Contracts for Difference (Miscellaneous Amendments) Regulations 2022 Debate

Full Debate: Read Full Debate
Department: Department for Business, Energy and Industrial Strategy

Contracts for Difference (Miscellaneous Amendments) Regulations 2022

Lord McNicol of West Kilbride Excerpts
Tuesday 17th May 2022

(1 year, 11 months ago)

Grand Committee
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McNicol of West Kilbride Portrait Lord McNicol of West Kilbride (Lab)
- Hansard - -

My Lords, although it is a little tangential, I declare my interest as set out in the register as a commissioner on the UK Hydrogen Policy Commission, which is within the same field though not directly relevant to this SI.

First, as other noble Lords have done, I thank the Minister for his explanation of the regulations before the Committee. As we have heard, they make a few minor but important amendments to two previous sets of regulations—the eligible generator regulations and the allocation regulations. Before I dive into those, I reiterate our support for the continuation of contracts for difference as a method of securing energy capacity while ensuring that developers, government and customers can be confident in the security of long-term, high-cost and high-investment projects.

Regulation 2 in the draft regulations ensures that non-pipeline transport methods are included within the definition of complete CCS systems. My reading of the 2014 eligible generator regulations, and that of many who responded to the consultation, certainly did not appear to exclude this system. I am not convinced how necessary it is. I agree that non-pipeline transport of carbon dioxide is essential to decarbonised projects outside the clusters. As the noble Lord, Lord Teverson, said, we would hope that transport around and inside the clusters would be by pipeline.

The noble Lord, Lord Teverson, presumed that this would be on trucks. My presumption was that it would be on rails. Again, it would be interesting if the Minister had any information from the department about how non-pipeline transport would take place, as there is an environmental difference between rail and road transport.

Regulation 2 also widens the criteria for carrying out generating activity to include alterations of existing generation stations to connect them to a CCS system. As other noble Lords have said, this makes perfect sense. I agree that it is an important step to help retrofit a station to give access to the benefits of contracts for difference.

That change is appropriately repeated, in Regulation 3, for the allocation regulations, but the main thrust of Regulation 3 is to allow contemplation of contracts that do not specify a strike price and reference price, in line with the new payment method under the DPA business model. Instead, the DPA business model will implement an availability payment for low-carbon generation capacity and a variable payment, which links the new power CCS plants—again, there is a long time lead-in here, since we are hoping they will be in operation by 2030, so perhaps the Minister can confirm the dates for the completion of the CCS plants—with an unabated reference plant. This is said to incentivise availability and enable more flexible operation. Of course, it is right to ensure that the regulations are updated correctly, to allow for these new developments to take place, but perhaps the Minister could elaborate somewhat on how these changes will incentivise availability and when we can expect to reap the benefits from the new power CCS plants.

The noble Baroness, Lady McIntosh, has already picked up on—and I am sure that the Minister has read with excitement—the Secondary Legislation Scrutiny Committee’s 37th report. In paragraphs 21 to 23, as has been stated, the committee was critical. To be fair, all our interventions have been quite detailed. In the produced documentation, I have been able to understand clearly that it is of importance. We have already had from the department an Explanatory Memorandum on that. I hope that, before all future debates, these points raised on page 9 of the committee’s report will be taken into consideration.

Lord Callanan Portrait Lord Callanan (Con)
- Hansard - - - Excerpts

First, I thank my noble friend Lady McIntosh, and the noble Lords, Lord Teverson and Lord McNicol, for their constructive points and comments. Let me start by emphasising that the changes contained in these regulations are essential to enable the award of power carbon capture and storage contracts. The Government are committed to reaching net zero and, of course, to decarbonising our electricity system. All noble Lords will be aware that the Climate Change Committee has described CCS as a necessity and not an option to help us on the road and transition to net zero. Therefore, CCUS will be essential to meeting the UK’s 2050 net-zero target—I think that all three speakers agreed with that point.

Decarbonising the power sector has so far led the UK’s efforts to reduce greenhouse gas emissions. Thirty years ago, fossil fuels provided nearly 80% of the UK’s electricity supply. In 1990, electricity generation accounted for about 25% of total UK emissions, but by 2018 that was down to only 15% of total UK emissions. Today, I am pleased to say that the country gets over half of its power from low-carbon technologies, and the majority of those are renewable.

