Flood Control: Tamworth

(asked on 29th January 2024) - View Source

Question to the Department for Environment, Food and Rural Affairs:

To ask the Secretary of State for Environment, Food and Rural Affairs, how much flooding response funding has been allocated to Tamworth constituency in each of the last 10 years.


Answered by
Robbie Moore Portrait
Robbie Moore
Parliamentary Under-Secretary (Department for Environment, Food and Rural Affairs)
This question was answered on 14th February 2024

In a flood situation local partners will come together to manage the response and support their communities. These will include our blue light services, the local authority and the Environment Agency as well as community members themselves. Their staff, and volunteers, play such an important role in supporting those affected, for which I am sure the hon.Member will agree they should be thanked and congratulated.

Depending on the severity of the flooding, this will usually be coordinated through the Local Resilience Forum. This is where partners will come together to will manage a response to a flood event that may have impacts on homes, infrastructure, transport links and community hubs.

Flooding can be devasting for those at risk impacted, which is why we are investing £5.2 billion in continuing to build defences that will better protect both homes and business, building on the £2.6 billion invested between 2015 and 2021 which provided better protection to 314,000 homes across England.

I am aware that during Storm Henk in January, the Polesworth gauge on the River Anker recorded its highest level, which would have been very worrying for your constituents. But I am delighted to know that investment already made in Tamworth meant that some 2,500 properties in Tamworth were protected, with only some minor surface water flooding behind defences. Many of which I am sure benefitted from the £15 million Lower Tame scheme, competed in 2015.

Following the recent storms the Environment Agency is assessing its existing defences to ensure they can continue to meet current and future needs. I know the Environment Agency is also exploring with partners the feasibility of the Tamworth Left Bank Flood Alleviation Scheme, on which, if it can go ahead, they anticipate beginning construction in late 2026 with completion expected in early 2029.

Reticulating Splines