers to Questions

Alison Seabeck Excerpts
Monday 25th February 2013

(11 years, 3 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord Hammond of Runnymede Portrait Mr Hammond
- Hansard - - - Excerpts

I am grateful to my hon. Friend, who is an aficionado of NAO reports. Anybody who reads NAO reports regularly will recognise that, in context, the report was supportive and favourable. However, it does not make us complacent—we still have a great deal of work to do. I can tell him that the response from industry has been favourable. I chaired a meeting of the defence suppliers forum the week before last, which commented favourably on the report and the guidance it gives in directing its investment in future capability.

Alison Seabeck Portrait Alison Seabeck (Plymouth, Moor View) (Lab)
- Hansard - -

In a written answer on 11 February to my hon. Friend the Member for Coventry South (Mr Cunningham), the Under-Secretary of State for Defence, the hon. Member for Ludlow (Mr Dunne), who has responsibility for defence equipment, said:

“This Government will not blindly pursue projects, ignoring new information about defence equipment acquisitions.”—[Official Report, 11 February 2013; Vol. 558, c. 442W.]

That is obviously vital in core programmes, but the Defence Committee report on defence acquisition suggested that that was exactly what the Government have done. It concluded that decisions were

“rushed and based upon incomplete and inaccurate policy development…and…without the MoD understanding how the change could be implemented.”

Was the Committee wrong to question the Government’s competence?

Oral Answers to Questions

Alison Seabeck Excerpts
Monday 26th November 2012

(11 years, 6 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Philip Dunne Portrait Mr Dunne
- Hansard - - - Excerpts

The single most effective answer to the hon. Gentleman’s question is that this Government have removed the overspend in the defence equipment budget that we inherited from Labour. By narrowing the spend for the next 10 years into a £160 billion envelope, it is now clear that some 95% of that money is committed and the contractors know that the programmes will be delivered. That was not the case under the previous Government.

Alison Seabeck Portrait Alison Seabeck (Plymouth, Moor View) (Lab)
- Hansard - -

The success of the future structure of Defence Equipment and Support lies at the heart of our ability to deliver Future Force 2020. The concerns raised by the industry about exactly how a Government-owned, contractor operated model would work therefore need to be taken seriously. The Minister’s predecessor, the hon. Member for Mid Worcestershire (Peter Luff), also highlighted the delay to the announcement on the equipment programme. My hon. Friend the Member for Hartlepool (Mr Wright) was absolutely right about the Department for Business, Innovation and Skills perspective—it is vital that the defence sector has certainty. Will the Minister undertake to come to the House at the earliest possible opportunity in the new year to set out the detail of the GOCO model and give us a definitive list of the projects that will be overseen by it?

Oral Answers to Questions

Alison Seabeck Excerpts
Monday 22nd October 2012

(11 years, 7 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord Hammond of Runnymede Portrait Mr Hammond
- Hansard - - - Excerpts

The Green Paper on our plans for the reserves is expected to be published around the end of this month or early next month.

Alison Seabeck Portrait Alison Seabeck (Plymouth, Moor View) (Lab)
- Hansard - -

I, too, welcome the new Front-Bench team. Two and half years into this Government, there is a hiatus in the decision making on Defence Equipment and Support. Ministers’ views seem to ebb and flow, and indecision is rampant. We need clarity, so when exactly will the Minister set out plans for a Government-owned contractor-operated body—a GoCo—or whatever other body he intends to bring forward?

Philip Dunne Portrait The Parliamentary Under-Secretary of State for Defence (Mr Philip Dunne)
- Hansard - - - Excerpts

The hon. Lady talks about a hiatus. There were 13 years during which the previous Administration made no attempt to transform procurement within the Ministry of Defence, but this Government are determined to make procurement efficient and effective so that our armed forces can be given the right equipment at the right time and at the right cost. In July, my right hon. Friend the Secretary of State announced an investigation into the GoCo route, narrowing the options for Defence Equipment and Support. A value-for-money exercise is nearing completion, and we expect to make a decision before the end of the year on whether to move forward.

