Infrastructure Bill [Lords]

Geoffrey Clifton-Brown Excerpts
Monday 8th December 2014

(11 years, 2 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Stephen Williams Portrait Stephen Williams
- Hansard - - - Excerpts

I can give a cast-iron guarantee that, during the remaining three or four months of the coalition Government, there is absolutely no chance whatever of the company being privatised. As for what happens in the next Parliament, I am sure the hon. Lady is as aware as I am that no Parliament can bind another, so it will come down to the parties’ manifesto commitments.

The national road network is vital. Even though it represents only 2% of the road length, it carries 30% of all traffic and 60% of all freight and business traffic, and 90% of our constituents will use it every year. My hon. Friend the Member for Tamworth (Christopher Pincher) mentioned the M42 and quoted from G. K. Chesterton. I am sure the Minister of State will enjoy reading it in Hansard tomorrow.

Various questions were raised about the local road network, including by the shadow Minister, the hon. Member for Birmingham, Northfield (Richard Burden). A duty will be placed on the new company to co-operate, including with local authorities, and the road investment strategy will provide long-term certainty of investment and clear performance and delivery expectations. This will give local authorities greater clarity on the implications for the local road network, allowing them to prioritise their investments better. The governance and performance structure will ensure that the strategic highways company forges open and effective relationships with local bodies through their route strategies.

On the hon. Gentleman’s question about spending, I can tell him that £4.7 billion has been spent on local roads this Parliament—27% more than throughout the lifetime of the last Parliament—and we have already announced £6 billion for the period 2015-16 to 2020. He also asked, as did several other Members, about the accountability of the new company. Ministers will remain accountable to Parliament for the way roads are run, and the strategic highways company will be accountable to Ministers for delivering the road investment strategy. Oversight from the Department for Transport, the strategic roads network monitor and our new Transport Focus will ensure that those strategies are delivered.

The Chair of the Environmental Audit Committee, the hon. Member for Stoke-on-Trent North (Joan Walley), made a wide-ranging speech, but in particular she mentioned air quality. The Government obviously take their air quality responsibilities incredibly seriously, and the Bill will place a general duty on the company to consider the environment, including the impact of its operations on air quality. I am sure the report her Committee published today will inform its work.

The Government have invested £400 million this Parliament to support the market for ultra-low emission vehicles, with a further £500 million being invested through to 2020. Specifically on air quality, we have committed £100 million in the roads investment strategy to support improvements in air quality and mitigation for new schemes. I shall come to zero-carbon homes shortly, but I should mention at this juncture that one of the allowable solutions for off-site carbon abatement, across the range of possible measures, could be the development of a national network of electric car charging points—one of the barriers to the growth of low-carbon vehicles. I am sure we would all want to see that.

Further public accountability will be provided by the new watchdog mentioned by the hon. Member for Rugby (Mark Pawsey). We will be converting Passenger Focus into a new body, Transport Focus, which will better describe its reason for existence: it will now be commenting on the state of the roads as well as the modes of transport that use them.

Finally on roads, my right hon. Friend the Member for Arundel and South Downs (Nick Herbert) made an important point about whether the company should have a view to the design and aesthetics of road infrastructure. It was an entirely reasonable point, and it allows me to mention the enjoyable evening I had last night in my constituency, watching a spectacular fireworks display over the Avon gorge marking the 150th anniversary today of the opening of the Clifton suspension bridge. That bridge, designed by Isambard Kingdom Brunel, is surely the most iconic bridge not only in England or the United Kingdom, but possibly in the whole world. In the 21st century, we probably cannot aspire to the magnificent standards of the 19th century, but surely we can improve on the ugly concrete slabs that characterise our motorway network as laid down between the 1960s to the 1980s.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown (The Cotswolds) (Con)
- Hansard - -

When Brunel was building his bridge, there was no planning and no local inquiry system. If we are really serious about infrastructure in this country and if we are trying to build an extra runway in London or HS2, it will take at least five if not 10 years to get planning permission and the local inquiry through. What can the Bill do to shorten that period?

Stephen Williams Portrait Stephen Williams
- Hansard - - - Excerpts

One of its aims is indeed to streamline decision making to make sure that national infrastructure projects are built on time.

A few Members mentioned the part of the Bill that deals with invasive non-native species. Species control orders will be used to support national eradication programmes for newly arrived species in exceptional circumstances. We expect approximately only one such order to be issued a year, and we do not intend species control orders to be used where the reintroduction of former native species is undertaken legally. I hope that reassures the hon. Member for Brighton, Pavilion, who had a particular concern about the European beaver.

The shadow Minister asked about the operation of the habitats directive of the European Union. Our responsibilities under the habitats directive extend only to protecting those European-protected species whose natural range includes Great Britain. Many of the species listed in the habitats directive, such as the crested porcupine and the marsh frog, are clearly non-native to Great Britain and could be invasive. The directive allows for derogations from protection in certain circumstances, including for reasons of public health or environmental protection.

Several Members spoke in support of the deemed discharge proposals to speed up planning consents under the Bill. The deemed discharge of planning conditions is indeed a good example of where a small legislative change, as proposed in the Bill, provides far greater certainty for house builders, other planning applicants and communities. Feedback from the sector is that local planning authorities often take longer than the statutory eight-week period to reach decisions, preventing building work from starting on sites. This measure will help to ensure that local authorities hit the deadlines that they should already be working towards.

Zero-carbon homes is the part of the Bill for which my Department is responsible, and I am particularly proud that we have got to this moment. Concerns were, however, mentioned by the right hon. Member for Greenwich and Woolwich (Mr Raynsford), the hon. Member for Southampton, Test (Dr Whitehead) and my right hon. Friend the Member for Hazel Grove (Sir Andrew Stunell). The intention of clause 32 is to make sure that all new homes achieve a zero-carbon standard from 2016—either through on-site measures or off site where on-site measures are not physically possible. As my right hon. Friend mentioned, there have in fact been two tightenings of part L of the building regulations in this Parliament: one when he held my post in 2011 and one in April this year. Together, those two measures have increased by 30% the energy performance of new homes built with planning permissions after those dates.

From 2016, we want another 20% advance in the energy efficiency of new homes across the mix of housing. Those energy efficiency measures should be done on site where possible, but off site where not. There could be practical reasons why those energy efficiency measures could not be introduced on site. That is why it is necessary to provide for a scheme of allowable solutions. This incorporates a wide range of measures such as the retrofitting of older housing stock—several Members mentioned that there could be a great need for that—and there could be local or national schemes where we need to act together as a nation and not necessarily tie the allowable solutions scheme to local authorities.

Oral Answers to Questions

Geoffrey Clifton-Brown Excerpts
Thursday 4th December 2014

(11 years, 2 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Baroness McIntosh of Pickering Portrait Miss Anne McIntosh (Thirsk and Malton) (Con)
- Hansard - - - Excerpts

9. What the implications are of the Smith commission report for further discussions of devolution in the House.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown (The Cotswolds) (Con)
- Hansard - -

10. What the implications are of the Smith commission report for further discussions of devolution in the House.

Lord Hague of Richmond Portrait The First Secretary of State and Leader of the House of Commons (Mr William Hague)
- Hansard - - - Excerpts

The Government are committed to publishing draft clauses based on the Smith commission report by 25 January 2015. I will report to the House in due course on further progress in relation to the devolution of powers within the United Kingdom, and on the consequences for England.

--- Later in debate ---
Lord Hague of Richmond Portrait Mr Hague
- Hansard - - - Excerpts

It is of course important for the whole concept of the northern powerhouse to work for people throughout the north of England and for rural as well as urban areas to benefit from it. Given the locations of our constituencies, my hon. Friend and I will both be very insistent that that should happen. It is certainly possible for the whole of the north to benefit from the uplift in prosperity, skills, transport infrastructure and superfast broadband, because the Government have put together a stronger set of measures for the north of England than any other Government in recent decades.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

I am sure my right hon. Friend is well aware that my constituents are very keen on English votes for English laws. How will he implement that, and how does the Smith commission recommend that it—as well as devo-max in Scotland—should be implemented in a way that will not lead to a break-up of the Union?

