To ask the Secretary of State for International Development, what losses have been incurred by CDC and Globeleq on the CECA SL Heavy Fuel Oil power plant in Sierra Leone.


Answered by
James Duddridge Portrait
James Duddridge
This question was answered on 18th June 2020

The CECA SL energy project in Sierra Leone was not progressed past the preparatory stage. As a result, CDC made no investment and has not incurred any investment losses on the project. Globeleq did incur project development costs, which were written off in 2018.