England-Wales Transport Links Debate

Full Debate: Read Full Debate
Department: Department for Transport

England-Wales Transport Links

Mark Williams Excerpts
Wednesday 6th February 2013

(11 years, 3 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

9.30 am
Mark Williams Portrait Mr Mark Williams (Ceredigion) (LD)
- Hansard - -

It is a privilege to serve under your chairmanship this morning, Mr Betts, and to raise cross-border travel, which is critical for Wales. It was the subject of two inquiries by the Select Committee on Welsh Affairs in the previous Parliament, and, as is so often the case with such inquiries, the issue is now being revisited by the present Committee. The Government will of course have the opportunity to respond when we have agreed our report.

I shall not pre-empt that, but would mention one way in which the reports are characterised: there has been a lot of discussion of north Wales and south Wales connectivity, quite rightly, but some colleagues may empathise with me when I say that mid-Wales is often lost in the debate. However, a few Select Committee veterans are here among my hon. Friends and colleagues, and others with border constituencies will no doubt want to talk about the important issues of Severn bridge tolls, First Great Western franchise arrangements and the quest for electrification in north Wales. Should I stray intermittently into devolved matters, I apologise from the outset, but responsibility for transport is fragmented, as our report of 2009 stated, and that requires robust co-ordination between the Governments at Cardiff Bay and Westminster.

The 2009 Select Committee report said that rail

“improvement schemes are too often only evaluated on their local benefits”,

that we require greater co-ordination of rail franchises and that we have seen

“a general failure to predict increases in passenger demand and...insufficient rolling stock is available on certain routes particularly at busy times.”

Those, certainly, are characteristics of the debate about the rail line that ends in my constituency in Aberystwyth and passes through that of the hon. Member for Montgomeryshire (Glyn Davies).

Arriva Trains Wales operates the Cambrian coast line service between Birmingham International and Aberystwyth. The absence of an hourly service across mid-Wales is not merely a parochial matter, nor is the loss of a direct service between Aberystwyth and London some 20 years ago. The economic benefits of connectivity, for the movement of people and of goods and services, should not be understated. The town of Aberystwyth has strategic significance. We do not hear much about the mid-Wales corridor. We hear a lot about the A55 and the M4 corridor, but there is a mid-Wales corridor, and the Select Committee made that point in another of our many inquiries—we are a very busy Committee—into inward investment:

“We are concerned by evidence that the quality of transport links in Mid and North Wales and the connectivity between the rest of Wales and England deters overseas investment in parts of Wales.”

Part of that debate is about roads, and colleagues may want to talk about that, but I want to discuss rail and my belief that mid-Wales is being held back, which is why arrangements across the border are so critical. The local perception is that we have a second-rate service. That is not always a failure of the franchisee. Sometimes, it is a failure of political will and opportunity.

My enthusiasm on the matter led me to suggest to the Select Committee Chair that not only should we take evidence on transport matters in Aberystwyth, but we should travel there by train. Not all members of the Committee were brave enough to experience that, although some were. I salute the hon. Members for Carmarthen East and Dinefwr (Jonathan Edwards) and for Swansea East (Mrs James), for their support in travelling by train. I could have written a soap opera script. We left Euston on time, to embark on our journey of four hours and 40 minutes. It was regrettable that that was compounded by a two-hour wait at Birmingham International station, as we missed the connection. There are limits on what one can do for two hours at Birmingham International station.

Simon Hart Portrait Simon Hart (Carmarthen West and South Pembrokeshire) (Con)
- Hansard - - - Excerpts

A word of advice: go to Paddington. It is much easier to get to Aberystwyth from there.

Mark Williams Portrait Mr Williams
- Hansard - -

Sadly, in my constituency, people then have to contend with the roads—I live in the north of Ceredigion. I enjoy the friendship and camaraderie of the hon. Members for Swansea East and for Carmarthen East and Dinefwr, but two hours sitting there waiting is a trial in many ways.