Lord Hague of Richmond Portrait Mr Hague
- Hansard - - - Excerpts

The Government will shortly publish a Command Paper setting out the options for what have become known as English votes for English laws, as well as plans for further decentralisation within England. I hope to publish it before Christmas, and will seek to make a statement in the House, following which we shall all be able to consider together how to proceed with those plans.

Road Investment Strategy

Geoffrey Clifton-Brown Excerpts
Monday 1st December 2014

(11 years, 2 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I hear what my hon. Friend says. No doubt he has made representations to Philip Atkins, the leader of Staffordshire county council, because those are local highway authority roads. I will join him in making those strong representations. I agree with him that Tamworth is an excellent place to invest.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown (The Cotswolds) (Con)
- Hansard - -

I warmly thank my right hon. Friend for visiting the missing link on the A417. He therefore knows what an important economic link it is from the M4 to the M5. Will he put a bit more flesh on the bones than he did in his answers to my hon. Friends the Members for Stroud (Neil Carmichael) and for Tewkesbury (Mr Robertson)? Is it his intention to solve this problem? We have had feasibility studies for years. When does he expect work to start?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I am not sure that I can add much to the last two answers I gave on that point. There is a desire to find a solution, but it is not the easiest area to deal with. I have made a commitment to start work on it during the RIS programme so that a solution can be found in the longer term to this serious bottleneck.

Oral Answers to Questions

Geoffrey Clifton-Brown Excerpts
Thursday 23rd October 2014

(11 years, 3 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
John Bercow Portrait Mr Speaker
- Hansard - - - Excerpts

No. I am not going to call the right hon. Gentleman because Nettleton Bottom and Crickley Hill are a very long way from Newcastle. We will hear from him later, I feel sure.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown (The Cotswolds) (Con)
- Hansard - -

Nettleton Bottom happens to be in the constituency of my hon. Friend the Member for Tewkesbury (Mr Robertson) and in mine. May I therefore reinforce what my hon. Friend has so adroitly put to the Minister? The recent fatality—I send my sympathy to the family—is the eighth since this time last year. This road is in desperate need of refurbishment.

John Hayes Portrait Mr Hayes
- Hansard - - - Excerpts

I do understand that the death toll on this road is continuing to rise, and I also understand the delays that travellers are enduring as a result of congestion. I know that my hon. Friend has previously made this case, as has my hon. Friend the Member for Tewkesbury (Mr Robertson). The Department is conscious of that and of the need to do more across a whole range of roads, but he can be assured that the powerful case they have both made will not fall on deaf ears.

Oral Answers to Questions

Geoffrey Clifton-Brown Excerpts
Thursday 10th July 2014

(11 years, 7 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

This is a particularly challenging operation from both an environmental and an engineering perspective. The cost of the work has been estimated at about £255 million. It would include two junctions which would be grade separated, and the road is, of course, in an area of outstanding natural beauty. However, I have some good news for my hon. Friend: the Secretary of State plans to visit that part of the road next week.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown (The Cotswolds) (Con)
- Hansard - -

While we look forward eagerly to the Secretary of State’s visit, we look forward even more eagerly to what my hon. Friend the Minister can do to upgrade the priority of this particular scheme. This is one of the busiest arterial roads in the country: it links the M4 to the M5. Tragically, we have had five deaths since last November. This is a really important priority. What can my hon. Friend do to help?

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

It was made clear to us when we met my hon. Friend and our hon. Friend the Member for Gloucester (Richard Graham) during the winter that dealing with the problem has been in the “too difficult to do” box for too long. The phrase “missing link” is a very good way of describing this piece of road, given the congestion that it causes and, of course, its accident record, which is not good at all.

High Speed Rail (London – West Midlands) Bill

Geoffrey Clifton-Brown Excerpts
Monday 28th April 2014

(11 years, 9 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown (The Cotswolds) (Con)
- Hansard - -

Will my right hon. Friend give way?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

Well, I will give way to my hon. Friend, but this will be the last intervention for some time.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

I am delighted that my right hon. Friend wants to give way to me. Given that some of us approve of the principle of the Bill but believe that the route could be improved, will he say a little more about whether the Select Committee will have some latitude, given the instruction that it should consider only the broad alignment of the current deposited plans? Will it be able to consider matters such as the route to Heathrow?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

Scrutiny is one thing that the Bill has not been short of since it was published. The Select Committee will be given certain instructions, which will be debated tomorrow, and I am sure that my hon. Friend will have the opportunity to raise his point in that debate.

It is essential that we get this investment right. That is why I welcome Sir David Higgins’s recent report “HS2 Plus”, which took a hard look at the plans. He proposes better developments at Euston, getting services to the north sooner, integrating HS2 more effectively with the existing rail network, and working with local authorities and businesses across the midlands and the north to ensure that they get the right railway for their needs. The Government support him in all that.

It is also right that the project should be built to budget and that is an essential part of the task we have set. In his report, Sir David says that the current £21.4 billion budget for phase 1 is right, but he goes on to warn that time is money. He cannot reduce the contingency budget of around £6 billion at this stage while the legislation has not yet been passed. In short, he throws a responsibility to all of us in the House; yes, a responsibility to consider the Bill properly, but not to delay it needlessly.

Sometimes people ask why we are rushing HS2. Some people ask why on earth it is taking so long. The answer is that we are doing it properly and to the timetable set out by the last Government in 2010, so that the first services run in 2026. But the final choice lies with Parliament. Last year, we passed the paving Act, which prepared for a new high-speed route to the midlands and the north. With support from the Government and Opposition, the House voted for the Act by 350 to 34. The Bill before us today will provide the detailed authorisation. As Parliament considers the Bill for phase 1, we will prepare our proposals for phase 2, responding to the Higgins challenge to accelerate and improve it so that the most can be made of this investment—a commitment to get high-speed services to more towns and cities in the midlands and the north, and, crucially, to make sure that we get the most out of the economic opportunities it will bring.

--- Later in debate ---
Mary Creagh Portrait Mary Creagh
- Hansard - - - Excerpts

Perhaps I will break the consensus now. My right hon. Friend’s constituents will benefit from the investment in Crossrail and Thameslink, which will improve London’s transportation system. I gently say to him that his might be a slightly London-centric view. I hope that HS2 will be of benefit to every nation, region and sector of our country’s economy.

We welcome the removal of the HS1-HS2 link from the Bill, which would have caused huge disruption to Camden. Removing it will save £700 million from the budget. We also welcome David Higgins’s proposals for a coherent transport plan for the north, which has been historically underfunded, and for proper east-west rail links between Liverpool, Manchester, Leeds and Hull. Our cities must plan and are planning how to maximise the regeneration and growth opportunities around the stations.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

The hon. Member for Stoke-on-Trent South (Robert Flello) and I have formed the new all-party parliamentary group on integrated transport strategy. We are about to do a piece of work that will show that we can start building phase 2 in the north as well as phase 1. Does the hon. Lady have a view on the sequencing of the building?

Mary Creagh Portrait Mary Creagh
- Hansard - - - Excerpts

Tempting though it is to offer up my words of complete ignorance on the best way to build a railway, I will leave the matter to Sir David Higgins, who has a bit more experience in the area than me. I would certainly welcome anything that brought the benefits to the midlands and the north quicker, but he is the expert on delivering such large-scale projects.

The transport authorities must prepare to ensure that regional towns and cities reap the benefits of HS2. Railway engineering and advanced construction skills should be a national priority. We want more UK businesses, large and small, to win the large contracts. I hope that in his conclusion the Minister will tell us how he will support cities and businesses to make the most of the scheme.

