Drivers’ Petition to Fully Resurface the M25 Between Junctions 10 and 11

We, the undersigned, petition the Department for Transport and Highways England to fully resurface and significantly reduce the noise levels on the M25 between Junctions 10 and 11.

This petition closed on 6 Nov 2019 with 2,185 signatures


Reticulating Splines

You may be interested in these active petitions

1. Extend the kinship care allowance pilot to all local authorities - 2,212 signatures
2. Review and update Provisions 2-10 of The Learner Travel Measure (Wales) 2008. - 2,185 signatures
3. Change rules to allow pets in airplane cabins going to and from the UK - 2,217 signatures
4. Change the DDA 1991 to stop breed bans and focus on behaviour - 6,341 signatures
5. Require drivers to stop and take cats to the vets if they hit them in their car - 10,598 signatures

This work is needed to protect the safety and health of drivers, motorcyclists and their passengers, especially those who have to use that section of motorway regularly. The concrete surface has significantly deteriorated in recent years.
There is also a separate paper petition for residents – you can sign both.


Petition Signatures over time

Constituency Data

Reticulating Splines