Doors: Fire Prevention

(asked on 10th June 2025) - View Source

Question to the Ministry of Housing, Communities and Local Government:

To ask the Secretary of State for Housing, Communities and Local Government, what assessment she has made of the potential impact of the planned transition period for moving from the fire door safety testing standard BS 476-22 to standard EN 1634-1 on timber fire door manufacturers.


Answered by
Alex Norris Portrait
Alex Norris
Parliamentary Under-Secretary (Housing, Communities and Local Government)
This question was answered on 13th June 2025

The government recognised the potential economic impact that could result from the withdrawal of testing standard BS 476-22 and the transition to the European Standard (BS EN 13501), including on timber fire door manufacturers, through the consultation response impact analysis.

In response, an extended five-year transition period was introduced for fire resistance classifications, running from 2 September 2024 to 2 September 2029. This extended period was developed in consultation with industry to allow sufficient time for retesting and certification under the new standard.

While concerns have been raised about the timing of the transition, we remain committed to the planned timeline. The Building Safety Regulator (BSR) will continue to monitor the impact of the change and support industry through the transition. BSR will keep these standards under review as part of their continuous review of Approved Document B, in line with their duty under the Building Safety Act to keep the safety and standard of building under review in England.