Emergency Services Network

(asked on 22nd February 2021) - View Source

Question to the Home Office:

To ask the Secretary of State for the Home Department, with reference to extended area service sites that require a backhaul link to the main telecoms communications network to be commissioned but are otherwise ready for use, for what reason her Department has not provided (a) that backhaul link or (b) other maintenance solution that would provide access to the 4G mobile network for residents.


Answered by
Kit Malthouse Portrait
Kit Malthouse
This question was answered on 25th February 2021

The contract for connecting all 292 EAS masts to the network (backhaul link) is currently in the process of being awarded to a supplier, we expect this to be completed in Autumn 2021. After the award of this contract, we will complete the physical work to connect the mast to the network and, separately, activate the mast. Contract award for maintenance is currently at the procurement phase, we expect this to be in place when sites are ready for activation.

The installation of the backhaul link (transmission) takes place once a site has been built. The contract for transmission connections is currently in the process of being awarded to a supplier, we expect this to be completed in Autumn 2021. After the award of this contract, we will complete the physical work to install the transmission and connect the mast to the network and, separately, activate the mast.

The contract for transmission will include installation and maintenance services and is scheduled to awarded in Autumn 2021 as above.

The ordering of transmission circuits (over which the 4G services run) remain the responsibility of each commercial operator.