--- Later in debate ---
Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown (The Cotswolds) (Con)
- Hansard - -

I am delighted, Madam Deputy Speaker, to catch your eye in this debate. Many Members wish to speak and so our time is constrained. I congratulate my right hon. Friend the Secretary of State on spending so much time in the Chamber, but having done so, I hope that he will listen to some of the concerns that have been raised, because we will have spent almost £1 billion on HS2 Ltd planning this railway by the end of this Parliament, and, as far as I can see, there have been no changes whatever from when it started to now. It seems to me that this is a visionary concept, but it could be made so much better if some of the concerns that have been raised tonight were taken on board.

My hon. Friend the Member for Calder Valley (Craig Whittaker) was right to say that we live in an increasingly interconnected world. I have just come back from China where a large number of high-speed lines have been built. It was right to do so because its environmental pollution is horrendous. This is where I start to get involved in this whole concept, because 80% of my Cotswolds constituents who travel 75 miles to Heathrow go by car. If HS2, with proper connectivity to Heathrow, were better designed, 80% of them would go by rail.

Our forefathers, almost 200 years ago, bequeathed us a visionary rail system that enabled the industrial revolution to take place, and we have the opportunity to do the same thing today. We need to get the route and the details right, which is why I formed an integrated transport group, with my hon. Friend the Member for Stockton South (James Wharton). We have done a lot of work on this subject. We have produced a comprehensive report. If any Member has insomnia one night, they might like to read it, or at least the two-page executive summary. We make a number of points in the report that are worth repeating in the short time that I have available today.

My right hon. and learned Friend the Member for Kensington (Sir Malcolm Rifkind), called in all the evidence at the last moment. HS1 was going to come in via south of London, but the route was changed and it then came in via Stratford. Had he not done that, the Olympics would never have taken place. It is a huge shame that the instructions to the Committee have taken out the HS1-HS2 link. It is still something we should consider, because passengers coming from Europe and flying into this country will want to get on an interconnected railway from this country to Europe. If there are problems with Camden, let us tunnel underneath London; let us be visionary about it, but let us ensure that we do have the HS1-HS2 link.

The hon. Member for Huddersfield (Mr Sheerman) made a very good point. I thought that I was going to disagree with everything he said in his speech, but he made one very good point towards the end, and I ask the Secretary of State to listen to this very carefully. If this railway had been a fast railway going at 300 kph rather than 360 kph, we could have varied the route very slightly, but with huge benefit, especially to the Chilterns. HS1 was built along the existing transport corridors—along the motorways and often along the existing rail links. If we had built a fast rail rather than a high-speed rail, we could have swept it out along the M40 and tunnelled under the shortest bit of the Chilterns. We would not have done any environmental degradation to the Chilterns at all.

Cheryl Gillan Portrait Mrs Gillan
- Hansard - - - Excerpts

I am grateful to my hon. Friend for giving way and for coming well behind me to defend the Chilterns. Is it not true that, in the run-up to the last election, that is the route that we believed would be adopted by any Government of whatever complexion? Imagining that they would go through the widest route of an area of outstanding natural beauty and damage it so greatly was almost beyond credibility. We were going to go through the narrowest route, and should that not have been where it went anyway?

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

My right hon. Friend is entirely right, and she has been basing her case on that. The advantage of doing that is that roads, rail, freight and air would have all coalesced into one Heathrow hub. The one thing that has not been said in this debate is that we need to be visionary about this, because 15 years ago, the latest technology, the internet, was just coming into its infancy. Who knows what technology will be available in the next 15 years?

Let us future-proof this railway as much as we possibly can. There will be all sorts of new technology to track people and suitcases and to make travel on an international scale hugely better than it is today. If we do not do that, we will already be losing business by the day because of the experience of passengers who have to go through Heathrow. If we do not get this right, we will lose even more business to the likes of Schiphol, Charles de Gaulle and Munich. The complete passenger experience, door-to-door, is what will matter. People will simply not come into Old Oak Common and take the underground for one station to get to HS1; they will fly from wherever they were coming from in the first place straight to continental Europe and further afield.

We need to consider HS1-HS2, the route and a Heathrow hub. We must think about how we will link to the world’s busiest airport. I have little doubt that when push comes to shove, Davies will come up with Heathrow as our major hub airport, yet we are not going to link the most expensive civil engineering project ever carried out in this country with our major airport. That is crazy.

I want to make two final points. First, I do not believe the case for business being sucked from the north to the south is true, which is why earlier I advocated starting equally from the north and the south if we can afford the cash. Finally, I must tell my right hon. Friend the Secretary of State that I am one of the very few chartered surveyors in this House. I know how the law on compensation for property works and the French and Germans are far more generous than we are. If he is generous with the compensation, he will have far fewer opponents to the railway line, which will be built far quicker without so many legal battles.

Oral Answers to Questions

Geoffrey Clifton-Brown Excerpts
Thursday 19th December 2013

(12 years, 1 month ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

The issue certainly focuses on skip, refuse collection and construction lorries. I have noticed that many of those I see on the streets of London as I cycle there have such mechanisms fitted. We also need to look at other types of vehicle, including the batch concrete mixers that are currently outside the regulations.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown (The Cotswolds) (Con)
- Hansard - -

T5. Mr Speaker, may I wish you and the staff of the House a happy Christmas?Following the Secretary of State’s very kind meeting with the two constituency Members of Parliament to discuss the missing link on the A417/A419 between the M4 to the M5, he asked us to establish local consensus, and we have started to do so. This week, Cotswold district council unanimously passed a motion supporting the brown route. The local enterprise partnerships are beginning to come on board, as are Members of Parliament from the wider area. Will the Minister say whether his Department is looking into the feasibility of the link?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

Following my meeting with my hon. Friend and my hon. Friends the Members for Stroud (Neil Carmichael), for Gloucester (Richard Graham) and for Tewkesbury (Mr Robertson), I am pleased that he is moving in the right direction with that consensus, and I will certainly work with him to see whether we can get the long-term answer that he desires.

--- Later in debate ---
Tom Brake Portrait Tom Brake
- Hansard - - - Excerpts

I am sure Members of the House would like to consider that proposal, but the introduction of the September sitting was to avoid the long gap between the end of July and October when the House returns. Members, I hope, will agree it is useful to have that opportunity for the House to meet, because there may be important matters that we want to discuss in September.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown (The Cotswolds) (Con)
- Hansard - -

May I endorse what the hon. Member for Cardiff West (Kevin Brennan) has just said? Would it make sense to start planning now not for next year but for the year after, so that if we considered a change in date parties would be able to change their conference arrangements?

Tom Brake Portrait Tom Brake
- Hansard - - - Excerpts

That is perhaps a matter for the parties and not within my remit. If they want to change the dates of their conferences, I suspect there would need to be all-party agreement, which might be difficult to achieve.

High Speed Rail (Preparation) Bill

Geoffrey Clifton-Brown Excerpts
Wednesday 26th June 2013

(12 years, 7 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

One of the things we are trying to do is drive out some of the subsidy in the railways to make it cheaper and more affordable for companies, but it is certainly true that there is subsidy in the rail industry. However, we have to think about people being able to get to work and what that subsidy supports. Sometimes the commuter in London, and the commuter in my hon. Friend’s constituency, deserves that support to enable him to get to the jobs that are available elsewhere. One has to be realistic and understanding about that.

I will now try to make some progress, because I have been speaking for longer than I had intended to take for my whole speech. This is not about a choice between upgrading the existing railway and building a new one. Upgrades will not provide the extra capacity we need. The choice is between a new high-speed line and a new conventional railway. The significant additional benefits make high-speed rail the right answer. Of course, big infrastructure projects are always controversial. As I often say, the easiest thing in the world for the Government to do would be not to build HS2 or to commit to it, but the costs of that would be huge.

