Lord Rosser Portrait Lord Rosser (Lab)
- Hansard - -

My Lords, after what has been said, I suppose I ought to add my thanks to the members of the Select Committee. In saying that, I did express my thanks to them in Committee. I also expressed my relief that I was disqualified from sitting on the committee at all.

The amendments in this group call for,

“a review of the merits of establishing Old Oak Common station as an interim eastern terminus for Phase One of High Speed 2”,

with construction work not beginning until the report of the review has been published. This debate has not done much to put Old Oak Common on the tourism map, despite the later comments of the noble Lord, Lord Adonis, about its future.

We had some discussion about Old Oak Common in Committee. An amendment was moved calling for a spur from it to the West London line north of Shepherd’s Bush to improve access to HS2 for people to the south of London. I seem to recall that I asked the Government if they were looking at improving connections between HS2 and other suburban lines in the vicinity of Old Oak Common to improve access to HS2. In his response, the Minister said that the West London Line Group, which had put forward proposals for the link from Old Oak Common to the West London line, had met DfT officials to discuss their proposals and that those discussions would continue. Perhaps the Minister could give us an update on the progress being made in these ongoing discussions.

I understand that the issue of Old Oak Common was considered during the Lords Select Committee hearings—noble Lords on the Select Committee confirmed that in their contributions today. The committee has not made any recommendations on this matter nor suggested that the Government should consider going down the road called for in the first amendment. In the light of this, we do not intend to either.

The second amendment in this group calls for an estimate of the costs for carrying out all the phase 1 works, with the breakdown set out in the amendment to be published, and the construction work not starting until that has been undertaken. What has prompted both the first and second amendments in this group is a view that the work cannot be carried out within the overall figure given by the Government. In Committee, the noble Lord, Lord Bradshaw, said that there was a good case for having an independent assessment of the costs and particularly for considering such things as how long HS2 could terminate at Old Oak Common. This could, perhaps, be a considerable period of time which could save a considerable sum of money. Costs are vital. The noble Lord, Lord Adonis, said in Committee:

“I cannot emphasise enough that the single biggest threat to this project is cost overruns in building the core of it, between cities where there is massive traffic—namely, Birmingham, Manchester, Leeds and London”.—[Official Report, 10/1/17; col. GC 62.]


The Government have committed themselves to a figure for the construction of HS2 stage one. Different bodies, including the National Audit Office, have looked at the figures and some have produced reports. The costings will, I understand, continue to be the subject of consideration by these bodies as the work progresses and more detailed figures are available. If the overall figure for the cost of construction is breached, it is the Government who will be held accountable—not least by us—since it is the Government who have said that the figures are accurate and can be trusted. They will have to explain why they got their figures wrong if the overall cost is breached, and why it would not have been possible to have got those figures right before construction started.

We do not want to go down the road of further amendments that could delay the starting of this project, which has already been the subject of so much consideration by so many people and bodies, including a Select Committee of this House. If the Government want to go down the road of the second amendment in this group without delaying the start of the project, that is a matter for them. However, one suspects that the production of further figures that have not been produced already, which presumably is what is being sought, would not bring the issue of costs to a conclusion, since there would inevitably then be challenges to the further breakdown of costs provided and the basis on which they were calculated. Our position, as I have said, is that we do not wish to see further delay to the start of this project, and behind the first amendment is clearly a major potential change.

On costs, at this late stage after so much consideration and examination of the project, it is now the Government and the Government alone who will be held accountable for any figures that prove significantly wrong and for any consequential cost overruns, since they have a responsibility to satisfy themselves that the cost estimates they have given are credible and accurate.

Lord Ahmad of Wimbledon Portrait The Parliamentary Under-Secretary of State, Department for Transport (Lord Ahmad of Wimbledon) (Con)
- Hansard - - - Excerpts

My Lords, I thank all noble Lords who have participated in the debate on these amendments. I join other noble Lords, including the noble Lords, Lord Faulkner, Lord Adonis and Lord Rosser, in adding my thanks—I did so in Committee and I do so again—to the Select Committee and all its members, some of whom are present, for their diligence, perseverance and indeed thorough examination of the raft of different petitions that were presented to them. Indeed, we have reflected on them already in Committee.

