High Speed Rail (London – West Midlands) Bill Debate

Full Debate: Read Full Debate
Department: Department for Transport

High Speed Rail (London – West Midlands) Bill

Cheryl Gillan Excerpts
Tuesday 9th September 2014

(9 years, 8 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Cheryl Gillan Portrait Mrs Cheryl Gillan (Chesham and Amersham) (Con)
- Hansard - -

I welcome the Minister’s opening statement on these motions, but may I issue a word of warning? When I hear a politician say, “Buy one, get one free”, the other phrase that comes to mind is, “Always beware of politicians bearing gifts.” Innocuous though this matter seems, I am not sure that the Minister can get away without answering a few questions. I have no intention of dividing the House as this is a technical matter referring changes to the Select Committee, so for those who are in any doubt may I say that I do not intend to cause too much of a fuss but I do intend to comment?

We find ourselves back in this Chamber once again with the Government asking colleagues to vote on matters relating to HS2. I recall that the previous time the Government asked MPs to vote on this project, we did so in the absence of the Major Projects Authority report, which identifies the risks of the project. That is still unavailable to MPs and to the very Select Committee to which the new changes are being referred. I reiterate that it is not fair to ask the Select Committee to evaluate the changes, or any of the other proposals being made by HS2 Ltd, in the absence of the full MPA set of reports identifying the risks we are taking with this project.

I was surprised that more detail was not available on the changes before we arrived in this place. The Minister was good enough to send me details of the one change that affects my constituency. However, 20 out of the 55 changes affect Buckinghamshire, and issuing the list I had sent to me at 1.30 pm today does not give colleagues, particularly those who are not able to make representations in the same way as I am, an opportunity to study the detailed changes.

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

My right hon. Friend will recall that the Secretary of State wrote to her on 2 May with details of the change in her constituency, and other right hon. and hon. Members, both Government and Opposition, were contacted in the same way.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - -

I am glad to have the Minister’s reassurance; that is not exactly how I understood it from my colleagues, but I will take his word for it. Having looked at the list, I find that I have one minor change in my constituency, which accommodates a footpath change at the request of my local landowner Mr Lund. I hope it accommodates his request in full, and I repeat that I was grateful to the Minister for providing details to me. However, I am not sure that details of the changes in other parts of Buckinghamshire have been communicated to my colleagues, because when I spoke to people in their offices I was told that the details that were made available in the list that arrived in my office at 1.30 pm had not been made available to Members or their staff, so no comments on the changes could be fed into the debate. As the Minister knows, several of the changes require a permanent acquisition of land to provide services or access for HS2.

Graham Stringer Portrait Graham Stringer (Blackley and Broughton) (Lab)
- Hansard - - - Excerpts

I am grateful to the right hon. Lady for giving way, and she is always generous with her time. This is a poor show, because this debate was in the business statement announced to the House on Thursday afternoon. Will she name her Conservative colleagues who cannot be bothered to turn up to represent their constituents?

Cheryl Gillan Portrait Mrs Gillan
- Hansard - -

The hon. Gentleman mistakes what I mean. Several Members of this House who serve as Ministers or in other positions of responsibility are unable to express, directly on the Floor of the House, the views of their constituents. I am sometimes permitted to make points on their behalf and at their request, which is usually the way we accommodate such matters, as he knows.

Michael Fabricant Portrait Michael Fabricant (Lichfield) (Con)
- Hansard - - - Excerpts

At the moment, my hon. Friend the Member for Tamworth (Christopher Pincher), for example, is in Committee discussing the Modern Slavery Bill, where there might be votes. I know that he would otherwise very much wish to be here for the debate.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - -

My hon. Friend makes a very valid point. The hon. Member for Blackley and Broughton (Graham Stringer) knows that he was a little naughty with his intervention. He was trying to make people look bad, and this is not a time to do that. I can honestly say that all my colleagues, on both sides of the House, are fighting the corner for our constituents and trying to put their point across. The sort of point the hon. Gentleman makes is not particularly welcome.

