To ask the Secretary of State for Housing, Communities and Local Government, how many building control applications made under regulation 3 or 11 of the Building (Higher-Risk Buildings Procedures) (England) Regulations 2023 were determined by the Building Safety Regulator (BSR) within the respective statutory 8 or 12 week period in March 2025.
“Complex Cases” has replaced the term for cases previously referred to as being with an Account Manager. The change in name is representative of the nature of these cases. These cases can include:
These criteria mean the application may take longer than a standard case to work to completion.
The Building Safety Regulator (BSR) can confirm that 100 Gateway Two applications were completed in March 2025, with 40 of these being determined within the 8 or 12-week statutory period.
Between 1st January 2026 and 13th April 2026 there have been 38 formal complaints raised to the BSR. Within these complaints, 8 have been upheld, and 11 have been partially upheld. Of the remainder, 11 were not upheld and 8 are still live.