High Speed Rail (Crewe - Manchester) Bill Debate

Full Debate: Read Full Debate
Department: Department for Transport

High Speed Rail (Crewe - Manchester) Bill

James Davies Excerpts
James Davies Portrait Dr James Davies (Vale of Clwyd) (Con)
- Hansard - -

It is a pleasure to speak on the Bill’s Second Reading and to follow my hon. Friend the Member for Heywood and Middleton (Chris Clarkson). It goes without saying that improving connectivity across the whole UK is fundamental to the Government’s levelling-up agenda. HS2 can promote growth across the country, open up new employment opportunities and enable more efficient travel for millions, all while supporting net zero by 2050.

Even the most ardent supporters of HS2 must accept that it does not command ringing endorsement from all quarters. Many of my constituents, understandably, question its cost in particular. Personally, however, I believe that a 21st-century Britain needs a modern rail link such as is proposed. We have fallen behind our continental neighbours, making do with dated infrastructure.

The overriding reason for the development of HS2 has not been reducing journey times to and from London, but creating much-needed new capacity on a crowded network. That is important for all of us, but from the perspective of north Wales, this national infrastructure project can do more. First, in combination with Northern Powerhouse Rail, it can much improve our connections to the cities of Manchester and Liverpool and their airports, as well as beyond.

Secondly, the project can and must prompt investment in the north Wales coast main line to Crewe and Warrington. Electrifying and upgrading the north Wales main line in the manner proposed by Sir Peter Hendy in his Union connectivity review would result in fit-for-purpose regional connections and could allow through-running of HS2 trains, both southbound and northbound. All this would be transformative. It is a No. 1 priority for regional MPs and for the all-party parliamentary group on Mersey Dee North Wales, which I chair.

Matt Rodda Portrait Matt Rodda
- Hansard - - - Excerpts

One of the things that so excite me about Crossrail is that local authorities and businesses are already thinking about the next stage—about spurs off it, other uses and so on. It is wonderful to hear that the hon. Member and his colleagues are thinking about taking HS2 along the coast into north Wales. I wish him well.

James Davies Portrait Dr Davies
- Hansard - -

I thank the hon. Member for that intervention. A huge amount of work has certainly been done with the campaign organisation Growth Track 360, which is looking at that. There is an amazing graphical interpretation to be found online of how it might look, with the train passing Conwy castle; it was developed by a Ukrainian, in fact. It is fantastic.

Today, Manchester and Liverpool can be reached in just over an hour by road, on average, from Rhyl in my constituency. In comparison, existing rail services take about two hours, yet a similar distance by rail in the south-east of this country takes as little as 40 minutes.

Katherine Fletcher Portrait Katherine Fletcher
- Hansard - - - Excerpts

I have family there: my nain and taid—well, not mine, but I borrowed them—came from Rhyl. They always used to talk about the income lost to the tourism industries of the beautiful north Welsh hills because the public transport connections were not what they could be. Has my hon. Friend done any assessment of the scale of the economic improvement that could be made?

James Davies Portrait Dr Davies
- Hansard - -

Yes, work has been done by Growth Track 360 and others to look at improvements that could be made to the regional economy. Tourism, as my hon. Friend says, is right at the top. So many people in the north-west, the west midlands and further afield would visit north Wales if they could get there more quickly.

Poor regional rail services stifle economic growth, including in our vital tourism sector. They suppress efforts to reduce higher-than-average unemployment and result in just 2% of commutes to the north-west of England being made by rail, which is about 80% less than the national average.

I strongly urge the Minister to ensure that when the updated rail network enhancements pipeline is due, it includes an ambitious programme for the north Wales coast main line. Signalling improvements, line speed enhancements, infrastructure to allow express trains to overtake slow trains and capacity improvements in and around Chester station are all required to deliver that programme, as is electrification. Electrification will ultimately be required regardless, of course, to fulfil the decarbonisation agenda, but it needs to be prioritised. Placing all those improvements at the formal RNEP decision-to-develop stage now will allow north Wales and west Cheshire to properly benefit from HS2 and Northern Powerhouse Rail.