Defence Equipment and Support

Alison Seabeck Excerpts
Tuesday 17th July 2012

(11 years, 11 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Urgent Questions are proposed each morning by backbench MPs, and up to two may be selected each day by the Speaker. Chosen Urgent Questions are announced 30 minutes before Parliament sits each day.

Each Urgent Question requires a Government Minister to give a response on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Alison Seabeck Portrait Alison Seabeck (Plymouth, Moor View) (Lab)
- Hansard - -

(Urgent Question): To ask the Secretary of State to make a statement on the future of Defence Equipment and Support.

Nick Harvey Portrait The Minister for the Armed Forces (Nick Harvey)
- Hansard - - - Excerpts

A key element in the transformation process under way in the Ministry of Defence is that of its equipment and support activities through the matériel strategy. Reforming the acquisition system to drive better value from the defence budget is a core element of the process. This will require changes to Defence Equipment and Support to ensure that the organisation has the structures, management and skills it needs to provide the right equipment to our armed forces at the right time and at the right cost. Change is essential to tackle the legacy problems in defence acquisition that have historically led to cost and schedule overruns and have resisted previous attempts at reform.

The current system does not help or support DE&S properly, and it is not delivering value for money for the taxpayer. Bernard Gray’s analysis reveals the following root causes: first, an historically overheated equipment programme in which far more projects were planned than could be paid for; secondly, a weak interface between DE&S and the wider Ministry of Defence, with poor discipline and change control between those setting requirements for equipment and those delivering the programmes; and, thirdly, insufficient levels of business capability at DE&S for the scale and complexity of the portfolio it is asked to deliver. The result of these combined issues has been significant additional costs in the defence budget in the order of hundreds of millions of pounds each year.

Earlier this year, MOD officials were asked to focus their efforts on considering the comparative benefits that could be derived from changing DE&S into an Executive non-departmental public body with a strategic partner from the private sector or a Government-owned, contractor-operated entity. The work done to date suggests that the strategic case for the GOCO option is stronger than that for the ENDPB option. Further value-for-money work is under way to confirm this assessment. In the meantime, as resources and commercial appetite constrain our ability to pursue these two options simultaneously to the next stage, we have decided that the Department should focus its effort on further developing and testing the GOCO option.

The work to determine value for money between the options will take place over the next few months. In parallel, we will begin to develop a commercial strategy, engaging with industry to hone our requirement. This work will support decisions later this year on whether to proceed with the GOCO option and whether to launch a competition for a private sector management company to run the organisation. Provided that the further work demonstrates that the value-for-money case for GOCO over ENDPB is conclusive, this will be followed by an investment appraisal that will test the GOCO against a public sector comparator. Ultimately, this would be followed by a decision on whether to proceed.

Alison Seabeck Portrait Alison Seabeck
- Hansard - -

Let me be clear that there is massive consensus across this House that defence procurement must be tackled to ensure that some of the issues that plagued successive Governments are not repeated. We understand the budgetary challenges faced by the MOD and agree that procurement reform is essential to ensure financial sustainability.

It was therefore a huge surprise when yesterday the Secretary of State revealed in Defence questions that a decision had been made on the future of DE&S, but that no oral statement was planned and, indeed, that it was to be slipped out on the last day of Parliament. It was a bigger surprise, therefore, to read in the written statement that in their third year of government, no decision has yet been made by Ministers. The delay is as worrying as it is inexplicable. With the Gray review, the previous Government began the process of reform. It is now unclear when it will be completed. Will the Minister comment on the timing and confirm that primary legislation will be required for a GOCO?

The Government prefer the Government-owned, contractor-operated model, but it is unclear why. Will the Minister explain precisely why a GOCO is preferable to an NDPB? Are his Treasury colleagues content that the GOCO model offers value for money? Will he make a commitment to publish the full reasoning for the rejection of other models?

We fear that privatisation could weaken the public accountability and transparency of multi-billion-pound defence decision making. How would a GOCO be held publicly accountable? Who would be responsible for ensuring that contracts were delivered to time and to cost? We have seen recently with G4S that outsourcing does not guarantee efficiency or effectiveness, and can increase risk. Indeed, even with the London Organising Committee of the Olympic Games and Paralympic Games model, problems have arisen because Ministers have been distanced from the decision-making process and the lines of responsibility have been blurred. Such issues would be unacceptable when dealing with our armed forces.