In evidence to the Select Committee, Passenger Focus

“identified inter-franchise connections as one of the main sources of dissatisfaction with cross-border services amongst passengers.”

The report was produced in 2009, under the previous Government, so perhaps the Minister can give some good news now, but we concluded:

“At present, there is no incentive for different train operating companies to provide connecting services or to ensure that connections are maintained when there are delays.”

When we finally got on our train, the journey continued to Machynlleth, in Powys. There we had the spectacle of the four carriages being reduced to two, and passengers scurrying from the back of the train to the front, to get into carriages to Aberystwyth; otherwise they would risk a prolonged although scenic journey—but it was getting late—up to Pwllheli. Those are the realities of the service that my constituents must use.

There has, overall, in the generality of Wales, been progress since the report was produced, not least because of the coalition Government’s commitment to rail electrification in south Wales. That is commendable and necessary, and progress is being made, for which I commend the Government. A debate is emerging on rail electrification in north Wales—the arrival in the Chamber of the hon. Member for Aberconwy (Guto Bebb) is timely, as is this important debate. The Assembly Minister announced in January that he will draw up a business case for that, and I look forward to hearing from the Minister about the liaison and discussion between the Government and Assembly Ministers. However, the lack of an hourly service in mid-Wales and the two- hour wait between trains across mid-Wales is not simply a matter of mild inconvenience. It is an impediment to the area’s growth.

During its inquiry on inward investment, the Welsh Affairs Committee heard from Professor Stuart Cole, of the university of Glamorgan, that

“if Wales was to compete successfully with countries in Eastern Europe, its transport facilities had to be able to help overcome the cost differentials and distances from these markets by becoming ultra-efficient and influence competitiveness for inward investment”.

If that is a message for Wales as a whole, it is a very poignant one for mid-Wales. We heard from UK Trade and Investment officials, who said that the current transport infrastructure in Wales could act as a potential deterrent to investors. We need to make sure that existing businesses and manufacturers are not hamstrung by any impediment such as lack of development of the transport network. The pressures that that could put on the tourism sector and the all-important higher education sector in my constituency are something that I reflect on. The Wales Tourism Alliance has said:

“If we are to succeed, we must get visitors, the lifeblood of the economies of Wales, into each and every corner of our country. At present internally and cross border we simply do not have the transport infrastructure to deliver the economic potential of many of our leading destinations.”

I contend—surprise, surprise—that many of those destinations are on the west Wales coast.

Jonathan Edwards Portrait Jonathan Edwards (Carmarthen East and Dinefwr) (PC)
- Hansard - - - Excerpts

The hon. Gentleman is talking about the historic under-investment in transport in Wales. If High Speed 2 —essentially an England-only railway—goes ahead and given that, despite the fact that transport is not actually devolved, Crossrail resulted in a 100% Barnett consequential, does the hon. Gentleman agree that a Barnett consequential for HS2 investment is essential, so that the Welsh transport infrastructure can keep pace with developments in England?

Mark Williams Portrait Mr Williams
- Hansard - -

I welcome that intervention. If the hon. Gentleman will allow me, I shall come on to that point because HS2 is of great interest to many of our constituents.

This is a historic debate. Seven years ago the National Assembly’s development committee heard evidence from the mid-Wales manufacturing group in Newtown. At the top of its list of key requirements for businesses to flourish were improved roads, rail and broadband. I would give five out of 10 for broadband but fewer marks out of 10 on rail.

What we need—there is a role for both Governments in this—is a stimulus that supports growth and creates a dynamic transport network in Wales. Much of the debate is internal and the exclusive responsibility of our National Assembly Government, but while that is appropriate, the fact that 16.4 million people live within 50 miles of the border makes cross-border services vital. Over the years of the rail franchise, we have seen strong development in that area, with Arriva Trains Wales reporting growth in its cross-border services of typically between 8% and 13%. On the Cambrian main line, which is a primary cross-border route connecting Aberystwyth to Shrewsbury and beyond, 900,000 journeys are made every year, and the average loading—I hesitate to use the word load to describe passengers, but it feels a bit like that sometimes—is about 125 passengers, which is slightly higher than the UK average. Although I appreciate that, in the current economic climate, there are great constraints on the Governments in Cardiff and Westminster, small, limited enhancements could bring genuine benefits to the community.

