Debate between Mark Lazarowicz and Kelvin Hopkins
Thursday 31st October 2013

(10 years, 6 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Kelvin Hopkins Portrait Kelvin Hopkins
- Hansard - - - Excerpts

I am convinced that elsewhere on the network train frequencies and train paths are the problem. We have far too few trains on the existing network, and we could run many more trains much more quickly. The only real tight capacity is between London and Birmingham. Beyond that it is not difficult.

I do not want to speak for too long, but I want to mention other routes. In 1990, British Rail ran a test train from London to Edinburgh on the east coast main line. They cleared the line of everything else, ran the train straight through with a two-minute stop at Newcastle, and did the journey in three and a half hours—two minutes faster than the original time proposed for HS2.

Mark Lazarowicz Portrait Mark Lazarowicz
- Hansard - -

Is not the answer to my hon. Friend’s objection the fact that, as he said, they cleared the line of everything else? The point is that we cannot just clear the line of everything else.

Kelvin Hopkins Portrait Kelvin Hopkins
- Hansard - - - Excerpts

Perhaps my hon. Friend will allow me to continue. Clearing the lines is obviously not possible all the time, but upgrading the line so that we can have through trains is not difficult. [Hon. Members: “It is!”] I have specifics. We need to double the viaduct north of Welwyn, and four-track the line between Huntingdon and Peterborough. We need flyovers at Peterborough and Newark, and we could then have non-stop trains straight through to Edinburgh if we wished. The train would have to slow down at Newcastle and York, but by and large the journey could be done in three and a half hours maximum. That is the east coast main line.

As we know, the midlands main line is going to be electrified, and we also want it to improve. With some track remodelling at Leicester and Derby we could make the trains run faster there. We need to straighten out the line at Market Harborough and restore the straighter line that used to exist, and we must take freight traffic off those three lines. That is the key to more train paths, because if we can take all the freight off those lines, we will not have a problem. To do that, however, we need an alternative. We have such an alternative: a GB freight route, which I have been promoting for some years with colleagues from the railway industry. We have a detailed scheme, carefully worked out and costed, to build a dedicated freight line from the channel tunnel to Glasgow, linking all the main conurbations of Britain, and capable of taking lorries on trains. We need to take freight off the road—and off the main lines, of course, but 80% of freight travels by lorry, not by container or other means. To get lorries on trains is crucial to modal shift, and to do that we need a gauge capacity that is capable of taking lorries on trains.

High Speed 2

Debate between Mark Lazarowicz and Kelvin Hopkins
Thursday 13th October 2011

(12 years, 7 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Kelvin Hopkins Portrait Kelvin Hopkins
- Hansard - - - Excerpts

I thank the hon. Lady for her support. We have neighbouring constituencies and share the rail route that runs through our towns.

In the end, the problem comes down to the west coast main line, which needs the signalling to be upgraded to the most modern standard, more train paths, and to get the freight off the line. Freight and passengers do not mix. Freight trains move more slowly, and they damage the track more than the lighter passenger trains, so we need to invest in a dedicated freight line running up the backbone of Britain, from the channel tunnel to Glasgow, linking all the major conurbations. I have supported that scheme for a long time, and it would take 5 million lorries a year off the roads, as well as removing all the freight traffic from the east and west coast main lines. The passenger routes need to be separated from the freight routes and upgraded to improve capacity. I believe that that is what we need, and that is why I am sceptical about the HS2 scheme.

That freight route could be built in four years for as little as £6 billion, and it would cause no environmental difficulty because it could use existing under-utilised routes and old track bed could be brought back into use. That, and a couple of tunnels, would make the whole thing work. I have made this case time and again in the Chamber over the past 14 years, and I have mentioned it to the Minister of State. I have presented a paper on it to the Transport Select Committee. I also know engineers who have worked on the scheme and worked the details out. It just needs to be done. Fifteen of us had a meeting with the Secretary of State for Transport in the previous Government to put our case for the scheme, but the Department was so hostile because a small section of our proposed route overlapped the route it wanted to use for HS2. Even if HS2 is built, the lines could be paralleled at that point. There would not be a problem.

