None Portrait The Chair
- Hansard -

Before we begin, I have a couple of preliminary announcements. I encourage Members to wear masks when they are not speaking, in line with Government guidance and that of the House of Commons Commission, and to give each other and members of staff space when seated and when entering and leaving the room. Hansard colleagues would be grateful if Members could email their speaking notes to hansardnotes@ parliament.uk. Please switch electronic devices to silent. Tea and coffee are not allowed during sittings.

We will now hear oral evidence from Sarah Albon, chief executive officer of the Health and Safety Executive; Peter Baker, chief inspector of buildings at the Health and Safety Executive; and Graham Russell, chief executive officer at the Office for Product Safety and Standards. Before I call the first Member to ask a question, I remind all Members that questions should be limited to matters within the scope of the Bill, and that we must stick to the timings in the programme motion that the Committee has agreed. For this session, we have until 10.15 am. May I start by asking the witnesses to introduce themselves for the record?

Peter Baker: Good morning, everyone. I am Peter Baker, chief inspector of buildings at the Health and Safety Executive.

Sarah Albon: Good morning, everyone. I am Sarah Albon, chief executive of the Health and Safety Executive.

Graham Russell: Good morning, everyone. I am Graham Russell, chief executive of the Office for Product Safety and Standards within the Department for Business, Energy and Industrial Strategy. I am responsible for building the construction products regulator.

Mike Amesbury Portrait Mike Amesbury (Weaver Vale) (Lab)
- Hansard - -

Q80 Good morning, Sarah, Peter and Graham. Does the scope of the Bill give you sufficient resources—the toolbox—to change the landscape of building safety in this country?

Sarah Albon: That is a very broad question. I will bring Peter in on some of the technical aspects of scope. It gives us a real opportunity to take a holistic approach to the management of safety in buildings, from the very beginning of the design phase, through building and into occupation. It is important to recognise that although there is rightly a lot of focus on the taller buildings that are in scope for the special gateway process and the safety case process that will go on once buildings are in occupation, there are many other aspects in the Bill around improving the competence of those who work in the various aspects of the industry and in oversight of that, and around the wider built environment, that will apply to all buildings and all professionals working across the industry. It gives the foundation for a real sea change in the improvement of safety in the built environment in this country.

Peter Baker: To add to that, if you take a step back and look at the findings from Dame Judith Hackitt’s review about poor culture, attitude and behaviour of the industry, the lack of accountability of individuals, the lack of resident engagement, and all the things that were found to be wrong with the system as it stands, the Bill covers off all those points and, in fact, goes further in a number of areas. I am fairly confident that the Bill, as currently structured, addresses all the key points that Dame Judith raised in her report.

Graham Russell: If I may add to that, the products that go into those buildings are the foundation, if you will, of the safety approach, culture and regulation that we have just heard described. It is our responsibility to make sure that those products are what they say they are and that they are properly labelled and traceable, and the Bill makes provision for that through the schedule and then through statutory instruments.

Marie Rimmer Portrait Ms Marie Rimmer (St Helens South and Whiston) (Lab)
- Hansard - - - Excerpts

Q Good morning to each of you. The Government have chosen not to legislate for a register of competent building safety managers, and said that any register should be industry-led. Are the Government right to leave it to industry?

Sarah Albon: I think there is always a balance between what industry needs to do and what the overarching regulatory regime seeks to do. From my perspective, it is important, in addressing the cultural issues, that we recognise that, ultimately, it is not the regulator or Government who will lead to a sea change in behaviour, but industry. It is therefore important that the responsibility for driving improvements, and for ensuring that people have the right kind of competence and do the right thing, rests squarely with industry, as well as the ownership of safety within individual buildings resting squarely with the owners of the buildings who are responsible for safety within them. They are the only people on the ground who can, day in, day out, ensure that things are being managed properly and that people are competent and are appropriately fulfilling their duties and obligations under the law.

Peter Baker: I would add that it will be set out in the legislation that a building safety manager is required. As Sarah said, the key thing for me—we have seen this with other workplace health and safety requirements—is that, although the building safety manager will have an important role on a day-to-day basis in effecting the safety, engaging with residents and so on, the accountability for the accountable person who is ultimately responsible for that building is not inadvertently delegated to the building safety manager, so that the BSM effectively takes on the ownership of the risk. That should be firmly with the accountable person, because they are the individual or the company that has the resources and the capability to really manage the risk.

