Road Traffic Control: Kent

(asked on 18th April 2019) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, whether an environmental impact assessment was conducted prior to establishing Operation Brock.


Answered by
Jesse Norman Portrait
Jesse Norman
This question was answered on 25th April 2019

The contingency traffic management measures of Operation Brock consist of three phases: a queuing and contraflow system between junctions 8 and 9 of the M20 (Brock M20); temporary holding areas at Manston Airport; and, if necessary, temporary holding areas on the M26 (Brock M26), if capacity has been exceeded elsewhere within the Brock suite of measures.

As part of the design process of the Operation Brock measures, Highways England undertook legally required environmental screening exercises. These determined that full Environmental Impact Assessments were not required for either the Brock M20 or Brock M26 measures. The formal Notices of Determination were published in The Gazette on 24 May 2018 and 15 November 2018 respectively.

For Manston Airport, environmental and habitat assessments were carried out to inform the conditions of the Town and Country Planning (Manston Airport) Special Development Order 2019 (SDO), which was laid before Parliament on 23 January 2019.