It would be a cost in jobs. Our modest estimates indicate that HS2 will create and support 100,000 jobs, while the group of core cities predict that it will underpin 400,000 jobs, 70% of them outside London. It would be a cost in prosperity. Some estimates suggest that HS2 will add over £4 billion to the economy even before it is open. The line is estimated to provide around £50 billion in economic benefits once it is up and running. If we do not go ahead with HS2, there will also be a cost in lost opportunities for the towns and cities in the midlands and the north. I am not prepared to put up with a situation in which someone can get to Brussels on a high-speed train line, but not to Birmingham; to Strasbourg, but not to Sheffield; or to Lille, but not to Leeds. We cannot afford to leave the economic future of our great cities such as Manchester, Birmingham, Leeds, Sheffield, Nottingham and Derby to an overcrowded 200-year-old railway.

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I did say that I would not give way any more, but I shall give way to my hon. Friend.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

My right hon. Friend knows, as does the rest of the House, that much of that high-speed European railway was built with European money. How much investigation has he done with the European authorities into how much he might be able to reduce the enormous £32 billion cost of the railway?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

We will be looking at that. I will say a bit more about costs a little later, if my hon. Friend will wait. As always, we will look at how we finance, and not necessarily just in respect of the area to which he has referred. We could see private sector investment in some of the stations that we are going to develop. I will say something more about the stations in a few moments.

We will deliver the investment to develop new stations and growth at places such as Old Oak Common in west London, where we will invest more than £920 million in a new hub linking the west country, Crossrail and HS2. At Curzon Street in Birmingham, we will invest £335 million on station developments. Similar investments are due in Manchester, Leeds and other great railway centres such as Sheffield and the east midlands.

HS2 will also allow for significant improvements to the rail service on the existing main north-south lines, providing benefits for towns such as Milton Keynes, Tamworth and Lichfield. It will provide real scope to get more freight on to the railways, which I would have thought the hon. Member for Brighton, Pavilion (Caroline Lucas) would welcome. It will also free up capacity on the M1, the M6 and the M40.

My second point this afternoon is about the Bill before the House. It will authorise essential expenditure on the preparation work for high-speed rail. Planning and building the line will take time.

--- Later in debate ---
Maria Eagle Portrait Maria Eagle
- Hansard - - - Excerpts

I do not accept the hon. Gentleman’s premise that there will be no benefit to Scotland before the high-speed rail line gets there at some time in the future. It is clear that it will benefit from the project.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown (The Cotswolds) (Con)
- Hansard - -

Does the hon. Lady agree that, if we are going to spend this large amount of money on HS2, we should get the maximum benefit from it? At the moment, it is planned to connect HS2 with HS1 only by a rather tortuous single-rail route, but there is a better, double-rail solution available. Would it not make more sense to fully integrate HS1 with HS2?

Maria Eagle Portrait Maria Eagle
- Hansard - - - Excerpts

I have a great deal of sympathy for the hon. Gentleman’s point. It makes no sense to me at all that passengers from the south-east should have to change trains in north London to reach towns and cities in the midlands, the north and up to Scotland. We do not see this connection as an optional extra that can be delivered in a patch-and-mend way; it needs to be re-thought.

--- Later in debate ---
Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown (The Cotswolds) (Con)
- Hansard - -

In the light of your entreaty and decision to cut us down to four minutes, Madam Deputy Speaker, I have binned my speech.

I say to my right hon. Friend the Secretary of State that I am going to support this Bill because I believe strongly in the principle of a superb infrastructure to enable this country to be competitive in the 21st century. I hope, however, that he will regard me as a critical friend, because I think that his proposed route contains two fundamental weaknesses.

Before I talk about that, I would like to concentrate on the costs. In discussing this Bill which we are, I hope, going to pass, we need to know precisely what costs we are dealing with. My right hon. Friend has now given us two lots of costs, and I hope that he or the Minister of State will clarify exactly what those costs are. I believe that we are now talking about £42 billion for phase 1 and phase 2, plus some £9 billion for rolling stock, making a total of about £51 billion. It would be enormously helpful if he could clarify those costs.

It was not an idle intervention that I made on my right hon. Friend earlier. I do think that money should be available from Europe in the transnational networks, and I hope that he and his Department are urgently investigating that. As the hon. Member for Clwyd South (Susan Elan Jones) said, a lot of the superb high-speed rail network was funded by Europe.

In the very short time I have available, let me deal with the two fundamental flaws in the proposed route. First, it is completely wrong to have an holistic transport policy that does not link HS2 with our major hub airport. Sir Howard Davies and his airport commission will not report until after the next election, so how can it make sense to fix a route when we do not know where the hub airport will be? If, for example, he favours—I make no recommendation as to which option he should favour—an estuarial hub airport solution, the current route would be in completely the wrong place.

The other fundamental flaw in the route is that it does not properly link HS2 and HS1. Other Members have talked about this, particularly the hon. Member for West Ham (Lyn Brown). I would say to her, and to my right hon. Friend the Secretary of State, that they should look at the process that was involved with HS1. The then new Secretary of State, my right hon. and learned Friend the Member for Kensington (Sir Malcolm Rifkind), very late in the day, called in all the evidence and changed the route. That route, which had been designed by British Rail, went right through south London and was going to blight large numbers of houses, and he changed it at the very last minute. If he had not done so, Stratford International would never have come into being and the Olympics would never have taken place. I say this to my right hon. Friend: do please look at the route, because if we are spending this vast amount of money, let us, as a nation, get the maximum out of it.

I commend to my right hon. Friend a solution proposed by Ove Arup—the Heathrow hub. A Heathrow hub would produce a truly holistic transport policy integrating road, rail, freight and air. Above all, it would benefit my constituents in the west, because the newly electrified west coast main line would go into the Heathrow hub rather than having to go into Paddington and out again, as is currently the case if people want to get to Heathrow by rail. A Heathrow hub would also benefit my right hon. Friend—my good friend—the Member for Chesham and Amersham (Mrs Gillan), because the route could be altered to be taken along the M40. I ask my right hon. Friend to think about existing transport networks, as with HS1, because if HS2 is run along existing motorway links, each one cancels out the other.

I believe in this new HS2 project, which will put Britain into the forefront of competitiveness in the 21st century, but will my right hon. Friend please have a look at the route?

High Speed 2 (Heathrow)

Geoffrey Clifton-Brown Excerpts
Tuesday 17th July 2012

(13 years, 6 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown (The Cotswolds) (Con)
- Hansard - -

It is a pleasure to serve under your chairmanship, Dr McCrea, and I am delighted to see that my right hon. Friend the Minister of State is present. I am sure that she has lots of better things to do on an afternoon such as this, and it is a great pleasure to have her and other colleagues, all of whom are friends, in the debate.

There have been a number of Government announcements about rail investment over the past few days, so today’s debate is most timely. Let me state from the outset that I stand fully behind the Government’s proposed investments in our rail and high-speed rail networks. In order to allow our economy to compete with its European and global counterparts, it is vital that we have a truly world-class infrastructure.

I shall begin my remarks by discussing briefly the issue of western access to Heathrow—a matter of interest to my constituents in the Cotswolds—and I will then discuss the connectivity, or lack of, between High Speed 2 and Heathrow. It is, of course, possible for my constituents, and others in the west and south-west, to reach Heathrow by rail, but the requirement to change trains acts as a huge disincentive so people travel by road instead. For example, of the 650,000 passenger journeys from Oxford to Heathrow each year, an overwhelming number—98.9%—take place by road, rather than by rail. It is therefore important that all necessary steps are taken to encourage more people from the west of the country to access Heathrow by rail.

The creation of a spur from Reading to Heathrow will benefit those in the immediate vicinities of Reading and Slough, but for those further afield, at least one change of trains will be required. In addition to the Reading link, the creation of a new Heathrow station and a new hub with fast transport links to the main airport would provide a direct rail link to Heathrow for people in the west, south-west and Wales. Such a hub would act as a gateway to the airport, with connections by road as well as rail. A significant amount of the check-in and logistical facilities could be hosted at the new hub, allowing a complete transformation of the terminal structure at Heathrow airport. That would allow a far more efficient airport structure, with significant benefits for passengers and freight services—that is vital given that Heathrow is responsible for handling over half of the UK’s total air freight.

