Lords ChamberTo ask His Majesty’s Government whether the Type 45 Power Improvement Project (1) is now going to plan, and (2) is producing results that surpass expectations.
My Lords, HMS “Dauntless” has successfully completed rigorous sea trials at the end of our power improvement project conversion. The performance of HMS “Dauntless” demonstrated that the PIP design works well. The ship has now returned to Portsmouth for a scheduled maintenance period. HMS “Daring” is receiving PIP conversion at Cammell Laird, and HMS “Dragon” is receiving her conversion at HM naval base Portsmouth as part of an upkeep programme. Both projects are progressing well.
My Lords, I am delighted to ask the first Question about His Majesty’s ships in this new reign; I may possibly ask some more questions about them in future. I am delighted to hear that the work on “Dauntless” has gone so well. These are the best anti-air warfare ships in the world and it is horrifying that the power issue has been a problem for them. I only wish that they were all at sea now.
However, as we speak, a Type 23 frigate—one of 12 that we have—is looking after our exclusive economic zone assets, such as oil platforms, gas pipelines, fibreoptic cables, power cables, interconnectors and fisheries: what used to be known as the “offshore tapestry”. We have some 300,000 square miles to look after and to guard this, the Navy at the moment deploys three patrol boats. In the 1980s, we had 17 ships doing it. Does the Minister think that three patrol ships are sufficient? What work is being undertaken to review the level of protection of these incredibly important national assets on the seabed in view of the current war in Europe and the possibility of a world war?
Well, I do not completely recognise the figures that the noble Lord uses and he will know the constraint I am under in referring to specific operational activity. However, what I would say is that, as he will be aware, we always keep an eye on operational requirement, which is why we plan scheduled maintenance to make sure that we are always able to maintain the essential task that we require of the Navy.
I know that the noble Lord sometimes wears a mournful demeanour when asking me Questions at the Dispatch Box, but I think he will agree that the shipbuilding programme for the Royal Navy is very exciting. For the first time in 30 years, we are building two types of frigate simultaneously at UK yards.