Defra can provide both a rapid indicative estimate and a longer-term definitive estimate to the question.

It will take within the region of two to four weeks’ time to produce an indicative estimate, with estimates solely based upon earth observation techniques.

It may take up to one year’s time to achieve a definitive answer, as we await the completion of field work undertaken as part of the Natural Capital Ecosystem Assessment.

The main difference between the indicative estimate and a comprehensive estimate is the ability to include smaller tree size and tributary sizes:

  • The indicative estimate would be derived from earth observation and would not include smaller trees less than 2.5m in height and would exclude smaller tributaries less than 0.5m in width.
  • The comprehensive estimate would be supported by field survey work that would include estimates for smaller trees down to 30cm in height and tributaries less than 0.5m in width.

Parochial estimates would be that possibly up to 30% of trees are less than 2.5m in height and 5% of tributaries are less than 0.5m in width.