Water Abstraction: Teddington

(asked on 1st September 2026) - View Source

Question to the Department for Environment, Food and Rural Affairs:

To ask the Secretary of State for Environment, Food and Rural Affairs, whether she has made an assessment of (a) the daily quantity of raw water that the Teddington Direct River Abstraction Scheme would supply to reservoirs for onward transport to water treatment works, and (b) what the percentage of the total daily raw water demand required by London’s water treatment plants would be supplied by the Teddington Direct River Abstraction Scheme.


Answered by
Emma Hardy Portrait
Emma Hardy
Minister of State (Department for Environment, Food and Rural Affairs)
This question was answered on 8th September 2026

The proposed Teddington Direct River Abstraction (TDRA) supplies 67Ml/d during droughts. London’s water use is just under 2000Ml/d. Therefore, TDRA contributes just over 3% of Thames Water’s total demand in London and is needed to provide drought resilience to supply.

Reticulating Splines