Graham Russell: This is not an area for me.

--- Later in debate ---
Daisy Cooper Portrait Daisy Cooper
- Hansard - - - Excerpts

Q Good morning to both of you. This is a question for Richard. In paragraph 11 of your written evidence, you said:

“We all know that these problems have been caused by historic regulatory failures, dating back decades. We need to be careful that the solution doesn’t simply absolve the Government of its responsibilities and pass them on to consumers, whether that’s existing or future residents.”

If that is not the solution, then what do you think the solution should be?

Richard Silva: Thank you for the question. It goes to the heart of our role in this sector. As a freeholder, we do not develop, build, design or sign off on these buildings. We effectively, under the new regime, take ownership of them post gateway 3, when they are fit for occupation. The Bill, in many respects, is an excellent starting point and provides a good framework for looking forward. The problem is, what are we going to do about the existing stock that is in a mess? Our view is, simply, that there are three areas where this should be addressed.

The Government should be commended for trying to fix a problem that successive Governments have caused through a defective regulatory regime, whether that is from a construction perspective, or by signing off on materials and building systems. In that context, I think the Government should underwrite the process of fixing the existing stock.

That is not to say that taxpayers should foot the bill for everything. The Government should take responsibility —they are starting to do that through the presentation of this Bill—and then look at recourse from those who created the mess. The Government’s culpability lies in the regulatory regime and the failure there, although there are bad actors in the construction industry and the product manufacturing industry, and the Government should go after them to recoup as much of the investment as needed to bring existing stock up to standard.

There is a final and third point that will be less popular from a leaseholder perspective, but it is important to articulate. When investigations are made into an unsafe cladding system in a defective building, and the cladding is taken off, other historical problems will be identified. Not all of those are caused by shoddy workmanship or defective materials; they may be due to a lack of investment in the life cycle and maintenance of those buildings. We advocate a mandatory reserve regime—a bit like in the States—in which a periodic assessment is carried out independently, not by the managing agent or building owner, which in this context could be a commonhold association, a residents’ management company or right-to-manage company, or a freeholder, but by an independent assessor, who looks at short, medium and long-term requirements for reserve funding and regular life cycle maintenance for that building. The leaseholders then contribute to that over the super-long term, based on various apportionments under the service charge regime.

This is a long-winded answer, but it is an important point. For example, every 25 years, a block of flats will need a new roof; it is not a building safety issue, but a maintenance issue. If someone lives in that block for 20 years and then sells, but no provision has been made, is it fair for the buyer to be hit with a massive bill a few years later, when they have not enjoyed the life cycle of living there? Anyone who owns a property should make that provision, and it should be mandated as opposed to voluntary.

Mike Amesbury Portrait Mike Amesbury
- Hansard - -

Q Does the Bill ensure that key stakeholders in your industry, rather than the leaseholders, are paying their fair share for a mess that was created over a series of decades?

Richard Silva: If you are referring to whether building owners should pay to fix the existing stock, a distinction should be drawn between the responsibility for maintaining the existing stock and the liability to pay; I covered the liability to pay in my previous answer. The responsibility should absolutely lie with the accountable person, under the new regime. Historically, the accountable person has been either the freeholder, where there is a two party lease, or, where the building is resident-controlled—as roughly two thirds of our portfolio is—the RMC or the RTM. In the future, when the Law Commission’s proposals are brought into legislation, it could be the commonhold association. They are responsible, with emphasis on the word “responsibility”, for the maintenance and repair of buildings. It is a complicated answer, but it does go to the Building Safety Bill, and the question of who will be accountable in the future.

It is an interesting debate. We have to ask ourselves whether members of an RMC or a commonhold association have time, expertise and willingness to do that work. Certainly, our research suggests that people do not want to do it, for a whole bunch of reasons. Forget criminal and civil liability—it is about having the time. People have other things to do. In the context of the Bill, among the wider Government reforms on leasehold, we need to focus on the fact that the role of the freeholder will become redundant. That is unambiguous from the leasehold reform agenda proposed. That means that the work done by my building safety team—it includes chartered fire engineers and surveyors—for the leaseholders and at no cost to them, save a modest ground rent, will become redundant. So this part of the Bill needs to be really carefully looked at. Who wants to do this role, absent the professional landlord?