I start with an appreciation. The noble Lord, Lord Berkeley—and, in moving the amendment, the noble Lord, Lord Bradshaw—made it clear in their overall intent that they are both supportive of the Bill and indeed of the construction of HS2. Indeed, the majority in your Lordships’ House recognise the importance of this railway in terms of our future railway infrastructure.

I turn to the amendments. Whether there is an advantage in using the proposed new station at Old Oak Common as a temporary London terminus for phase 1 of HS2 was, as we have heard, examined in detail by Select Committees not just in your Lordships’ House but in the other place. As was set out, the proponents of this option believe that using Old Oak Common as a temporary terminus would provide several advantages, including less impactful construction works at Euston, less disruption to services on the west coast main line and the opportunity to allow a more comprehensive redevelopment of Euston to be undertaken. I do not dispute the intentions behind the amendment but it is for that reason, as noble Lords will appreciate, that the Government have already investigated these proposals in detail. I am minded to agree with my noble friend Lord Brabazon, who speaks with great expertise in this area, that the implication of accepting such an amendment would impede the progress of the Bill.

I will go briefly into the detail of this. We looked at many options put forward by petitioners to the Committee in the other place about options for terminating HS2 services at Old Oak Common temporarily or permanently, as well as splitting the termination of services between Old Oak Common and Euston station. I do not wish to go into the detail on the permanent use of Old Oak Common as a terminus or a splitting of services, as those issues are not the subject of the noble Lord’s amendment and would go against the principle of the Bill as has been agreed by both Houses. However, I note that the overall outcome of the work that was undertaken on those options demonstrated that a complementary solution of two stations at the start of services in London would be the best for HS2 passengers. Putting all our new passengers in one station would overload that station, and it is also important for the strategic objectives of HS2 to bring the benefits of the new railway to as wide an area as we can.

Permanently terminating a portion of HS2 trains at Old Oak Common, in order to be able to descope the proposed Euston station and reduce its footprint as a result of having to cater for fewer passengers, was also considered. The conclusion was that this would, as we have heard from my noble friend Lady O’Cathain, still result in most of the passengers who terminated at Old Oak Common having to change trains in order to reach Euston and incurring several minutes of additional journey time and inconvenience in doing so.

The detailed work that the Government undertook to investigate using Old Oak Common as a temporary terminus, primarily in response to the petitioners from the Camden area, looked at a number of scenarios and demonstrated that using Old Oak Common as a temporary terminus would not eliminate the construction effects and impacts in Euston. This was because there would still be a requirement to construct the tunnels into Euston in order to facilitate the fit-out of the railway further south—that is, the long rails, the overhead line and the other control systems that go with it—which as I understand it will go through sequentially from Old Oak Common, indeed from the depots north of Old Oak Common. It would not be practical to do that fit-out once we had started running trains in any economic fashion.

We also considered using a temporary terminus at Old Oak Common to allow staging of works if one part of the railway construction was slightly delayed by a few months or to facilitate a kind of test-run phase. We concluded that while it would be possible to turn round a few trains at Old Oak Common since the station will have the resilience to do so, this is not the same as turning round trains to a timetable or turning them round without delay. Old Oak Common has been designed as a through station. It will have the ability in emergency situations, such as security or safety events, to be used to get people off trains and turn trains round. However, that is an emergency situation, not a timetabled commercial service situation. I also note that while Crossrail would be able to provide onward journey opportunities for passengers alighting at Old Oak Common, if HS2 passengers consumed the capacity to get into the city centre it would be to the detriment of the capacity and growth opportunities which would otherwise be possible on that new Crossrail service.

The new station at Old Oak Common will facilitate an interchange between HS2 services and the national rail and Crossrail networks on the west coast main line. We consider that between a quarter and a third of all HS2 passengers will choose to use Old Oak Common rather than come to Euston, mainly for those destinations best served by the new Crossrail line. The remaining two-thirds of passengers who are still on the train beyond Old Oak Common will, as we heard from the noble Lord, Lord Adonis, have good access across both central London, London suburbs and to other mainline stations.

I hope that by listing the consideration that was given, I have demonstrated that the temporary termination of HS2 services at Old Oak Common has already been fully explored. That work showed no further merit in investigating this option further and indeed as neither of the Select Committees of either House that also examined this issue saw fit to make any recommendations regarding it, I suggest that the details of this amendment have been looked at. I therefore hope that the noble Lord will withdraw it.

