Stratford Station

(asked on 24th March 2021) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, what steps he is taking to ensure that there are effective links between (a) the High Speed Rail One network, (b) the planned High Speed Rail Two network and (c) Stratford International station.


Answered by
Andrew Stephenson Portrait
Andrew Stephenson
Minister of State (Department of Health and Social Care)
This question was answered on 19th April 2021

The Secretary of State commissioned the HS1 Connectivity Study Report in 2015 which considered a wide range of high speed rail and conventional rail options to link High Speed 2 (HS2) with High Speed 1 (HS1) at St Pancras International and Stratford International stations. No suitable option could be identified that delivered value for money for the tax payer due to the complexity in construction, excessive costs and the level of disruption it would cause.

The Department for Transport is working with HS2 Ltd, Camden Council, Transport for London and other local stakeholders to enhance non-rail connectivity between the HS2 station at Euston and the HS1 station at St Pancras as part of the planned wider redevelopment of the Euston area.

Reticulating Splines