Christopher Chope Portrait Mr Christopher Chope (Christchurch) (Con)
- Hansard - - - Excerpts

Will my right hon. Friend emphasise that not just constituents who live on the proposed line of route but almost all constituents, including mine, are concerned about the enormous bill to the British taxpayer, to which they will have to contribute if this Bill goes through?

Cheryl Gillan Portrait Mrs Gillan
- Hansard - -

My hon. Friend makes a good point. The costs of the project are a matter of concern right across the board and to all Members. Hon. Members ought to bear in mind that today the Minister has brought savings to the Dispatch Box[Interruption.] He indicates to me that they are minute savings, but we know that size is not everything—savings are important. I hope that will go some way to showing that Ministers’ eyes are open at least to looking at cost savings ideas. I hope that they will be open to looking at other savings, not just monetary ones.

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

May I point out that there is not only a small saving but considerable improvement for my right hon. Friend’s constituent Mr Lund? Although I would not go so far as to say he is pleased to see the change, it is certainly an improvement on what was there before. May I remind the House that although we wrote in May to Members with details of the changes in their constituencies, we sent them an additional copy of the letter this morning, in case they had missed the earlier one? We have also tabled documents before the House so that any other right hon. or hon. Member who wishes to look at the detailed changes, on moving electricity pylons, rights of way and so on, can see what is before the House today. Nobody can be in any doubt about what we are discussing today.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - -

I am grateful to the Minister for that. It was good of him to send the letter that he said was sent to me on 2 May. In his original letter to me he said it was sent on 1 May and we were looking in the wrong place, although I still have no record in my office of having received the letter on 2 May. That is just a small point of no real importance; this was just poor staff work.

I would like to know when the map books are going to be available—I believe 17 are affected—showing the changes, with the list of affected owners. I understand that they are not yet available, so will the Minister confirm when they will be published? When exactly will the notices and the newspaper advertisements be placed? I am willing to give way to allow him to answer that.

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

They will be available on Wednesday—tomorrow.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - -

If they are available on Wednesday, that raises the question of why they could not have been available in time for this debate. The Minister is obviously not going to allow us to have the detail until after this debate, and we have to put up with that.

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

The purpose of today’s motion is to facilitate the depositing of the maps. That is why we are doing so on the first possible opportunity, should we get the consent of the House today, which is tomorrow.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - -

I am grateful for the Minister’s clarification, but it would have been helpful if the map books had been available to Members before the debate.

My right hon. Friend the Member for Aylesbury (Mr Lidington) was also concerned that he had not yet been given details of the proposals. Let me make a small point. It is hard for Members of Parliament to allay people’s fears or make the relevant representations if we do not have the details at the earliest opportunity. I am sure that some of the proposed changes will be welcomed—I certainly hope so. Sadly, the only change that my constituents want is the adoption of a longer tunnel under the area of outstanding natural beauty. That would save the violation of our so-called protected environment and the Committee Members to whom these changes are being committed some 550 petition hearings, which have been lined up because of the lack of support for the long tunnel so far.

Like the right hon. Member for Holborn and St Pancras (Frank Dobson), I am willing to offer the Minister a freebie lunch in Chesham and Amersham if he visits to look at the environment, the countryside and the grief that would be saved if the longer tunnel, which I understand is being considered by the Department, is accepted. I know that it is currently being studied by the engineering teams at HS2, and I hope that the Minister will confirm that any future changes from HS2 Ltd, which he mentioned in his letter of 28 August, will include the tunnel extension.