With respect to the amendment of the noble Lord, Lord Berkeley, on cost estimates, as the noble Lord himself acknowledges, last week I met him to discuss the work that he had commissioned on the costs of phase 1. Indeed, Mr Bing, to whom he referred, was also present with officials from my department and from HS2. I disagree with the noble Lord, Lord Bradshaw, when he says that the figures presented are flimsy. They are not. I am confident of the robustness of our costs. Indeed, Mr Bing himself acknowledged the expertise of those present from HS2 in terms of providing and determining these costs. What was clear from the costs that Mr Bing had presented vis-à-vis the costs that the HS2 technical experts were presenting was that there was a difference in the basis on which they were detailed. That said, we are confident of our own cost analysis. In response, and in the spirit of openness that I hope I have demonstrated during the passage of this Bill, I have suggested to the noble Lord, Lord Berkeley, further work on how the differences in cost estimates occurred so that these issues may be addressed. I believe that he has taken up this offer with Mr Bing.

The Government in no sense underestimate this issue of costs. Infrastructure projects are a serious matter and—as the noble Lord, Lord Berkeley, has acknowledged on the Crossrail project—their costs are a major determinant of their success. Therefore, as many will be aware, an updated cost estimate for the project is being published at each iteration of the business case, the next such iteration being due in the summer of this year.

The project as a whole, including its cost estimate and business case, is, as we have heard from several noble Lords, subject to regular independent reviews from the Infrastructure and Projects Authority and the Public Accounts Committee. Having illustrated the checks and balances and our continued belief in the robustness of the costs that have been presented—a point validated in the assessments made by various other bodies, including the Public Accounts Committee—I do not feel that a further independent review is necessary and hope that on the basis that I have detailed, the noble Lord will be minded to withdraw his amendment.

--- Later in debate ---
Lord Rosser Portrait Lord Rosser
- Hansard - -

I will make a few brief comments. First, I thank the Minister for the consultation that has taken place since Committee with local highway authorities, and for the retabling of the new schedule. Certainly, as a result of what has happened since Committee, a lot of the sting seems to have been taken out of the issue.

However, as the noble Baroness, Lady Randerson, said, there are still some outstanding issues. The noble Baroness mentioned Camden Council. It has indicated to us—and to the noble Baroness—that it is still pursuing certain points with the promoter. It has indicated—no doubt to all of us—that it wants the Secretary of State to provide a justification when using the powers around traffic management in the new schedule.

The noble Baroness, Lady Randerson, referred to the issues of bus lanes, cycleways, the Safer Lorry scheme and the congestion charge zone, and the Minister has already touched on that. However, Camden Council, as I understand it, is asking the Government to agree to specific provisions to ensure that these powers will not affect bus lanes, cycleways, the Safer Lorry scheme and the congestion charge zone, and I would be grateful if the Minister could say whether he feels that he has already met, in his earlier comments, the wish of Camden Council for those specific provisions.

The third request by Camden Council is for an assurance that the promoter of HS2 will meet the costs incurred by local authorities in putting in place, and removing, traffic regulation orders required by the Secretary of State. Perhaps the Minister could comment on that. If he feels that he covered it in his introductory comments, I apologise for raising them again. I am, however, raising them just to make sure that they have been covered.

Will the Minister also say how many organisations or local highway authorities are still making representations to him on this issue? Is the number considerable, or is it fairly limited? Is the number of outstanding points fairly limited? As I understand it—as others have said—discussions are still taking place, and it would be welcome if the Minister could let us know, either now or at Third Reading, whether those outstanding issues have been addressed. It is not unreasonable to ask the Minister to say something at Third Reading, bearing in mind the late arrival of the amendment in Committee and the fact that the Minister agreed to withdraw it and we are having our first discussion on the schedule only today. In that context it is not unreasonable to ask the Minister to update us today, and indeed at Third Reading, on whether there are outstanding issues with local highway authorities.