I will start with the modest aspirations. SARPA, the Shrewsbury-Aberystwyth Rail Passengers Association, has called for the improved utilisation of rolling stock resources, which could bring improvements to the service at minimal increased cost. Dealing with commuter trains in and out of Shrewsbury and Aberystwyth would be a good start. For example, at Shrewsbury, there is an early arrival from Aberystwyth at 7.11 am, but the next train arrives at 9.25 am, which does not make sense for the many people who need to get to work or college by 9 am. There is a lot of demand for travel to and from Shrewsbury for job opportunities, further education and medical services that are not readily available in mid-Wales, but the current timetable does not serve that demand effectively. Since privatisation, franchise holders have been instructed by the passenger service requirement to run trains with a two-hour frequency. Operators have happily taken the subsidy offered, but little thought seems to have been given by the franchisee to providing a service that reflects the demand for travel across the border.

I acknowledged at the start of my speech that transport policy is fragmented between the Assembly Government and the UK Department for Transport, but I know that there is a healthy dialogue between the Welsh and UK Departments because the Minister convinced me of that when I questioned him in the Welsh Affairs Committee. We also took evidence in Aberystwyth from the Welsh Minister Carl Sargeant, who spoke of an emerging much more positive relationship, so I know that to be the case.

Network Rail is, however, the responsibility of the Department for Transport. I salute the work of its Welsh division—the very fact that we have a Welsh division is an important message for those of us who believe in devolution. Network Rail has undertaken extensive infrastructure work, including the building of passing loops on our line, and we acted as guinea pigs for the development of the European rail traffic management system—the new signalling system that will be rolled out across Great Britain.

I am interested, however, in the Minister’s view on why we still do not have the hourly service. I do not want to damage his relationship with Mr Carl Sargeant, but does he regret, as I do, the apparent lack of will at Cardiff? There has been promise after promise after promise. Since 1999, we have been told that we will have our hourly service, and we have now been told that, as we do not figure sufficiently high in the priorities, we will have to wait until 2015. The service would plug an important gap in the timetable and make genuine commuting opportunities possible across mid-Wales.

At the same time, the Welsh Government have tried to kick-start a market between north and south Wales, with 10 services between Cardiff and north Wales and lower passenger numbers, and many argue that the route could effectively be served by three or four trains, rather than the 10 that it enjoys. An hourly service is a modest aspiration. We have been promised it before, and I hope we can push further for it following this debate.

There is a more ambitious proposal for train services in and out of mid-Wales and to London, which is the re-establishment of a direct service between Aberystwyth and London. Three years ago, we faced more disappointment when the Office of Rail Regulation threw out Arriva Trains Wales’s bid to develop the direct service. I declare an interest: I spend up to 10 hours a week on the train, somewhere between London and Aberystwyth. I have rarely driven here. My wife used to be an employee of Arriva Trains Wales—and a very good job she did, too. Arriva Trains Wales’s bid was an attempt to right a wrong that had emanated from privatisation legislation, which had meant the withdrawal by the successors to British Rail of a direct link to the capital.

In 2010, Arriva Trains Wales’s bid for a twice-daily service to London Marylebone was rejected. The company stated that the bid would unlock the potential of the mid-Wales rail market and bring it in line—that was music to my ears—with that of south and north Wales. It proposed to route a line for the direct service via Shrewsbury and Birmingham International, and the latter is important because many of my constituents and those who live in other parts of mid-Wales use the airport there; it is the airport for mid-Wales. The proposed service would have continued through Banbury, West Ruislip and Wembley to London Marylebone, and plans were drawn up for timetabling and rolling stock. The Office of Rail Regulation gave as its reason for rejecting the bid a concern about the “financial viability” of the new service. There were concerns about the abstraction of revenue from the sadly now former Wrexham, Shropshire and Marylebone Railway Company, and there were concerns from Chiltern Railways.