Christopher Chope Portrait Mr Chope
- Hansard - - - Excerpts

My right hon. Friend makes an important point. Will she confirm that it is a matter of regret that there is no agreement on the costs between HS2 and the promoters of the extended tunnel? Surely it should be possible for rational engineers, albeit from different sides of the argument, to reach a conclusion over the additional costs of a tunnel.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - -

I think that engineers are talking to engineers. With the help of the Department, I have certainly facilitated meetings at which the tunnel has been discussed. The problem is that we do not have access to the costings prepared by HS2 Ltd, so we cannot make any comparisons. The truth of the matter is that we can make savings in time and money by reducing the need for those 550 petitions and we can save an area of outstanding natural beauty. If we can protect other areas of the country by kicking up a fuss, we should protect the one that is nearest to our capital city and the one that is so fragile that it would be irreparably damaged if this scheme were to go ahead as currently envisaged.

The office of the right hon. Member for Buckingham (John Bercow) is also concerned that uncertainty still exists for its constituents. During the last petitioning period, it came to light that some people who were affected by the proposal had heard nothing from HS2 Ltd. They heard about their properties being affected only by word of mouth from neighbours. All of us in this House wish to hear that such behaviour will not be repeated in this or any future case.

Following this debate, there will be a consultation on the environmental statement for the additional provisions running from 19 September to 14 November. However, the petitioning period for those who are affected runs only until 17 October. If 56 days have been allocated to look at the environmental impacts, people whose land is affected should not be disadvantaged and expected to respond with a petition in a shorter time frame. Will the Minister consider extending that petitioning period to the same closing date as the consultation on the environmental provisions?

Let me put this matter in context. This project has been going for nearly five years, and because of errors and omissions by HS2 and the Department there have been so many consultations and so many changes to periods of consultations that the closing dates and timetables continue to confuse people. It would be a good idea if we had just one date for the additional provisions. I hope that the Minister will give that thought some consideration.

What assessment has the Minister made of today’s motions and their compliance with key aspects of European environmental legislation, specifically the habitats directive and the environmental impact assessment directive, and the UK’s obligations under the Aarhus convention? As I understand it, the EIA directive requires the entire environmental effects of a project to be measured and consulted on rather than it being done in individual stages through salami slicing. Perhaps the Minister will address that in his response.

I said that I have no intention of dividing the House on this issue as it deals merely with changes to the process for scrutinising the project, but I must again make the point that this project as proposed is deeply unpopular not just with my constituents but with many others who, like me, do not think that the business case, the route and the lack of connectivity to other transport hubs justify the vast expenditure.

Michael Fabricant Portrait Michael Fabricant
- Hansard - - - Excerpts

May I say how much I agree with the point that my right hon. Friend has made? Is she aware that if HS2 were to follow the route that we supported as the party in opposition, there would be less environmental damage and we would save £4 billion to £8 billion in costs?

Cheryl Gillan Portrait Mrs Gillan
- Hansard - -

My hon. Friend has long supported the other route. Before the election, it was the other route that was on the drawing board. Something happened when the coalition came into power that changed the original understanding that we all had. The Government still have time to look at this in a different way, and I urge them to start this project in the north and connect our great northern cities and then revisit these plans to make better connections to Heathrow and the channel tunnel and of course to provide the extra tunnelling, should it still apply, that would protect the environment in the Chilterns to the highest standards.

I am afraid that, after five years, feelings still run really high in my constituency. This week, the Buckinghamshire Examiner says that HS2 will cost the Chilterns £170 million. Chiltern district council has done a study of what the costs of this project will be to my local economy in my constituency. I hope the Minister will understand the damage that will be done to the Chilterns and that he will consider my words yet again.

--- Later in debate ---
Frank Dobson Portrait Frank Dobson
- Hansard - - - Excerpts

Although I understand the concerns of people who are directly affected by the propositions that are not quite before us this afternoon, my principal concern is the application of the Standing Orders to what is proposed and likely to be proposed at Euston, which will be the biggest building and engineering project in Britain for many a long year. Its impact will be phenomenal and I believe that it is wholly inappropriate for the Government to try to use such a procedure to push through changes on that scale and with such an impact.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - -

I am increasingly worried about the process. My right hon. Friend the Member for Meriden (Mrs Spelman) just said that in her letter she had been informed that four sites were subject to these additional provisions and changes, but the document issued to me at 1.30 today shows only two changes for Meriden. That reinforces the fact that there is a lack of clarity about the detail and there seems to be some confusion about what changes are being referred to the Committee. With a project of this size, we cannot afford such discrepancy.