We can be confident that renewables will continue to play a key and increasing role in our generation mix on the overall journey to net zero, to decarbonise while maintaining security of supply, and keeping costs low. But for when the wind is not blowing and when the sun is not shining—something that applies particularly to the homeland of the noble Lord, Lord McNicol—we will need to balance renewable variable against demand. To do that, of course, we need system flexibility and energy storage, and we need non-weather dependent low-carbon power generation. That is why we consider that thermal power with carbon capture and storage is one technology that can provide that at scale. Therefore, carbon capture storage technologies will be important for the trajectory to achieving our 2050 net-zero target, and they will play a vital role in levelling up the economy, supporting the low-carbon economic transformation in our industrial regions and helping to create new high-value jobs.

On the specific points that were raised, starting with my noble friend Lady McIntosh, I am pleased to say that these regulations will indeed facilitate the rollout of the Government’s CCUS programme but of course will not bring projects forward in themselves. However, I am pleased to say that we have also seen significant interest in the programme, particularly from the east-coast cluster that my noble friend mentioned. We will seek to bring forward at least one power CCUS plant in the mid-2020s. This will be achieved through the CCUS cluster sequencing process and is subject to the outcome of that process, including, as always, value for money and affordability considerations. I am sure that my noble friend would agree with that.

Around half of our demand for gas is met through domestic supplies, but in meeting net zero by 2050 we may still use a quarter of the gas that we use now. So, to help to reduce our reliance on fossil fuels, we have to fully utilise the great North Sea reserve: we have to use the empty caverns that we have created for CO2 storage, and we must bring through hydrogen to use as an alternative to natural gas and help to use our offshore expertise to support our offshore wind sector. As a result of those plans, the North Sea will still be a foundation of our energy security, but of course we will have reduced our gas consumption by over 40% by 2030.

As clarified by the noble Lord, Lord Teverson, who was doing my job for me, the Explanatory Memorandum was revised on 5 May with in-depth footnotes to explain the acronyms and technical terms. I apologise if it was not clear; obviously, it is a complicated subject.

On the points made by the noble Lord, Lord Teverson, we consider that the capacity for T&S networks to be able to accept CO2 from dispersed sites and from international sources, transported by ship, road or rail—which would be non-pipeline transportation—may be important for our long-term objectives of achieving our carbon budgets and net zero, so we do not want to exclude power CCS projects that can transport and store CO2 by non-pipeline transport. We will need significant volumes of new-build, low-carbon capacity to meet growing electricity demand and to take the place of retiring capacity. To complement expanding intermittent renewables, it is important that some of this capacity is flexible and can operate for extended periods when renewable output is lower.

Our existing gas generation capacity is ageing. Most of it was built in the 1990s, during the so-called dash for gas. Advances in gas turbine technology mean that a purpose-built, modern, new-build gas-fired power station with CCUS would be more efficient than an older design retrofitted with CCUS technology. However, utilising existing assets can of course improve value for money in some cases, and to decarbonise our electricity system in line with the targets of the fifth and sixth carbon budgets, we consider that we will have to use existing generation as well as new-build capacity, both of which of course would need to be abated.

On the capacity market, CCUS requires more support for capacity given the co-ordination problem with infrastructure yet to be built, and the DPA incentivises investment to bring forward low-carbon generation capacity. The availability payment also acts as a way to incentivise those power CCUS projects and helps to maintain high capture rates throughout the DPA. I will come back to the noble Lord in writing on his question regarding the “payback” from CfDs for departments, but I think the answer will revolve around the fact that the money goes into Ofgem and is therefore used to offset other CfD payments. I certainly do not think that any of it appears either in the BEIS or Treasury budgets, but I will come back to the noble Lord and confirm the details of that.

On the points raised by the noble Lord, Lord McNicol, we wanted to ensure that non-pipeline transport was explicitly and unambiguously included in these regulations, and there is certainly no presumption in favour of road transport. Indeed, rail or shipping may also be covered and are probably more likely forms of transport. To take one pertinent example, at the moment Norway is currently shipping CO2. I hope that clarifies the point for the noble Lord.

To close, I underline once more that these regulations are a vital part of the UK’s efforts to reach net zero and to decarbonise our electricity system. With that, I commend these draft regulations to the Committee.