Quadruple the Manchester Piccadilly - Manchester Oxford Road Rail Corridor

In 2009, as part of the Northern Hub project, the Manchester Piccadilly - Manchester Oxford Road Rail Corridor was set to be quadrupled, with two new platforms (15/16) built at Manchester Piccadilly, yet this project has now been "postponed" indefinitely.

This petition closed on 14 May 2019 with 1,114 signatures


Reticulating Splines


In 2018, the number of trains through the existing corridor (through platforms 13/14) was increased, despite the lack of available capacity, causing constant disruption. Despite this, Transport Secretary Chris Grayling has "postponed" the project indefinitely.

The rail passengers of Manchester and the North deserve better. These new platforms are urgently needed, as the current situation is unacceptable.