Frank Dobson Portrait Frank Dobson
- Hansard - - - Excerpts

Again, I sympathise with the right hon. Lady, because nowhere has been subjected to the absolutely stupendous incompetence of HS2 more than my constituency. HS2 proposed a link with HS1. Everyone said that that was crackers, HS2 said it was wonderful and then it had to drop it. HS2 proposed the lean-to engine shed proposal. Lots of people said that that was crackers, HS2 said it was the only thing it would be possible to do and that it would be extraordinarily expensive to have a full development of the whole station—and lo and behold, that is what is now being proposed. No apology has been issued to anyone, as far as I know, for this stupendous incompetence and ridiculousness. I understand that when an environmental statement is eventually issued, the consultation period will run concurrently with the petitioning period. That seems to me to be extremely unfair.

Let me explain the difference in scale between what is being formulated now and what is in the Bill. The works at Euston in the Bill were going to cost £2 billion, but HS2 let slip at meetings that it is now thinking in terms of £7 billion. Even a fellow Yorkshireman like the Minister would admit that that is a few bob more. It is people with that grasp of reality who are behind this scheme. In addition, and in a further source of perturbation for my constituents, HS2 now says that the new Euston, when finally completed and in operation, would not be able to cope with the increased number of passengers without the building of Crossrail 2 to help take passengers to and from Euston, at an additional cost of £20 billion. Will that be included in the new environmental statement and will it be subject to petitioning?

--- Later in debate ---
Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

With the leave of the House, I shall touch on several points raised during the debate.

I can tell my right hon. Friend the Member for Chesham and Amersham (Mrs Gillan) that the people along the line of route who are affected by the changes are aware of them. The changes are minor. The process has been described as a tidying-up exercise, although I recall the previous Government describing the treaty of Lisbon as a tidying-up exercise, so I should not go too far down that road. Of the 55 changes overall, there are 21 changes to access tracks, most of which, including the change in her constituency, are a result of discussions with farmers about developing preferable approaches. Some 20 areas of land will be required, mostly temporarily, so that National Grid can undertake works to rewire pylons. Three areas of land will be required temporarily for works to pipelines, while a further three areas are needed due to minor amendments for the laying of roads. There will be eight other changes, including with regard to car parking provision at the national motorcycle museum in the parish of Hampton-in-Arden.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - -

Why did that change not appear to be included in the list about the additional provision that was given to me at 1.30pm?

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

It might be that just the parishes were listed, not the actual works, but I understand that the documentation laid before House did include that—[Interruption.] Indeed, I have been passed a bit of paper that might well reassure hon. Members. I am told that the changes relating to the motorcycle museum site are no longer being brought forward as a result of negotiations, so I must apologise to the House if the information was incorrect.

Such issues will be the subject of petitions that may be laid before the Select Committee. I believe that the petitioning period is adequate, especially given the limited scope of the changes. I underline that, at all times, we will seek to comply with all our obligations under EU and domestic legislation.

Many of the changes will be welcomed by landowners and people in the relevant areas. They have arisen partly as a result of our continuing negotiations with those affected by the building of HS2, and it is important that we ensure that people’s views are taken into account.

We need to look at the overall picture, and the right hon. Member for Holborn and St Pancras (Frank Dobson) referred to changes that may take place in his constituency. We are aware not only of the permanent changes that will arise due to the line’s construction, especially to the station itself, but of how businesses in the area might be affected due to the construction. I spent an enjoyable lunchtime eating a meal with the right hon. Gentleman in one of the area’s Bangladeshi restaurants, and I understood precisely the worries of the owners about the erection of building hoardings in the area, which might make it difficult for the restaurant’s usual clientele to access the site.