HMS Raleigh: Repairs and Maintenance

(asked on 24th April 2024) - View Source

Question to the Ministry of Defence:

To ask the Secretary of State for Defence, how many callouts have been made to HMS Raleigh for maintenance issues relating to (a) roofing, (b) loss of heating and hot water, (c) electrics (d) pest control and (e) damp and mould since April 2022.


Answered by
James Cartlidge Portrait
James Cartlidge
Minister of State (Ministry of Defence)
This question was answered on 1st May 2024

The total number of callouts to Service Family Accommodation at HMS Raleigh for maintenance issues relating to (a) roofing, (b) loss of heating and hot water, (c) electrics (d) pest control and (e) damp and mould since April 2022 are shown in the table below.

MOD Site

Roofing

Loss Heating & Hot Water

Electrical

Pest Control

Damp & Mould

HMS Raleigh

42

43

163

7

9

The total number of callouts that have been made to HMS Raleigh for maintenance issues relating to (a) roofing, (b) loss of heating and hot water, (c) electrics (d) pest control and (e) damp and mould since April 2022 excluding SFA, are shown in the table below.

MOD Site

Roofing

Loss Heating & Hot Water

Electrical

Pest Control

Damp & Mould

HMS Raleigh

184

637

1017

108

56

Reticulating Splines