Given that we are in the process of electrifying the Great Western main line, we have a huge opportunity to create a fantastic rail and aviation link between the east and west of the country, with potentially huge benefits for people and businesses in the west, south-west and Wales. In my view, that goes hand in hand with the construction of HS2, which is the most costly single project ever envisaged by the Government.

John McDonnell Portrait John McDonnell (Hayes and Harlington) (Lab)
- Hansard - - - Excerpts

I apologise for intervening so early, but I may have to go to the other Chamber for a debate. Will the hon. Gentleman explain where he thinks such a hub would be located? What are his views on the best options for the hub’s location?

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

I will explain, but it was not my purpose to favour any one particular commercial option in this speech. A site is available within the vicinity of the interchange of the M25 and the M4, and there may well be others. It is a significant site of about 500 acres of largely disused land, so a possibility is available.

John McDonnell Portrait John McDonnell
- Hansard - - - Excerpts

Is that the Iver site?

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

I believe it is.

As I was saying, HS2 is the most costly single project ever envisaged by the Government, and will probably require more than the £34 billion often quoted. That figure is based largely on the assumption that 70% of HS2 users will be leisure passengers, and that seems a somewhat optimistic projection of income given that those people are price sensitive rather than time sensitive. To provide the House with a comparison, £34 billion compares with the £25 billion cost of the Trident replacement, and with the £17 billion for the Queen Elizabeth class aircraft carriers and aircraft. HS2 is, therefore, a massive capital infrastructure project.

Chris White Portrait Chris White (Warwick and Leamington) (Con)
- Hansard - - - Excerpts

I congratulate my hon. Friend on securing this debate. He talked about HS2 being phenomenally expensive, and he has mentioned that a number of assumptions have been made. Does he believe that it would be important and useful to have an independent review of HS2 and its usefulness to the economy?

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

In light of what I am about to say about the alternative hub possibility, it may be that some form of review of the whole HS2 route would be a good idea. Perhaps my hon. Friend’s concerns and my suggestions could be incorporated into one study.

In this Parliament alone we will be spending £750 million on HS2 before a spade enters the ground, with £529 million to be spent between 2012 and 2015, according to answers to my written parliamentary questions Nos. 106148 and 106541. With the greatest humility, I say to the Minister that it is vital that we get the scheme right. It is no good commencing works only to realise at a later date that we could have done something better, because by that point it will be too late to change course. The UK has lagged behind our European counterparts in the construction of a high-speed rail project, but that presents us with an opportunity to take on board what has worked previously, and learn from mistakes made in other countries. There appears to be a lack of a strategic link between our aviation and rail policies. Indeed, as the Transport Committee in its recent report on high-speed rail stated:

“The development of what could emerge as separate strategies for rail and aviation again highlights the absence of an overall transport strategy: this is a lacuna which must be filled.”

Brian H. Donohoe Portrait Mr Brian H. Donohoe (Central Ayrshire) (Lab)
- Hansard - - - Excerpts

I congratulate the hon. Gentleman on securing this important debate. On the relationship between aviation and rail, does he think that by the time the project is actually completed, there may well be a totally different set of circumstances as far as air transport is concerned?

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

I anticipated that sort of intervention, and perhaps I will cover the hon. Gentleman’s point in my speech. If I do not, I will be happy to give way to him later in the debate.

We need only look at the Netherlands, Germany and France, and at airports such as Schiphol, Frankfurt and Charles de Gaulle, to see the routeing of new high-speed lines via hub airports to create a direct interchange between air, high-speed rail, and the existing classic rail network. The purpose of linking Heathrow and HS2 is to provide an integrated rail and aviation system that would release scarce airport capacity by shifting short-haul flights to rail.

The current proposal is to build a spur from HS2 to Heathrow. However, that will not happen until the 2030s at the earliest, so at best Heathrow will not receive a high-speed rail link for around 20 years. If HS2 were linked directly to Heathrow under the proposals that I am outlining, it would receive a high-speed link soon after construction on phase 1 begins in 2026.

Another important design factor is that because the spur points only north, rail services between Heathrow and Europe would not be possible, and the potential for replacing short-haul flights will not be fully realised. We would, therefore, have to wait even longer until the spur has been extended to form a southern loop around Heathrow to connect it with HS1, but no plans are in place for that, let alone a firm budget. Again, I say with great humility to the Minister that no other country deliberately seeks to bypass its main airport in that way.

The spur is also inherently inefficient as it relies solely on airport passengers filling trains. European precedents show the benefit of having airports on a main line, thereby allowing trains to serve both city-to-city and airport passengers, like a string of pearls linking each together.

Brian H. Donohoe Portrait Mr Donohoe
- Hansard - - - Excerpts

In a previous Adjournment debate, one question was never raised although it might have solved a lot of problems. Is the hon. Gentleman aware—as a regular customer of the airport, I am—of the distances and time it takes to travel between terminals at Heathrow? As a consequence of those times and distances, a single hub railway station would not really make a lot of difference.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

The hon. Gentleman picks up a very important point. I was not going to have time to make it in my speech, but I will now answer his intervention. I believe that it would be perfectly possible to have, from the hub that I am suggesting, a relatively high-speed bus that not only takes people into a terminal at Heathrow, but takes them directly to where the aircraft are. There are all sorts of exciting possibilities to make passenger journeys an awful lot easier than they are at present.

In the “Draft Aviation Policy Framework”, published last Friday by the Government, they recognise the following:

“Rail offers opportunities for efficient and environmentally-friendly connections to airports, particularly for larger airports where passenger numbers are sufficient to justify fast and frequent services.”

Jim Shannon Portrait Jim Shannon (Strangford) (DUP)
- Hansard - - - Excerpts

I congratulate the hon. Gentleman on bringing this matter to the House. When the Civil Aviation Bill was discussed in Committee and on the Floor of the House, rail links were clearly important factors. The hon. Gentleman is outlining that case now. Does he believe that if a rail link is established along the lines that he is suggesting, that will provide an economic boost? I am thinking of, for instance, connections with the BRIC countries—Brazil, Russia, India and China—the world’s developing economies, where job opportunities come from and where contacts are made. Does he believe that there will be job creation in his constituency and other constituencies as a result?

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

That is why I think that world-class infrastructure is vital—for job creation and economic prosperity—but it is also vital, when spending these very large sums, to ensure that we have the best solution. I will go on to explain why I believe that my proposal not only is cheaper, but could be delivered quicker and will produce a better result.

As there is no airport in the UK larger and more important than Heathrow, which alone accounts for 1% of the UK’s GDP, should we not do whatever we can to improve rail links, including with the HS2 project, as I was saying to the hon. Gentleman? The Government have repeatedly stated their wish to see Heathrow become a “better, not bigger” airport, but Heathrow continues to grow in terms of the numbers of passengers using the airport. That is something that we should celebrate, frankly. However, air quality, congestion and delays are already significant issues at Heathrow and, in the case of the air quality, it is illegal. Without an integrated approach to surface access, Heathrow’s challenges can only get worse.

How would a direct link between Heathrow and HS2 help? The answer can be found in the Conservative party’s rail review, published in opposition by the Minister. Although she will not thank me for quoting it, I will nevertheless. It clearly sets out the benefits of integrating air and rail infrastructure. It states:

“Good connections to major airports…also significantly enhance the benefits of high speed rail. So a Conservative Government will support proposals…for a new Heathrow rail hub. This would link Heathrow terminals directly into the main rail network and the lines to Reading, Oxford, Bristol, Plymouth, Cardiff, Swansea, Cheltenham and Southampton, greatly improving public transport links to the airport.”

It also stated:

“The plan would also include construction of a new high speed link connecting Heathrow…to the Channel Tunnel Rail link and the new route north, providing a viable alternative to thousands of short haul flights now clogging up the airport. By freeing up landing slots, our proposal would help tackle overcrowding problems and allow more space for long haul flights, making Heathrow a much better airport, but without the environmental damage that would be caused by a third runway.”

