Defence: Type 45 Destroyers Debate

Full Debate: Read Full Debate
Department: Ministry of Defence

Defence: Type 45 Destroyers

Lord Boyce Excerpts
Tuesday 21st January 2020

(4 years, 3 months ago)

Lords Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Baroness Goldie Portrait Baroness Goldie
- Hansard - - - Excerpts

I thank the noble Lord, who has made a number of points. I rebut the gloomy and pessimistic picture he paints. In fact, the Type 45 destroyers are hugely capable ships, as he knows. They have been deployed successfully on a whole range of operations worldwide. They continue to make an enormous contribution to the defence of the UK and to our international partners, and the Royal Navy continues to meet its operational commitments. As the noble Lord is well aware, the origins of the problems with the Type 45s actually go way back to the early 2000s, when apparently there was a dilemma about which type of engine to choose and a new type was chosen rather than a type with a proven track record. All that is history. The point is that the Government have systematically analysed the problem from 2011 onwards under the Napier project and have provided money for the improvement work. That work will now go ahead, and these destroyers will be returned to full operating capacity.

On the noble Lord’s broader point, I point out that the Royal Navy has attracted significant investment. Not only will our fleet grow for the first time since World War II; its high-end technological capabilities will allow it to make a better contribution and to retain a first-class Navy up to 2040 and beyond. That is something we should be very proud of.

Lord Boyce Portrait Lord Boyce (CB)
- Hansard - -

My Lords, as the noble Lord, Lord West, implied and as we have heard in this House on numerous occasions, the number of our destroyers and frigates is anorexic. This is exacerbated by the Type 45 problem. We embarked on an eight-ship, Type 26 frigate-building programme in 2017, but the first ship, “Glasgow”, will not be commissioned until 2027. Thereafter, a ship will appear every two years. Does the Minister agree that a 10-year build programme for a frigate—it took only nine years to build our carrier—and of some 24 years for all eight ships is completely unacceptable? This is a black mark against the Government and our shipbuilding industry.