Question to the Department for Transport:
To ask the Secretary of State for Transport, what percentage of peak hour trains delayed between Lewisham and London terminals in each of the last 10 years were due to (a) rolling stock failure, (b) lack of drivers, (c) congestion at crossover points, (d) points failure, (e) overrunning engineering work, (f) severe weather conditions and (g) power failure; and if he will make a statement.
The Department does not hold the information requested broken down into the level of detail required and could only be obtained at disproportionate cost.