I could not have put it better myself.

It is potentially billions of pounds cheaper to route the high-speed line via a Heathrow interchange on the Great Western main line, compared with the current proposal for the development of a series of branch lines, loops and spurs. The current costs of building HS2 from London to Birmingham, followed by a spur from HS2 to Heathrow and then a loop to rejoin the HS2 main line at Old Oak Common, is projected to be in the region of £20.5 billion to £20.7 billion. However, a connection along the lines that I am suggesting, between HS1 and HS2, connected directly to Heathrow and then on to Birmingham and further north, is projected to cost £17.5 billion, which represents a significant saving on the current proposal. That route, I believe, would be quicker to build, and the passage of the hybrid Bill through Parliament might well be easier, as there would be fewer objections.

Shifting passengers from road to rail and making Heathrow operate more efficiently by reducing passenger and aircraft overcrowding mean that the environmental impacts will be reduced. Let me give an example. Unite the Union calculates that a B747 taxiing and holding for 40 minutes on the ground—a not uncommon occurrence at Heathrow—uses as much fuel as it does at cruise altitude from the UK to New York. Of course, that not only contributes to Heathrow’s air quality failing to comply with legal limits, but increases airlines’ costs. Additionally, the relocation—the point that the hon. Member for Hayes and Harlington (John McDonnell) was making—of landside facilities outside the existing congested airport site will create more space for aircraft, allowing for more efficient operations. It is suggested that removing unnecessary ground facilities and streamlining the structures of the terminals at Heathrow could allow the creation of an additional 18% of air capacity in one fell swoop. Although that would not remove the demand for a third runway at Heathrow, it would certainly provide the breathing space necessary for the Government to undertake full consideration of the options available to them, as my hon. Friend the Member for Warwick and Leamington (Chris White) suggested.

A high-speed route via Heathrow also avoids the major environmental impacts of the current proposals on the Chilterns and west London. It would follow the example of HS1 by following motorway corridors and the shortest route through an area of outstanding natural beauty, with tunnelling below existing rail corridors where the new line passes through urban areas. The proposed route of HS2 will pass underground from Euston to Old Oak Common before moving overground through large parts of densely populated west London. The line then goes through 20.8 km of an AONB, of which 7.6 km will be above ground and the remaining 13.2 km in a tunnel.

My alternative route via Heathrow would see the entire route through west London tunnelled underneath the Great Western main line before surfacing near Heathrow. Of course, that would involve significantly more tunnelling in London than the current proposals. However, the greatest costs of tunnelling are in the initial set-up. The cost per mile of tunnelling drops as we tunnel further. That approach would greatly reduce noise and air pollution during the construction phase for very large numbers of people. It would follow the precedent set by HS1: much of the line is tunnelled under London, with only a 1-mile section approaching St Pancras overground. It would then have far less surface impact than the current HS2 route, which will pass overground through vast swathes of west London.

The line would then proceed overground to Beaconsfield in the M40 corridor before entering a 12-km tunnel through the entire width of the Chilterns AONB at its narrowest point. In other words, the impact on the Chilterns would be minimised. This tunnel not only would be shorter, but would remove almost entirely the impact of HS2 on the AONB. That might assuage the extremely vocal and well funded local opposition groups that have been set up and that are heavily involved in the judicial review proceedings against the Government in relation to the current HS2 proposals.

Directly connecting Heathrow with the UK’s regions and Europe in the first phase of high speed rail allows rail to replace both domestic and European short-haul flights, releasing vital additional capacity and resilience while linking the UK’s regions to the country’s hub airport. Improving access from the UK regions to Heathrow, our only hub, means that business links with global markets are improved, giving passengers the choice of flying via Heathrow or from regional airports.

I am sure that the hon. Member for Hayes and Harlington would agree with this. The UK is beginning to lose the aviation advantage that we have consistently had in the past by offering more flights to Asia. Heathrow is now losing out to airports such as Charles de Gaulle, Schiphol and Frankfurt, which are offering more flights to Asian destinations. The knock-on effect is that businesses—

Theresa Villiers Portrait The Minister of State, Department for Transport (Mrs Theresa Villiers)
- Hansard - - - Excerpts

That is just not true. Heathrow is one of the most successful hub airports in the world. It offers more flights to BRIC destinations; it offers more flights to China than any of its continental rivals. London is arguably the best-connected city in the world, with far more connections than equivalent cities around Europe, including connections to 360 destinations worldwide.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

With great respect to my right hon. Friend, that may be true for routes to north America, but I think that it is beginning to be—[Hon. Members: “No.”] Let us look at the figures. I think that for secondary Chinese airports, Frankfurt is beginning to overtake Heathrow. I am happy to stand corrected on that, if it is not true. The knock-on effect is that businesses are likely to locate to where the best air connections are, not only for passengers but for freight.

Are there any disadvantages to the approach I am outlining? The answer, in my view, is not really. Birmingham is as far west of London as it is north, so it is incorrect to say that a route west of HS2’s alignment is somehow taking the line out of its way. A diversion of HS2 via Heathrow will add perhaps only three minutes to journey time for trains to stop at Heathrow. I suggest that that is immaterial when set against the benefits I outline. Indeed, British Airways and HS2’s own external challenge groups confirm that, in reality, passengers do not ascribe any value to such small journey time savings, and claiming that each minute saved is worth £0.6 billion seems rather simplistic.

The direct linking of Heathrow and HS2 and improved access to Heathrow from the west would provide enormous benefits to the people and businesses in my constituency and many others to the west of Heathrow. It is, as I have said, vital, given the costs involved, that we maximise the benefits of high-speed rail.

I am fully supportive of the project in principle, and I am certainly not calling for the Government to abandon and give up on all the good work they have done so far. I would urge the Minister however to use the opportunity, before the hybrid Bill is introduced to Parliament, to pause and reflect on whether the direction we are taking, both physically and metaphorically, is the right one. If we take time to consider an integrated approach to air and rail, we can consider the entire HS2 route at the same time. We could then start construction from both north and south in order that the completion date is not extended.

Though it is obviously only one element of the HS2 project, the decreasing business case ratio for HS2, which now stands at 1.2:1, is another reason why we should examine the matter further. Indeed, as the Secretary of State’s predecessor, the now Secretary of State for Defence, my right hon. Friend the Member for Runnymede and Weybridge (Mr Hammond), said in evidence to the Select Committee on Transport:

“If it”

—the business case ratio—

“were to fall much below 1.5, I would certainly be putting it under some very close scrutiny.”

Given the importance of putting in place world-class infrastructure, it is vital that the Government retain an open mind. I look forward to hearing what my right hon. Friend the Minister has to say on the matter. I would be grateful if she agreed to meet me and other interested colleagues once Parliament has returned in September, to discuss this matter in further detail.

Not only would the hub proposal enormously improve road, rail and air connectivity, it is also a win-win: it is potentially cheaper; the disturbance and environmental pollution in densely populated areas of London is reduced; the damage to the Chilterns AONB is far less; and the connectivity to Heathrow for my constituents, businesses in the Cotswolds and others in the west, south-west and Wales is greatly improved. In short, it is the sort of strategic infrastructure investment that the UK needs to project us back towards the top echelons of global competitiveness for the duration of the 21st century.

--- Later in debate ---
Iain Stewart Portrait Iain Stewart
- Hansard - - - Excerpts

In part, I agree with the hon. Gentleman. We must look at journeys as a whole and not as individual component parts. For decades, we, as a country, have not got this right. Improvements could be made in a number of areas, from ticketing arrangements through to big capital investment. Yes, we have to do that, but I am putting forward one idea through which we might be able to achieve better connectivity. A journey from London to New York might involve taking a train for the first part of it. In Germany, such through-ticketing options do exist. The first part of the journey, for example, is on Deutsche Bahn before the passenger transfers on to Lufthansa. Although I agree with the hon. Gentleman, I am more optimistic about the potential to achieve such connectivity.