We need a freight route that is capable of taking full-scale lorry trailers on trains. That could never be done on existing routes without incurring the prohibitive cost of raising all the tunnels and bridges throughout the network. We need a track that has the capacity to take double-stack containers. Most of our existing routes cannot even take standard 9 feet 6 inch containers. We also need a track that has the capacity to take continental trains, which currently cannot get through our platforms because they are too wide, the gauge is too big. We need to be able to accommodate trains travelling from, say, Rome to Birmingham carrying San Pellegrino water.

Mark Lazarowicz Portrait Mark Lazarowicz
- Hansard - -

My hon. Friend is making a powerful argument for a major extension of the rail network. Given that one of his reasons for opposing HS2 is its cost, will he give us an estimate of the cost of all the various improvements and new lines that he has just described?

Kelvin Hopkins Portrait Kelvin Hopkins
- Hansard - - - Excerpts

Some two or three years ago, we had lunch with some people from Bechtel, one of the train manufacturing companies. We were talking about a cost of £4 billion or £5 billion at that time. We talked about an outside figure of £6 billion, but the Bechtel representative looked at the scheme and said he could do it for £3 billion. That would be a fraction of the cost even of Crossrail, which I support. This is not about cost, however; it is about whether HS2 is necessary. I think that we could achieve the desired result by doing it differently. We could upgrade existing routes to serve all the intervening towns, and we could provide the necessary capacity by getting all the freight off those lines and on to a new freight route. I ask the Department for Transport to take our scheme seriously, because that is what we need for the future.

--- Later in debate ---
Mark Lazarowicz Portrait Mark Lazarowicz (Edinburgh North and Leith) (Lab/Co-op)
- Hansard - -

I support the extension of high-speed rail north of London, not just because I believe that it is in the best interests of my constituency and of Scotland but because I believe that it will benefit the whole United Kingdom in economic, transport and environmental terms. It makes sense for many reasons, including the need to increase capacity, which other Members have mentioned. Incidentally, the idea that the only people who use long-distance trains are rich businessmen will come as something of a shock to those who regularly use east-coast and west-coast lines. The development will, in fact, benefit many people throughout the country.

The existing network needs to be modernised in various ways, but it is ridiculous to suggest that it is possible to solve the capacity problem throughout Britain simply by modernising and upgrading it. As I said in an intervention, trying to replicate high-speed lines on the routes of existing lines would lead to decades of disruption and economic disbenefits. It is cheaper to build new lines, and, as the hon. Member for Cambridge (Dr Huppert) pointed out, if new lines are to be built anyway, they might as well be high-speed lines if possible.

I do not support high-speed rail just for the sake of it—just because I want trains to travel as fast as they can. I accept that, in some localities, lower speeds may be acceptable for environmental reasons on the wider network. The fact remains, however, that reducing travel time between parts of the United Kingdom will create a number of benefits. Moreover, extending the line not just to Birmingham, Manchester and other parts of what, to me, constitutes southern England, but further north to Edinburgh and Glasgow, will produce the maximum economic and environmental benefits. The longer the journeys involved, the greater the possibility that passengers will travel by rail rather than air, and the more will be saved through high-speed rail. It will be possible to make significant cuts in air travel from Scotland to London if journey times can be reduced to less than three hours, and the same applies to road travel between Scotland and the north of England.

Kelvin Hopkins Portrait Kelvin Hopkins
- Hansard - - - Excerpts

In 1992, having freed up the line, British Rail ran a test train from King’s Cross to Edinburgh at 140 mph, and did it in the same time as HS2 is proposing for its trains.

Mark Lazarowicz Portrait Mark Lazarowicz
- Hansard - -

I think that that makes my point about capacity. Obviously, the line could not operate like that every day, because a fair number of trains would be running at the same time.

Many of the business cases for the extension of the line to the midlands and the north of England do not take account of the economic benefits in business and tourist travel that would result if it were extended to Glasgow and Edinburgh. The increase in passengers would generate economic benefits, and the best business and economic case will be produced if there is agreement that the line should extend to Scotland, ensuring that we are not excluded from the system.

My only worry about the current proposal is that we in Scotland, and indeed those in the north of England, would be at risk if the line extended no further than Birmingham, Leeds or Manchester. Trains cannot start at every part of the country at the same time, but we certainly do not want them to arrive at Birmingham at 2026, at Manchester or Leeds at 2033, and then—if we are lucky—at Edinburgh or Glasgow at 2050. That would be extremely damaging to our relative economic prosperity in the UK.