I well remember nearly 30 years ago InterCity 125s leaving Aberystwyth at 7 am. It was not exactly robust commuter traffic on a daily basis, but it sent an important signal of connectivity from a peripheral area to the rest of the country. I also remember freight being delivered on that service to Aberystwyth. I am flying the kite to the Minister, resurrecting the ghost of that service, in the expectation that he can help us, and that the Minister at Cardiff Bay is listening, too. We should at least explore the possibility of a direct service once again, and I hope that the Department for Transport and the Assembly Government will look favourably on that. The consequences of the rejection of the Arriva Trains Wales bid has been that, since 1991, Aberystwyth is one of the few towns in Britain left without a direct link to the capital.

I want just to touch on two other things; I know that colleagues want to talk about issues that affect their localities. In 2018, the Arriva Wales franchise will be up for renewal, so can the Minister clarify who has ultimate responsibility for arrival at the new franchise? Can he confirm that there are two signatures on the documentation for it? Or, is it the sole responsibility of our Assembly Government? Either way, the matters will, I am sure, be part of the Silk commission’s work when we look at the devolution of responsibility. Clarity about rail franchises will be considered as Paul Silk embarks on part 2 of his inquiry into further powers.

I also want to talk about the historical matter of the initial subsidy agreement, which was not signed under the Minister’s watch, between the then Strategic Rail Authority and Arriva Trains Wales. There was an agreement for a one-year subsidy of £120 million, which would reduce over the 15 years of the franchise to less than £100 million. The Welsh Assembly Government, rightly within their remit, have decided to pursue a positive policy, including increasing train lengths, acquiring new trains and extending platforms, but I just wish we could see a bit more of the money in mid-Wales.

The policy resulted in the subsidy increasing, in 2012, to £140 million, and it has been suggested by some, including our Select Committee, that some of the problems with congestion and overcrowding are the result of inadequate modelling of predictions for growth in the industry. The Select Committee concluded in its 2009 report that

“overcrowding is the result of poorly designed franchises which paid no heed to industry forecasts for passenger growth.”

Consequently, the Government in Wales are paying for investment. Some have suggested that Wales is being short-changed.

Many people I talk to have a wrong perception that HS2 will directly affect train travel in and out of Wales. HS2 will have an effect. Perhaps if we get the electrification that we all want in north Wales, it will have a positive effect on travel. I am dispelling a perception in my constituency that, somehow, we might step off a slow Arriva Trains Wales train somewhere in Birmingham and hop on to a fast train and head off down to London with 40 minutes taken off our journey. Of course, that is not the reality, which leads me to question the benefits that will accrue to large parts of Wales. The hon. Member for Carmarthen East and Dinefwr made a point about the scheme’s possible Barnett consequences.

I could go on at great length. The debate is as broad as the border is long. I could talk about so many issues, but I am keen to flag up one persistent problem: the more we talk about north Wales and south Wales, the more our constituents in mid-Wales say that we are somehow being short-changed. We are not getting the service that we need, not just for those daily trips in and out of Shrewsbury to do some shopping at Marks and Spencer, but to access the services that we require to develop our area economically.

Guto Bebb Portrait Guto Bebb (Aberconwy) (Con)
- Hansard - - - Excerpts

I appreciate the hon. Gentleman’s comments on north Wales, south Wales and the exclusion of mid-Wales, but does he recognise, for example, the Conwy Valley railway line in my constituency? The line links to Meirionnydd, which I define as being in mid-Wales. One of the key issues for the Conwy Valley railway line is that timetabling means someone leaving Blaenau Ffestiniog on the 7 o’clock train to Llandudno junction will miss the trains to Chester and London by four minutes. Is timetabling not part of better servicing mid-Wales?