If High Speed 2 is properly connected to High Speed 1 and the channel tunnel, we will open up the option of achieving a modal shift not only in the number of domestic passengers into Heathrow but in the number of passengers travelling from Heathrow and Birmingham to the near continent, to Paris, Brussels and Amsterdam. It would require careful planning. At the moment, it is estimated that the pivotal point for making a rail journey more attractive than flying is about three and a half hours. That will probably lengthen as business travellers value properly constructed carriages that allow them to do business during the course of their journey. If we look at the total travel time involved in a journey from Birmingham to Paris, there is real potential to achieve that modal shift, which will free up more capacity for longer-haul destinations without having to resort to the radical options of new runways or a completely new airport.

Let me give a few figures. There are 1.3 million flight passengers a year going from Heathrow to Amsterdam, the same number going to Paris and Frankfurt, and 500,000 to Brussels and Dusseldorf. Therefore, significant capacity at Heathrow could be released if we get the planning right.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

There is another point in my hon. Friend’s equation. Railway stations seem to be located in the middle of city centres, whereas airports are on the outskirts of cities, and sometimes considerably so. There is always the necessity for a different type of journey to get to the airports. If we go directly from the centre of Glasgow to the centre of Paris, there may not be too much difference in time with high-speed rail.

Iain Stewart Portrait Iain Stewart
- Hansard - - - Excerpts

My hon. Friend makes a valuable point. It is not an either/or situation. The line between Frankfurt and Cologne calls at Frankfurt airport, so people have the option of going either to the city centre or to the main airport.

My hon. Friend has put forward the Heathrow hub as a specific model. I do not have any particular detailed knowledge about whether that is the correct solution, but it is one of several possibilities that should be seriously considered.

In essence, that is my point. I do not want the Minister to come back and reject the Heathrow hub or favour another option. I just urge the Government in the recess, when tempers cool down a little and there is time for a little more blue-sky strategic thinking, to use that natural pause in our strategic transport planning to assess whether we have got this matter right or whether we could make some adjustments to improve the capacity of what we have and what is already planned before we start committing ourselves to more radical options, which have all sorts of other issues surrounding them.

On that point, I will conclude and allow other Members to speak in the debate.

Robert Buckland Portrait Mr Robert Buckland (South Swindon) (Con)
- Hansard - - - Excerpts

I am very grateful, Dr McCrea, for the opportunity to speak, and I apologise in advance for not having notified you of my wish to do so. However, bearing in mind the time that we have, it is important that a wide spectrum of opinion on this issue is heard.

As you know, Dr McCrea, I represent South Swindon, which my constituents and I regard as the hub of the Great Western Railway. Swindon is very much a town that looks outwards in terms of its opportunities for growth, jobs and investment. One of the main concerns of businesses in Swindon, the town I have the honour to represent, is connectivity with Heathrow airport. In many cases, that is a more important issue for my constituents than connectivity with the centre of London, which is why the announcement last week by the Department for Transport about the creation of a western connection from Heathrow to the Great Western line was welcome news indeed. Of course, we understand that the control period is up to 2021, but a commitment of just under half a billion pounds is a significant shot in the arm for the economy that I represent. It potentially brings Swindon within 55 minutes of Heathrow airport, if the line from Reading through Maidenhead and Slough to Heathrow is constructed. Electrification would bring greater flexibility and, as my hon. Friend the Member for The Cotswolds (Geoffrey Clifton-Brown) has said, we hope to see a direct service from Swindon and the west to Heathrow airport.

However, the debate today is somewhat more long-term. It is quite a common mistake that we all fall into as politicians in failing to appreciate the amount of time that a lot of these big projects take. We must remind ourselves that the High Speed 2 project is a project that will take 15 years or longer, rather than something that deals with the here and now. Although it is always important to look at the raw facts when it comes to the current operating success of Heathrow, that does not mean that in the medium to long term that position will remain the same. It is important to remember that when we consider this debate and where we are going. We are talking about a long-term future for Heathrow and long-term connectivity and capacity. That is why it is important that the case made so strongly by my hon. Friend is considered very carefully indeed.

I accept that many different permutations and options have been put on the table in the long debate about how we connect Heathrow airport with our rail network. My hon. Friend the Member for Milton Keynes South (Iain Stewart) was careful to make that point and he is absolutely right to say that neither he nor anybody else has a particular monopoly of wisdom when it comes to the precise nature of such a scheme.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

None of us have.

Robert Buckland Portrait Mr Buckland
- Hansard - - - Excerpts

My hon. Friend says, “None of us have”, and I reinforce that message. However, it is very important for people like me to make a strong plea for the Government to look to the long term and to understand that it is only by achieving direct connectivity to airports such as Heathrow that we will acknowledge the fact that, with the exponential and welcome increase in the use of our railways, the demands upon our network will only become more stringent.

My worry is that we will be standing or sitting here in Westminster Hall in 15 years’ time, and looking back and realising that we have missed a great opportunity to rectify an historical anomaly when it comes to an airport of the significance and size of Heathrow. There it was, having been constructed in the post-war era, and it expanded to meet the huge demand placed upon it, and yet there were no direct rail links to it until many years later, when there was the link to Paddington. Now we have more development, which is welcome indeed. However, those poor rail links to Heathrow are an anomaly of history that we are duty-bound to try to rectify.

That is why it is absolutely vital that, in understanding the potential of HS2 to unlock the north, we must not forget the west. That is the plea I make today, that in any future development of HS2 priority is placed upon the need to connect the major airport for our country with the rest of England and the wider UK. Central London is, of course, an important destination, but the businesses that I represent tell me time and time again that it is Heathrow airport that is crucial to their future success. The importance of businesses’ ability to link with Heathrow should not be underestimated.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

I am sorry to keep intervening on my hon. Friends’ speeches; both my hon. Friend and my hon. Friend the Member for Milton Keynes South (Iain Stewart) have made very good points.

The reason that I called this particular debate today was that once the planning gets too far down the line—excuse the pun—and particularly when the hybrid Bill has gone through this place, it will be much more difficult to consider alternatives than it is now. Now is the time that we must urge the Minister to stand back, pause and consider whether there are any better alternatives; there may not be, but she should look to see if there are.

Robert Buckland Portrait Mr Buckland
- Hansard - - - Excerpts

I am grateful to my hon. Friend for that intervention. When I looked in detail at a map of Old Oak Common—and I am delighted that it will become an important part of this network—one thing struck me very forcibly that I had not realised before, and that is how close the Euston line runs to the Great Western Line. In fact, there is a connecting spur now that allows trains to move between the two networks.

That spur is a metaphor for the debate that we are having today. We are within an ace of getting things right in terms of judging future demand, not only for rail capacity but for the future of our principal airport. As I have said, it would be a missed opportunity, as well as a tragedy, if we were within an ace of getting things right and we then missed the opportunity that, as my hon. Friend says, the hybrid Bill presents. He is right to say that once we proceed down the line of legislation, it will become more difficult to add on various concepts or indeed to get the basic concepts right in the first place. So this debate today is timely, I welcome it and I congratulate him on securing it. I wish to add my voice on behalf of both the west of England and south Wales—let us not forget that region—and the whole growing economy and growing population that need support and proper connectivity with what will continue to be our principal airport for many years to come.

--- Later in debate ---
Theresa Villiers Portrait Mrs Villiers
- Hansard - - - Excerpts

Certainly. It takes passenger a while to get from terminal 4 to the other terminals. The hon. Gentleman is right to raise that issue about Heathrow’s current layout, and I will come to it in a moment. Despite the adversities, however, Heathrow continues to be a successful airport. I appreciate and understand the point of view of my hon. Friend the Member for The Cotswolds, but one of the fundamental drawbacks of his proposed rail hub at Iver, to support Heathrow, is that it would be more than three miles from the airport terminals. What my hon. Friend advocates would compound the problem that the hon. Member for Central Ayrshire (Mr Donohoe) has just alluded to, which is that Heathrow is already very spread out.