Kieran Walker: I would be inclined to agree with Richard on the accountable persons piece, moving forward. If I understood the question correctly, you are really asking whether costs are fair and proportionate for historical issues and for historical defective buildings. It is very difficult to answer, if I am honest with you. As has been mentioned already this morning, you have some really good practice going on in the industry in terms of the developers and construction companies, and you have some culprits in there as well. We know that as a trade body and as an industry. Similarly, the manufacturing process and the manufacturing companies also have some culprits.

It is difficult, therefore, to nail down whether costs are fair and proportionate. Obviously, as of next year, our industry will feel the impact of the residential property developer tax, as well as the building safety levy. Time will tell whether that is fair and proportionate. Obviously, the building safety levy is subject to consultation at the moment. I think that closes in mid-October and we are busily compiling responses to it. Within that scenario, some companies, responsible persons and organisations will pay part of, some of or none of the building safety levy, while others will pay the full residential property developer tax as well.

Time will tell whether costs are fair and proportionate, but I certainly think that things are moving in the right direction in respect of the Bill itself and in terms of levying costs.

Marie Rimmer Portrait Ms Rimmer
- Hansard - - - Excerpts

Q I have listened to your comments, but are the Government right to introduce the building safety charge on residents, by which building owners can recover the cost of building safety measures? If not, could that be done through the existing service charge instead?

Richard Silva: It is a very good point. We engage with a lot of the managing agents who manage our blocks on a day-to-day basis and I think that there needs to be clarity on this point in the Bill. A separate regime for levying a charge to residents living in a block comes with cost and complexity; people need to understand what it is for.

It is a difficult one. There is service charge legislation in existence. There is a regime for it, with all of the reasonableness tests, information, budgeting, finalising of accounts and so on. I think that is probably quite a neat place for the building safety charge to become a specific sub-item within the overall service charge budget. Then, you are not really giving residents extra information—they are not understanding what the extra charge is really for—and it also helps to mask any chasm that might be in place between life-cycle maintenance and building safety maintenance, and where there is a crossover. It can become a bit ambiguous.

So long as the regime is clear, understood and, frankly, does not increase the financial burden on people living in their own homes, that is where the focus should be.

--- Later in debate ---
Daisy Cooper Portrait Daisy Cooper
- Hansard - - - Excerpts

Jayne first, please.

Councillor McCoy: London Councils feels that the scope of the Bill needs to be expanded. We think that the focus on height is a rather rough approximation of risk. As we know from experiences in Bolton, in Samuel Garside House in Barking and Dagenham, and in my ward, Worcester Park, we have had fires in buildings under 18 metres that would have resulted in loss of life if it had not been for luck—it was a matter of minutes. We know that there are fire safety risks in buildings under 18 metres. We think that height should not be the only approximation for risk.

We think all new buildings—so all heights—should be covered by the Bill. For remediation purposes, we think a risk assessment tool should be applied to look at the holistic assessment of a building. I think a tool is being developed in response to the Fire Safety Act that could be adapted and used for this measure.

Andrew Bulmer: In conjunction with the Fire Safety Act and noting that this Bill now extends its tentacles to below 18 metres for some limited functions—fire risk assessments and identification of a responsible person—the scope of the Bill is wider than it was and I feel it is a good place to start.

Mike Amesbury Portrait Mike Amesbury
- Hansard - -

Q What is missing from the Bill? This question is for both of you.

Councillor McCoy: A lot of additional clarification is needed regarding the accountable person, the building safety manager and their responsibilities. A lot of detail is required. We need that detail and clarification because the industry, including councils in particular, needs to gear up to meet those responsibilities. Until they know what those responsibilities are, they cannot effectively gear up and commit the resources.

In particular, I would talk about the skills within building safety management. There is a lack of skills out there at the moment. There is a lack of resource out there at the moment. We cannot recruit as a council. My council cannot recruit to building control at the moment because people are not out there. Until we have clarification about what the skills are, and a framework for that, we cannot build up the capacity and skills needed. I would also flag that councils need the resources to be able to do that, because an awful lot of burdens are falling on councils.

Andrew Bulmer: I concur with the councillor. There is a lot of detail in the regulations, especially when it comes to the role of the building safety manager. We would like to see the regulations brought forward. They can either go in the Bill or be introduced promptly. Until then, we are operating a little one-handed. We are anxious to prepare and gear up for this, but without that information we are struggling.

