Civil Nuclear Road Map

Liz Saville Roberts Excerpts
Thursday 22nd February 2024

(2 months, 2 weeks ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Damian Collins Portrait Damian Collins
- Hansard - - - Excerpts

I agree with my right hon. Friend, particularly on her point about the labour markets, and in the Sizewell area that is incredibly important. I know from Dungeness in my constituency that it is the certainty of having long-term employment that attracts some of the best talent and encourages people, including apprentices, to join the industry. The Minister will probably want to comment on the substance of my right hon. Friend’s remarks.

In the time available to me, I want focus on the site lists consultations element of the civil nuclear road map. The Government are saying that the criteria that were applied to nuclear sites in 2011 should still apply today, and in most cases that is true. Safety, access to water—where appropriate—and grid connections could all be important considerations when it is being decided where the sites could be, along with habitat implications and, in coastal areas, flood risk. All those are constants. The one factor that has completely changed since 2011 is the size of the footprint of the nuclear facility itself.

In Dungeness, an important factor has been the existence of a special protected area as a consequence of the unique shingle peninsula on which it sits, which is the second biggest in the world and a habitat that is unique in Europe, let alone the UK—the biggest shingle peninsula in the world is Cape Canaveral, in the United States. The protections are there for areas of the shingle banks that have never been disturbed. However, there are plenty of areas surrounding existing nuclear sites that are, in effect, brownfield sites where that disturbance has taken place. As they are not in special protected areas, I believe that future development would be possible.

Liz Saville Roberts Portrait Liz Saville Roberts (Dwyfor Meirionnydd) (PC)
- Hansard - -

The hon. Gentleman is advancing a powerful argument. If we are to persuade people that SMRs are suitable for use outside conventional nuclear sites, siting them in places such as Dungeness and Trawsfynydd which do not fit under the 2011 list conveys an important message. We have to be able to persuade people that small modular reactors can be used in other areas, as well as not misusing sites that might be better used for larger nuclear projects.

Damian Collins Portrait Damian Collins
- Hansard - - - Excerpts

I completely agree. I have a request to make to the Government, who will be considering the responses to the consultation on the road map. I was keen to hold this debate now, during the period of the consultation, so that Members can have their own views as well. I appreciate that it would not be easy or desirable for Great British Nuclear to make technology-by-technology recommendations for every nuclear site in the country, but there should be a recognition of footprint size. There are sites, such as Dungeness in my constituency and Sizewell in that of my right hon. Friend the Member for Suffolk Coastal (Dr Coffey), where smaller facilities could easily be built. They could be built on decommissioned land, where old power stations have been subject to advance decommissioning. They could be built on land that was used as the building works site for the construction of the existing Dungeness B station, or even on the land that is currently a car park for the existing nuclear stations.

We need to give the market some certainty that buildings of a certain size can sit within the footprint of an existing nuclear site, on land that does not have the highest levels of habitat protection, but at present that is not envisaged. What the consultation envisages is that every site on the list must be able to do everything. If there is to be no distinguishing feature between different sources of technology, we are not distinguishing between a single SMR unit and something as big as Hinkley Point C. There must clearly be some relaxation, because otherwise other sites that are currently among the eight locations on the existing list will not be included on the new list.

The industry will have an opportunity to come forward with recommendations to the Department and make a case for individual sites—but obviously without the certainty of knowing that it is believed that technologies below a certain footprint would be suitable there—and to take into account all the other important site considerations such as the local workforce, grid connections, access to water for cooling if it is required.

I think it would be much better if, following the consultation on the civil nuclear road map, we could provide certainty about the types of technology that are possible on some of the smaller sites, so that developers and businesses coming forward with those technologies would know they look with confidence at some of those sites. I think that would make a huge difference to sites such as Dungeness, which in other respects ticks every box in respect of its suitability for new nuclear. It is on the grid, it has a domestic labour market, and it has strong support from the local community. In almost every case, the existing nuclear sites are the most supportive of investments in new nuclear, because people are already familiar with the industry and know how many jobs would be created.

If the Minister could say something about this today it would be much appreciated, but I should certainly like it to feature in the Government’s response to the consultation. As I said earlier, I am not seeking site-specific information about each technology, of which there could be many more in the future, but I hope it will at least be recognised that the big difference between SMRs and reactors the size of Hinkley Point is literally that: their size. SMRs will not be suitable everywhere—in fact, they will be suitable in relatively few places—but other technologies will be suitable on a wider base. If the Government are to meet their target, they will have to do so by deeming sites that are not currently being deployed to be suitable for SMRs. We should give the industry as much backing as possible in making that investment.

--- Later in debate ---
Liz Saville Roberts Portrait Liz Saville Roberts (Dwyfor Meirionnydd) (PC)
- View Speech - Hansard - -

We have already had mention of the significance of net zero. We know that, alongside that, the demand for electricity will increase exponentially. We know, too, that energy security not just for the United Kingdom, but for the supplies of electricity that we currently receive from European countries—or the prices that they will be prepared to pay for electricity and energy—will affect what we produce here. Ireland, to the west of the United Kingdom and, very significantly, to the west of Wales, is also going through the same thought processes about its needs for electricity.