Andy Carter Portrait Andy Carter
- Hansard - - - Excerpts

My hon. Friend is making a very good speech indeed. He talks about north Wales and the north-west, but a very obvious benefit of improving the main line along the north Wales coast is that it would also improve connections to Northern Ireland, because of the ferries from Holyhead to Dublin. The opportunity to connect all parts of the UK by improving rail is critical for the north Wales coast.

James Davies Portrait Dr Davies
- Hansard - -

My hon. Friend is absolutely right, and that is what Sir Peter Hendy looked at in his Union connectivity review, which makes that point about the links across the UK, to Ireland and to the continent.

By investing in the improvements that I have outlined, we can prepare the ground to bring much of north Wales within a two-hour journey of London once the London to Crewe 2b section of HS2 is completed. Work on some elements of that agenda has already been conducted, or is due to be undertaken shortly, meaning that initial works could get under way sooner rather than later. I look forward to meeting the Chief Secretary to the Treasury shortly, alongside my colleagues in north Wales, to discuss further the soon-to-be-updated RNEP.

HS2 is an important British engineering and infrastructure project, which, like the M6, will be located in England but will benefit north Wales. There are those who say that HS2 should be considered an England-only project with Barnett consequentials arising for Wales. Journeys to and from north Wales overwhelmingly run on an east-west axis, and in my view there is absolutely no value in engaging in separatism and seeking to pretend otherwise. However, after many decades of underinvestment, the time for a significant financial commitment to the Crewe to Holyhead line has well and truly arrived. With such investment, HS2 will bring greater benefits to north Wales and thereby help to bring the Union closer together. With that in mind, I hope the Minister can give some clarity about when we might anticipate the Government’s full response to the Union connectivity review.

The inclusion in the Bill of a Crewe northern junction joining the west coast main line and HS2 north of Crewe is important for north Wales in ensuring an adequate throughput of northbound services at Crewe, and therefore sufficient connecting services for my region. I was pleased to help to lobby for this northern junction some years ago, alongside colleagues at the north Wales and Mersey Dee rail taskforce, who lead the Growth Track 360 campaign that I have mentioned. However, it is vital that funding be found for a fit-for-purpose Crewe hub station building and infrastructure, and that the design be future-proofed to allow rapid connections and HS2 through services to north Wales.

I move on to the recent announcement that the Golborne link will no longer be constructed. That brings with it potentially good news for north Wales, assuming that the route northbound via Warrington is to be upgraded accordingly. I encourage the Minister to examine that possibility carefully.

I recently met the head of public affairs for Manchester airport, Andy Clarke, who outlined to me the airport’s enthusiasm for HS2 but emphasised the need for several matters to be properly examined in the near future, including the likely impact of construction, the concern over the requirement for a local funding contribution towards the new airport HS2 station and the need to ensure that public transport links between the new station, the existing station and terminal buildings are up and running from day one. Once again, I hope the Minister will take that on board.

Graham Stringer Portrait Graham Stringer
- Hansard - - - Excerpts

On the point about Manchester airport, does the hon. Gentleman think it is discriminatory, and that it certainly does not help the levelling-up agenda, for Manchester airport to be expected to make a financial contribution to the station at the airport, when none of the other airports along the line are expected to do so?

James Davies Portrait Dr Davies
- Hansard - -

That is a valid point. I do not have the detail of other airports and the value that they are destined to derive from HS2. Clearly, Manchester international airport is a busy and successful one, and perhaps it can contribute towards the costs. It needs to be closely involved in the precise design and costings of the proposals.

This Bill will provide significant opportunities to level up across the UK, while protecting and strengthening the Union. It will also create very many well paid jobs during the construction phase and beyond. I urge the Minister to ensure that the potential opportunities for north Wales from HS2 are seized upon, in part by confirming and ensuring that the future through running of HS2 trains from Crewe on to an electrified north Wales coast main line is a serious aspiration for the Government.