Will the Minister say what will happen to existing contracts under the GOCO model? Crucially, those include the nuclear deterrent. Finally, what will the military’s role be in procurement under these plans? What guarantee can he give to the 20,000 people who are employed by DE&S that their jobs are not under threat?

The future of DE&S is not only about tens of thousands of highly skilled jobs in our defence industry, but, crucially, about the security of our nation. Getting it wrong would put lives at risk. It is vital that Parliament has a full opportunity to scrutinise these decisions.

Nick Harvey Portrait Nick Harvey
- Hansard - - - Excerpts

May I correct the hon. Lady’s first proposition? It is clear that no decision has been made. A study is being carried out, which involves value-for-money work. If, when that appraisal is completed, we take this option forward, that is the point at which the decision will be made. Only when the model had been worked up and thoroughly tested would we finally take the decision to go ahead. Of course, we would come back to the House at that point.

The hon. Lady suggested that we had slipped this announcement out. I would say that the contrary is true. If the House had not been about to go into several weeks of recess, we would not necessarily have made a statement yet. We have done so to give the House the greatest possible transparency about what is going on and to send the clearest possible signal to the potential commercial partners that we are serious about this matter and are taking it forward. I stress that the decision about timings will be taken towards the end of this year. The commercial partner would be sought in a competition during the course of next year and a decision on whether to go ahead would be taken early in 2014.

The hon. Lady asked whether this model would include the nuclear component of defence. I remind her that the Atomic Weapons Establishment at Aldermaston is a Government-owned, contractor-operated organisation, and that it works extremely well. The last Labour Government and previous Governments have made extensive use of the private sector in providing critical elements of our defence and other public services. I see no reason to believe that it would be any less capable of doing so in this area.

The GOCO option has looked better in the early explorations because if we stuck with an ENDPB, the work force and the management would remain in the public sector, and the greatest possible private sector involvement would be the use of a consultant. If we go for the GOCO option, the entity will have all the freedoms of a private sector operator: it will recruit people on private sector terms and conditions, and will have an incentive to make the thing work in a way that an ENDPB would not.

Oral Answers to Questions

Alison Seabeck Excerpts
Monday 16th July 2012

(11 years, 11 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Alison Seabeck Portrait Alison Seabeck (Plymouth, Moor View) (Lab)
- Hansard - -

The Minister talked about the bases for the joint strike fighter. The Government have already carried out two U-turns on the joint strike fighter programme and sold the Harrier fleet to the USA. Given that the USA is now in the throes of major budget problems and, if the story in The Sun today is to be believed, might well pull the plug on the whole programme, will the Minister reconfirm the confidence expressed by the Secretary of State a few weeks ago not only in the joint strike fighter programme but in the carrier programme? Will he also confirm that there will be no further budget increases as a result of what is happening in the USA?

Nick Harvey Portrait Nick Harvey
- Hansard - - - Excerpts

I am sure that the hon. Lady does not believe everything she reads in The Sun, or indeed in any other newspaper. There are stories almost every week about the alleged state of that programme in the US. On Wednesday this week, the Secretary of State will be visiting the US Marine Corps to see the short take-off and vertical landing—STOVL—version of the joint strike fighter flying. It has already done 1,000 hours of flying time with the US Marine Corps, and we have every confidence that it will come into service as planned.

Nuclear-powered Submarines

Alison Seabeck Excerpts
Monday 18th June 2012

(11 years, 12 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Urgent Questions are proposed each morning by backbench MPs, and up to two may be selected each day by the Speaker. Chosen Urgent Questions are announced 30 minutes before Parliament sits each day.

Each Urgent Question requires a Government Minister to give a response on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Lord Hammond of Runnymede Portrait Mr Hammond
- Hansard - - - Excerpts

Indeed. My hon. Friend is right. The written statement I made today was made in written form precisely because it does not convey any terribly new information. We have always made it clear that we would progress with the replacement for the Vanguard class submarines, subject to the main gate decision in 2016. He speculates on the conclusion of the review currently being conducted under the leadership of the Minister for the Armed Forces, and he may choose to do so. I can tell him that it is expected that the review will be completed by the end of this year and then presented to the Prime Minister and Deputy Prime Minister.

