Question to the Department for Work and Pensions:
To ask the Secretary of State for Work and Pensions, whether the Health and Safety Executive has been consulted by Peak Cluster Limited on the proximity of the proposed CO2 pipeline route and above-ground installation to Gawsworth Church of England Primary School.
As a statutory consultee to the Nationally Significant Infrastructure Project (NSIP) process for the Peak Cluster pipeline, the Health and Safety Executive (HSE) has responded to the Planning Inspectorate at the Environmental Impact Assessment (EIA) Stage confirming whether the proposed pipeline passes through the Consultation Distances of other major accident hazard pipelines, major hazard sites, or licensed explosives sites.
Under the Pipeline Safety Regulations 1996, as amended, the operator of a major hazard pipeline is required to produce a major accident prevention document prior to the design of the pipeline being completed, demonstrating that major accident hazard potential arising from the pipeline has been identified; evaluation of those risks has been carried out; and that an adequate safety management system for those risks is in place.