Lord Ahmad of Wimbledon Portrait Lord Ahmad of Wimbledon
- Hansard - - - Excerpts

My Lords, again I thank the noble Lords, Lord Berkeley and Lord Rosser, and the noble Baroness, Lady Randerson, for their contributions, and for making time to meet me and my officials to discuss this issue. As I said in introducing the amendments in my name, I have made full acknowledgement, both in Committee and earlier this afternoon, about the way the amendments were originally presented. We learn from some of the issues that arise both from the legislative process and from the scale of a project such as this. As the noble Lord, Lord Berkeley, said, there are occasions when challenges arise and we try to deal with them. Equally, with infrastructure projects—not just HS2 but other projects coming forward—it is important to learn from experience, as we have from Crossrail. We have been putting in place much of what we have learned from the Crossrail experience, which has been positive, in our discussions.

I will speak to the specific amendments tabled by the noble Lord, Lord Berkeley, and I will address some of the issues raised by the noble Baroness and the noble Lord on issues around existing provisions and assurances. First, I put on record my thanks to the noble Lord for his specific help with the further development of the Government’s amendment on TROs. As I noted earlier, I totally understand the sentiment and I acknowledge the contributions made in this regard.

The noble Lord, Lord Rosser, asked about ongoing discussions. My understanding is that there are ongoing discussions but that they are mainly with TfL. Indeed, the latest meeting took place only a few hours ago—and, as I told the noble Lord, Lord Berkeley, outside the Chamber this afternoon, these discussions are going forward in a positive way, in terms of understanding and taking account of the concerns of, in this case, TfL. I will check, but my understanding—as I said to the noble Lord, Lord Rosser—is that the discussions are only with TfL and that the concerns of other local authorities have been addressed. If that is not the case I will confirm it to the noble Lord, as he suggested.

--- Later in debate ---
Lord Berkeley Portrait Lord Berkeley
- Hansard - - - Excerpts

My Lords, I declare an interest as chairman of the Rail Freight Group. I think I have some good news. I pay tribute the Select Committee’s work on this. I know that it tried very hard and quizzed lots of people as to how it could be done. As is so often the case, when it gets to the stage of involving contractors, sometimes contractors have good ideas. I was talking to some of them and their specialists last week. One of the key ideas is if you bore tunnels from Old Oak Common to Euston and you complete at least one at any early stage, you can take the spoil out through the tunnel. This is a very good idea because you can then deal with it at Old Oak Common. I am told it is possible; they are trying to work it into the programme. If it is possible, the figure for getting spoil and demolition out would probably go up to above 50%—I was told 70% or 80%—which is really good news. In other words, they have come up with some creative ideas. Maybe we were wrong to criticise HS2 in the past for not coming up with such ideas. It has given us a lot of debating time and the committee several days of discussion, but at least people have come up with a good idea. I think four contractors are tendering and I do not know whether they will all adopt this, but it demonstrates that it is possible. I hope Ministers will do all they can to encourage the contractors to be similarly creative.

There is another issue. In Committee we discussed concreting materials and other materials. The present amendment covers just concreting materials. The creative people are now saying, quite rightly, that they cannot bring cement in by train because it takes too long to unload, but that they can bring in most of the concreting aggregate by train and they can put a batching plant for mixing it somewhere on site. I am sure the committee looked at different locations for that; I have, and it is possible. As the noble Baroness said in her opening remarks, there is not a capacity problem for these trains going into Euston at night. It could easily be done.

I hope the Minister will accept these amendments as pointing the way forward to encouraging HS2 to continue to be creative like this. We do not want 1,500 trucks a day in Camden because the construction will last for 19 years—not that all those trucks will be there for 19 years, but they will still there be there for a considerable period. The basic movement out of spoil and demolition material by rail and bringing in concreting aggregate by rail would make a lot of people happy. I am convinced that the project can be done on that basis without any adverse effect on its programme or cost. If it is set up to do that, the contractors will do it well and it will work well.

Lord Rosser Portrait Lord Rosser
- Hansard - -

As has been said, the amendment calls for a plan to be published for each construction site in the Euston area to show how the number of lorries delivering to or from the site could be limited to meet laid-down restrictions by the weight of materials transported by road, with the remainder being carried by rail. As has been said, this is an issue to which the Lords Select Committee, on which the three main parties and the Cross Benches were represented, gave consideration. The committee said in paragraph 411 of its report:

“We are very strongly of the opinion that as much material as possible should be moved by rail, so as to reduce road traffic congestion and air pollution. However, we are convinced by the evidence that this aim will be significantly more difficult to achieve at Euston, as compared with most of the other projects referred to by Mr Dyer and Lord Berkeley. We are satisfied that HS2 is taking this responsibility seriously, and we are hopeful that significant progress will be made as the time comes for contractors to be appointed and become involved in the detailed planning. In the meantime we see no useful purpose to be served by attempting to set fixed targets. It would be little more than plucking aspirational figures out of the air”.


