To ask the Secretary of State for Transport, what assessment he has made of the level of the adequacy of the funding the Office for Rail and Road has agreed with Network Rail for rail research and development in Control Period 6 from 2019 to 2024.


This question was answered on 12th July 2018

The Office of Rail and Road’s (ORR) Draft Determination for Control Period 6 represents the ORR’s draft conclusions, rather than its final position.

The ORR is consulting stakeholders on the Draft Determination until the end of August. The Government will fully set out its position in respect of the Draft Determination for England and Wales at that point.