That is one thing that is missing from the Bill; the other is protection for leaseholders from historical building safety defect costs. We understand that the Bill has to be written in a way that allows the reasonable costs of safety maintenance going forward to be recovered. That is fair and reasonable, but at the moment there is no protection for leaseholders from existing building safety failures that they did not cause.

Marie Rimmer Portrait Ms Rimmer
- Hansard - - - Excerpts

Q The draft Bill is largely a framework Bill, sometimes referred to as an enabling Bill, which provides for key parts of the new regulatory regime to be established by delegated legislation and building regulations. Do you find that acceptable? Is enough tied down to get the secondary legislation done quickly enough? There is no timescale—just what is “reasonable”. Is that acceptable, or do you have any concerns?

Councillor McCoy: We have some concerns. You are right that timeliness is key. It reflects the points that I made earlier about having time for industry to gear up. There needs to be a proper, informed transition period. That is London Councils’ view. There needs to be a transition period that allows time for the capacity to be built. It needs to be fully funded, and there needs to be prioritisation within it. Obviously, we are very keen to see the safety measures implemented as soon as possible, but there needs to be a prioritisation of high-risk buildings in the meantime. That goes back to a holistic assessment of those buildings. We think that we need a transition period of about five years, and we need that clarity as soon as possible.

Andrew Bulmer: I am relatively unexercised about whether it is done through enabling legislation or written in from day one; what I am exercised about is getting the regulations delivered quickly. We are trying to prepare for the future regime. Dame Judith Hackitt called for a culture change and we, as an organisation, are driving that hard into our membership. They are receptive, and wish to adapt and move to the new regime as quickly as they can. It is difficult to prepare without the information, so I am less concerned about the mechanism; I am just concerned that we need to see the rules.

--- Later in debate ---
Ruth Cadbury Portrait Ruth Cadbury
- Hansard - - - Excerpts

Q I asked a previous witness a question about the duty to co-operate in mixed use buildings with complex ownership structures. The Government have incorporated a duty to co-operate between the different accountable people and responsible people under fire safety legislation, who can be different people in a mixed-use building. Will this suffice, or do you see problems arising?

Andrew Bulmer: I see problems arising in so far as it is complex, and I can see litigation taking place as to who is the principal accountable person. That said, I am struggling to see what a better model could be. We may have to live with the complexity.

Mike Amesbury Portrait Mike Amesbury
- Hansard - -

Q Councillor McCoy, in relation to building control and buildings below 18 metres, are there any changes you would like to see in the Bill?

Councillor McCoy: Yes, particularly in relation to the scope of buildings within the gateway scheme. At the moment, buildings that followed a permitted development are not covered by that, so we particularly want to make sure that all buildings are covered by the gateway process, otherwise a raft of buildings are out of that scope. It also needs to align with any future legislation: the planning reform White Paper contains some serious concerns for us, because it effectively puts swathes of large areas into permitted development and takes them out of the regime. The gateways have to apply to all buildings, or all new buildings.

Rachel Hopkins Portrait Rachel Hopkins (Luton South) (Lab)
- Hansard - - - Excerpts

Q This question is directed more to Andrew, and it is about residents having the ability to challenge the building safety charge. Is the Bill adequate if they want to make such a challenge?

Andrew Bulmer: The building safety charge is problematic. The fact that payment can be demanded within only 28 days will make it difficult for a leaseholder to investigate and mount a challenge. You should not challenge until you have sought further understanding. Then, if you are not happy with the information that you have, you need to mount a challenge, but 28 days is not long, so there is a problem with that.

The building safety charge itself is a flawed concept and we would like to see it gone. Running a separate service charge regime means that there will be additional tasks, which means additional costs, and it will be the leaseholders that end up paying for that. Introducing a new regime also introduces a lawyers’ charter. The existing service charge regime is decades old. For many decades we have found ourselves testing the meaning of words in different circumstances, and much of service charge law is case law. If we introduce a new regime, we restart the clock.

Also, we have an existing service charge regime, which I know is not perfect—far from it—but health and safety matters will be included in that, so we will be in a situation where the resident will receive two different bills: the building safety charge for health and safety, fire safety and structural, and then another bill for a whole service charge, which will include other health and safety works, as well as any remediation that the building safety charge regime has brought up. The consumer will be nothing but confused while paying for a more expansive and complex regime. What I would prefer to see in the Bill is the existing service charge regime finessed in a way that brings more standardisation and clarity to the consumer about what the Bill includes.