Mark Williams Portrait Mr Williams
- Hansard - -

I commend the hon. Gentleman on his arrival. I am not sure whether he was here when I talked about timetabling. Franchise arrangements are slightly different in that instance, but there is a need for franchise agreements to ensure synergy between timetables, because one of my constituents’ persistent complaints is that we do not have the integrated approach that he and I both want.

I have used this at the end of many debates on Wales, and I say “chwarae teg” for trains in mid-Wales.

Clive Betts Portrait Mr Clive Betts (in the Chair)
- Hansard - - - Excerpts

Seven hon. Members want to speak. If I allow 10 minutes for the wind-ups, there is a maximum of seven minutes for everyone who speaks. I cannot enforce the guideline, which is advisory, but it would be helpful if Members kept to it.

--- Later in debate ---
Yvonne Fovargue Portrait Yvonne Fovargue
- Hansard - - - Excerpts

I was going to come to that point. Early discussions with the Welsh Government are essential, and there should be acceptance of the underlying principle that they should play a central role in determining future arrangements, and in accessing and utilising any future revenue streams for the people of Wales.

My right hon. Friend the Member for Delyn (Mr Hanson) and the hon. Member for Brecon and Radnorshire spoke about buses, which are a lifeline for many people, particularly pensioners, but the two national concessionary bus passes are not valid for pensioners who wish to cross the border from either side. They are left to rely on voluntary schemes provided by local authorities. There is also a lack of awareness about the convenience of bus routes into Wales from Bristol, despite the fact that they have a competitive price, due to exemption from tolls. Will the Minister say what is being done to address both those issues and how he will promote cross-border bus services?

I turn to rail, where there are significant challenges, as we have heard, around capacity and infrastructure. I am pleased that the Labour Administration in Wales is exploring not-for-profit models, including the co-operative mutual model, when the Wales and Border franchise, currently operated by Arriva Trains Wales, expires in 2018. I hope that that will prove a pathfinder for England. A major electrification project for the Great Western railway line to Swansea was introduced by the previous Labour Government, but put on hold by the coalition. Despite that delay on the Government line—perhaps it was caused by the weather, perhaps by leaves—that has now been reconfirmed, and the journey time from Paddington to Swansea could be reduced by 20 minutes. However, will the Minister say why the work is to start in London and not in Wales?

As we have heard many times, closer co-operation between train companies is vital if they are to be financially viable. What is the Minister doing to promote that? Inter-franchise connectivity is a key component, as has been mentioned, and it is certainly not helpful to have companies such as Wrexham and Shropshire, which ran the cross-border services between 2008 and 2011, withdraw, as they were not allowed to stop at Virgin-run stations. It is important that franchises co-operate with each other to ensure that journeys are made with the minimum disruption and that they do not have to go through convenient stations, simply because they are operated by another franchise holder.

The hon. Member for Ceredigion will be interested in the fact that the Welsh Government have committed to a long-awaited hourly service between Aberystwyth and Shrewsbury—I am sure that 2015 is too far away for him—but more emphasis needs to be put on improving services to north Wales, as we heard from my right hon. Friend the Member for Delyn, and electrification is a key component. Will the Minister update us on the progress of the business plan for that?

Mark Williams Portrait Mr Mark Williams
- Hansard - -

Does the hon. Lady accept that the 16 years that we have been waiting for this really is too long? We were promised in the previous Assembly Administration that the money was there, that the remedial engineering work had been done and that there was no impediment to getting that service. Here we are, years on, still waiting, only to be told by a Welsh Assembly Minister that we now have to wait another two and a half or three years to have that service. That wait really is unacceptable, is it not?

Yvonne Fovargue Portrait Yvonne Fovargue
- Hansard - - - Excerpts

It certainly is an extremely long time, and the Administration have said that it will happen by 2015, so let us hope that they will advance it further and that they have listened to the pleas of hon. Members from all around.

On the HS2 connection at Crewe station and connectivity, the Government need to give proper consideration to ensuring that the benefits extend into Wales. I am pleased that the Minister intervened to give support and provide information about the electrification of the south Wales line, which needs to be progressed urgently.