Alison Seabeck Portrait Alison Seabeck (Plymouth, Moor View) (Lab)
- Hansard - -

May I offer the condolences of the Opposition to the families and friends of the two brave servicemen who lost their lives last week? For the record, the shadow Secretary of State is out of the country on official defence-related business.

In a security landscape of few guarantees, our independent nuclear deterrent provides us with the ultimate insurance policy, strengthens our national security and increases our ability to achieve long-term global security aims. As the Secretary of State made clear, the initial gate decision announced in May last year set in train £3 billion of expenditure on the design, development, assessment and ordering of long-lead items to make the 2016 main gate decision feasible.

If the hon. Member for Moray (Angus Robertson) had re-read the May statement, he would have known that half the money is for renewing the infrastructure of the Rolls-Royce facility in Derby, which is essential for the next generation of nuclear submarines. That is not new but necessary investment.

This is a vital programme that a separate Scotland would not be able to afford or benefit from—[Hon. Members: “We don’t want it!”]—in terms of security or jobs if it did not go ahead. Indeed, the development of the new reactor needs to go ahead whether or not there is a final decision on Trident, because it relates to the UK’s defence capability and to our submarine programme —with huge implications for places such as Barrow, a point completely missed by the hon. Member for Moray.

It is very easy to become blinkered by the concerns held in some quarters about the successor programme and to lose sight of the wider need for the research and development and investment required to keep our nation safe. If the Lib-Dem alternative review, which is ongoing, is to be evidence-based, it must stand up to scrutiny when published, and the Opposition will certainly look at any new evidence brought forward.

Some issues rise above party politics, and the nation’s security is one of them. The country would therefore be deeply disappointed if defence of the Government ever took precedence over defence of the national interest. The previous Government were strong advocates of the nuclear non-proliferation treaty, and although multilateral disarmament is not the only route to achieving a world free of nuclear weapons, it is one that we must accelerate if we are to achieve that collective goal.

Will the Secretary of State say how the Government are strengthening each of the three pillars of the NPT? What dialogue is he having with some of the key Governments about their position in that regard?

When the Government do the right thing on defence, we will support them. We look forward to the evidence that they will provide and to a clear commitment to multilateral disarmament.

John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

Order. May I very gently say to the Secretary of State that any remarks about the non-proliferation treaty should be pretty brief? I know that he will want other colleagues to be accommodated.

Oral Answers to Questions

Alison Seabeck Excerpts
Monday 11th June 2012

(12 years ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord Hammond of Runnymede Portrait Mr Hammond
- Hansard - - - Excerpts

The hon. Lady can probably do the maths: she says £1.25 million worth of equipment has been stolen, and I have announced a £152 billion investment, so she can work it out for herself. As a member of the Defence Committee, which asked questions about this matter, she will know that of the equipment listed as stolen, a significant amount has been recovered, but not necessarily netted off against that figure, so in fact the total is probably less than the £1.25 million she suggests.

Alison Seabeck Portrait Alison Seabeck (Plymouth, Moor View) (Lab)
- Hansard - -

May I, on behalf of the Opposition, join in the condolences offered to the families of the three servicemen who, tragically, gave their lives serving their nation?

A decision has been taken to cut the co-operative engagement capability, which was designed, among other things, to enable and support a reduction in the number of type 45s from eight to six. Dropping the programme, which has already cost the taxpayer £45 million, therefore poses capability risks. Will the Secretary of State tell the House what were the strategic—not the budgetary—reasons for his changing his mind?

Lord Hammond of Runnymede Portrait Mr Hammond
- Hansard - - - Excerpts

I notice that the hon. Lady did not tell the House what was the strategic reason for Labour having delayed the programme for five years, before we grasped the nettle and decided to cancel it. We take decisions on the basis of advice from the Armed Forces Committee, which takes the budget available and decides what the priorities should be. In this case, the First Sea Lord and his colleagues on the Armed Forces Committee have decided that the programme is not a high priority for naval spending.