The all-party parliamentary group on nuclear energy paid a visit to Finland. Alongside the great significance of employment, which is in no way insignificant in any of our constituencies—least of all in one such as Dwyfor Meirionnydd, which is one of the lowest-paid constituencies in the UK—there are other socioeconomic drivers, which could be part of this programme and which are implicit in the road map. One of those drivers, which we have not considered in sufficient depth, is the cost of electricity in the United Kingdom.

Again, I speak for my constituency when I say that we, alongside Merseyside, pay among the highest standing charges—if not the highest standing charges—in the UK. Yet we have a tradition of generating electricity. I can think of a hydro production facility in Tanygrisiau, which is producing and feeding into the grid and goes over some of the poorest-built housing that we know of in my constituency, and certainly among the poorest-built housing in western Europe. There is a deep anomaly here. We know how much energy poverty is hitting our communities. We must be looking in future not just at the boon that comes with employment, but at the boon that comes from generating electricity. In Finland, for example, large-scale power stations pay in to real estate taxes. They pay so much that everyone else pays less. In France, people pay less for electricity when they are in the environs of a generating station. These are things that we need to consider, because as things stand we are dealing with inequality and people suffering from power poverty.

Like the hon. Member for Folkestone and Hythe (Damian Collins), I want to speak about the decommissioned power station in my constituency, but first I welcome the announcement on Wylfa. It is the policy of my party, Plaid Cymru, to support development at Wylfa and Trawsfynydd, although not at any more sites in Wales. I previously worked in further education. We saw expectations and hopes raised and then dashed in communities, which is of course what has happened at Wylfa in the past. I urge the Government to ensure that what is proposed is robust, resilient and sustainable, and that the development is brought forward. I remember a programme of apprentices who had to finish their apprenticeships elsewhere because they were no longer able to do so at Wylfa. That is very damaging. There is immense potential, but this must not be just a political boon in the run-up to a general election. These schemes matter immensely to our communities, and must not be handled lightly.

Trawsfynydd, just like Dungeness, is a site that did not find its way on to the 2011 list, for reasons that were perfectly understandable at the time, but I would strongly argue that it should be under consideration in the here and now. Why? First, I will namecheck a constituent, Rory Trappe, who, when he worked at Trawsfynydd—he was also the Prospect union rep—almost single-handedly got Trawsfynydd mentioned in the Financial Times and elsewhere as the first site for which an SMR was being considered. That raised people’s hopes in my constituency. As I mentioned, the difference that would make to salaries in an area such as Meirionnydd in Gwynedd is immense. It has been part of the Ambition North Wales growth deal as well. Public money has been allocated to Trawsfynydd, but there is now a question mark hanging over that funding.

Another advantage of the site is that we have grid connectivity. I know that for some other sites that will be a question; there will be a cost, public controversy, and issues over pylons, but at Trawsfynydd, grid connectivity exists. The site is entirely in public ownership. There is a question about the best use of public money. Trawsfynydd was not on the 2011 list because it was on a lake, rather than on the sea. It was recognised then that the site was not sufficiently supplied with water for large-scale development in the future. That comes back to an argument that I raised in my intervention: if SMRs are to be shown to be suitable on sites other than conventional sites, the Government should look at how they can show that on the ground. Again, that was one of Trawsfynydd’s original positive points.

Alongside that, the Welsh Government have invested Cwmni Egino as a development company for the site. That appears to have been disregarded in the criteria. I am sure that the criteria for GBN were very worth while, but that factor, which was unique to Wales, was not considered. I strongly urge that it now be considered. Finally, there is a mix for the area. We have a hydro-generation scheme at Maentwrog, so old that it existed even before the national grid. We also have a company called Ynni Twrog with a local scheme for energy and a scheme for community energy. It wants to engage with the profits generated from Maentwrog. I would welcome the opportunity to discuss that further, and everything else that I have raised, with the Minister.

Trawsfynydd ceased to generate over 30 years ago. The fear is about what is being proposed now. I will be told that Trawsfynydd is not off the list, and I know that other sorts of technologies will be mentioned, but they are 30 years away. That is 60 years without any generation at a publicly owned site. That is more than a professional lifetime. This is a waste of a resource. We are talking about something that would make an immense difference to the area, and to north-west Wales as a whole. I would like to know what the Minister proposes for the site. Is there a possibility of an SMR? If the Minister proposes an alternative technology, what is it? How realistic is that? Are we talking about medical isotopes as well, because that has been mooted? I have mooted it, because there is a security question over their supply. I reiterate that this is a waste of a public resource. Just like at Dungeness, we have so much that we could be making better use of. I urge the Minister to consider how best to do that.