We do not diverge from the position of the Select Committee. Since it is also our view as much material as possible should be moved by rail, we will not vote against the amendment if it is put to the vote. Indeed, we want to see the “significant progress” made with contractors to which the Select Committee referred in its report.

The amendment does not indicate what should happen once the plan has been published. The plan would be required to set out how the number of lorries could be limited to deliver the restrictions on movement referred to. Presumably, this would be without any detailed reference to costs or any other potential implications. Frankly, rather than the terms of the amendment, with what the Select Committee might or might not regard as its aspirational figures, surely what is required to deliver for the citizens of Camden is a firm commitment from the Government to hold HS2 to the undertaking it has given to maximise the movement of materials by rail, including in the Euston area, despite the difficulties referred to by the Select Committee, with a view to its going well beyond the guaranteed baseline for moving materials by rail of 28% of excavated soil and 17% of imported construction materials. Paragraph 117 of the promoter’s response to the Select Committee’s special report says:

“The Promoter reiterates its overarching commitment to continue to seek to maximise, as far as reasonably practicable, the amount of material that can be moved by rail, and the underlying commitments it has given the London Borough of Camden”.


I hope the Minister will address this point about how the Government intend to ensure that maximising the movement of materials by rail is delivered.

Lord Ahmad of Wimbledon Portrait Lord Ahmad of Wimbledon
- Hansard - - - Excerpts

My Lords, I thank all noble Lords who have taken part in this debate. I do not think there is a difference of opinion over the intent here, whether in the amendment that the noble Baroness has tabled, in the comments of the noble Lord, Lord Rosser, with which I find it very hard to disagree, or the findings and recommendations of the Select Committee. As I noted in Committee, I agree with the ambition to maximise the use of rail for the transportation of material in relation to HS2. The Government absolutely share the concerns about the impact of HS2 construction on the road network, and have already made commitments with similar intentions. I assure the noble Baroness that we have also committed to maximise the volume of excavated and construction material to be brought in and removed by rail. This will need to be done while balancing the wider environmental impacts on the local community and on passenger services.

In moving the amendment, the noble Baroness talked about specific infrastructure projects; indeed, she mentioned Crossrail. Firm targets on this issue are not the manner by which previous infrastructure projects, which she mentioned, were managed, and that includes Crossrail. The amendment as tabled suggests those particular targets. It is not that we are shying away from targets but, as I have said—perhaps I can reassure her again—we are already committed to work with local traffic management authorities in developing plans in liaison with the relevant highway and traffic authorities, which will be the means by which we agree, manage and monitor lorry traffic flows. Ultimately, and I emphasise this point to the noble Baroness, it is also the local authority that must approve the local routes used in connection with HS2.

The noble Lord, Lord Rosser, asked about the Government’s position. A commitment is an assurance to Parliament, and all assurances will be passed to the contractors in the contracts that are negotiated.

To come back to Crossrail, what worked so well was the fact that the agreements were locally negotiated. I totally concur with the conclusions of the Select Committee, which the noble Lord, Lord Rosser, alluded to in his comments; he mentioned quite specifically that setting targets now would mean plucking figures out of the air. This does not take away from the importance of HS2; indeed, the noble Lord, Lord Berkeley, talked in his contribution about the intent that has already been shown in the response to the Select Committee by HS2 regarding the important issue of moving material as much as possible by means other than roads. I come back to the key point that those local plans must be agreed by the local authority.

I hope the noble Baroness is not just assured but reassured by the commitments that I have given. I have listened very carefully to her contributions and those from the noble Lords, Lord Berkeley and Lord Rosser, and I do not think there is a difference of opinion about material—excuse the pun—or the substance of what is being proposed and the way forward. This is about ensuring that HS2 works hand-in-glove with the local authorities to ensure that, whatever local targets are set, it maximises the use of alternatives to roads, and that any roads that lorries may use in removing such soil is approved by the local authority and the local traffic management authority. I hope that, with the assurances I have given, the noble Baroness will be minded to withdraw her amendment.