Returning for a moment to the environmental impact of surface access, I welcome the comments made by the hon. Member for Barrow and Furness (John Woodcock). It is important that we all focus on the environmental impact of surface access, as well on that of aviation. We are committed to working with airport operators, local authorities and local enterprise partnerships to improve surface access to our major airports across the country. Time constrains me from going into detail, but improvements are under way in Manchester and Birmingham, and Luton will get better road access and Gatwick a new station. A tremendous amount of work is under way to improve access at a number of airports.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

My right hon. Friend is making a helpful speech, but I would not like the four interventions made by the hon. Member for Central Ayrshire (Mr Donohoe) to colour the debate. With innovative solutions, it is possible for travellers, having checked their bags in at the hub that I propose—or others propose—to get in to a more rationalised Heathrow airport and on to an aeroplane via high-speed rail at considerably increased speeds.

Theresa Villiers Portrait Mrs Villiers
- Hansard - - - Excerpts

But it remains the case that among the downsides of my hon. Friend’s suggestion are the distance from the terminals, the lack of a serious proposal about how that distance will be travelled and a failure to cost the idea.

Returning to the work that is being done on rail access to Heathrow—the subject of the debate—Crossrail is now well under way, more than two decades since it was first proposed, and the tunnel boring machines have started their journey under central London. We expect the Crossrail project to provide new services that link Heathrow directly with the west end, the City and Canary Wharf for the first time. The 2010 spending review confirmed the Government’s shared commitment with the Mayor to the tube upgrade programme, which will increase the overall capacity of the London underground network by 30% and improve reliability, benefiting people travelling to Heathrow by tube.

Last week, as has been acknowledged, we announced as part of our aviation policy framework that the Government will provide funding for a new rail line to Heathrow from the Great Western main line near Slough. It would provide significantly improved connections from destinations west of the airport—a point already made—and would cut journey times from those destinations by as much as half an hour. Easier, faster and more convenient access to one of the world’s busiest and most successful airports should provide a significant boost to the economies of the Thames valley, south Wales and the west and south-west of England.

I very much welcome the enthusiasm shown by my hon. Friend the Member for Milton Keynes South about how we might seek to take advantage of the electrification and east-west rail proposals, to see if we can further improve and enhance access to Heathrow airport.

The shadow Minister asked a number of questions about the project. More work is needed to refine it and assess delivery time scales over the coming months, including the consideration of route options. The scheme remains subject to the delivery of a robust business case, and we hope to secure funding contributions from the Heathrow aviation community.

--- Later in debate ---
Theresa Villiers Portrait Mrs Villiers
- Hansard - - - Excerpts

It is inevitable, when one seeks to build a major piece of infrastructure, that it will cause anxiety in the areas in which it will have a local impact. I will come in a moment to the efforts that the Government have been making to mitigate or reduce the impact of HS2. We fully understand the anxiety felt by those in the local areas affected and by those with wider concerns about protecting the countryside, but as I have said in the House many times, I firmly believe that, with high-quality engineering and care, we can mitigate the worst effects of HS2 and emulate the success of HS1, which has been delivered without the catastrophic local impacts once predicted for it. I believe that it is possible to deliver infrastructure on that scale in a way that is fair to the local communities affected by it. The Government are determined to do all that is reasonable to ensure that we mitigate the local impact of HS2.

To pick up where I left off, the Government’s preferred option for delivering the direct connection to Heathrow is a spur running from the main HS2 line, which would allow passengers from the midlands and the north to travel directly to the airport without having to change trains. Some of my hon. Friends and colleagues, including my hon. Friends the Member for The Cotswolds and for Milton Keynes South, asked for a pause. I assure them that other options, including a direct alignment that would have taken the line to Birmingham nearer to Heathrow, were considered before deciding on the preferred route that was presented for consultation.

Further thought and analysis was carried out on direct alignment as part of the consultation and the Government’s consideration of the many thousands of responses. As I said, it was one of the most extensive consultations ever carried out, and I am confident that the outcome is the right one. I assure my hon. Friends that further scrutiny will take place when the hybrid Bill goes through Parliament.

After the consultation and analysis were completed, it was decided that a spur to Heathrow would provide the better option, and it was concluded that the proposal advocated by my hon. Friend the Member for The Cotswolds would have involved too great a journey time penalty and too much extra cost and, as I said, would not have taken the line to the airport. The site at Iver, the proposal for which he supports, is more than three miles from the airport terminals.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown
- Hansard - -

I appreciate my right hon. Friend’s sincere belief in the Government’s preferred solution rather than the option that I proposed, but I am trying to get something out of this debate. Will she carefully consider building the Heathrow spur in the first phase of HS2, so that at least the residents of Birmingham and Birmingham airport can get the benefit of that spur as soon as possible? Will she also consider the northward-facing aspect of the spur, so that at least it can be used from central London, as well as by those approaching London from the north?

Theresa Villiers Portrait Mrs Villiers
- Hansard - - - Excerpts

I will come to timing in a moment. We are enthusiastic about making progress on all aspects of HS2 as soon as we can. If we can speed up the process, we will be delighted to do so, but as I said, I will come in a moment to the timing of the next steps on phase 2 and the spur. I assure my hon. Friend that the spur is planned to have what is known as a delta junction, which could enable trains to run from Heathrow on to HS1, and possibly on to European destinations, when the spur is built.

On the timetable, the Government have asked HS2 Ltd to develop detailed route options for the spur. The plans will then be subject to detailed public consultation in 2014, alongside the rest of phase 2. If possible, we would like to make fast progress and start the consultation next year. Depending on the results of that consultation, the spur could be included in the hybrid Bill for the second phase, including the Y network.

HS2 represents a valuable opportunity to draw important strategic links between major components of our transport infrastructure. As my hon. Friend mentioned, other countries have successfully integrated high-speed rail services with their international airports. Using HS2 to improve access to the country’s major hub airport for businesses in the midlands and the north will create new opportunities for growth. Better links to Heathrow will make those regions even more attractive locations to invest and do business in, because they will benefit from Heathrow’s global reach as a successful hub airport.

As I said earlier, London has one of the most extensive aviation networks in the world, with connections to more than 360 destinations. Heathrow alone has more flights to the crucial BRIC economies than any of its rivals, including more flights to China. Airlines are expanding and covering new routes to key emerging markets. For example, British Airways recently started a new route to Seoul.

I agree with my hon. Friend and other hon. Members that we should look to HS2 to provide an attractive alternative to thousands of short-haul flights. Experience in Europe shows that where high-speed rail competes with aviation, it can capture a significant proportion of the market for journeys of up to three or even four hours. For example, Air France stopped flying between Paris and Brussels entirely when the high-speed rail link opened between the two cities, and high-speed rail in Spain led to a significant switch from domestic aviation to the train. Deutsche Bahn proposes to start direct services between London, Amsterdam and Paris, so the train could start to compete with the plane for some passengers on those routes, just as Eurostar already does on the Paris-Brussels-London route.

High-speed Rail

Geoffrey Clifton-Brown Excerpts
Tuesday 10th January 2012

(14 years, 1 month ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Justine Greening Portrait Justine Greening
- Hansard - - - Excerpts

We have reached a conclusion on phase 1, which I have announced, and we have looked at such proposals. Network Rail is now able to look at the possibilities arising from the released capacity on conventional lines. That has the potential to address some of the points that the right hon. Gentleman raised.

Geoffrey Clifton-Brown Portrait Geoffrey Clifton-Brown (The Cotswolds) (Con)
- Hansard - -

I welcome today’s announcement on an important piece of our national infrastructure. As such, will my right hon. Friend consider all of us who represent constituencies west of Heathrow and make sure that the connectivity from the west into the new network is as good as possible?

Justine Greening Portrait Justine Greening
- Hansard - - - Excerpts

Yes, I will. We are always looking at ways to improve that, and I welcome the chance to talk to my hon. Friend about it.