Thursday 22nd February 2024

(2 months ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Paul Beresford Portrait Sir Paul Beresford (Mole Valley) (Con)
- View Speech - Hansard - - - Excerpts

I am a little cautious about rising to speak, because like other Members in the past, I have great enthusiasm and a great understanding of the need, but considerable ignorance of the physics involved, having left physics behind 30 or 40 years ago.

I have two personal links to this matter, the first being a slightly amusing one. I lived in a little place called Richmond in the north of the south island of New Zealand. Just down the road is a place called Appleby, which is even smaller. In the 1870s, the school at Appleby had four pupils. One of them was Ernest Hemingway. Sorry, it was not Ernest Hemingway. [Interruption.] It was—our nuclear man. His first invention was a potato masher for his grandmother, which I thought was quite an interesting link because, as we all know, he went on to smash the atom, as it has been put. My enthusiasm comes from recognition that we must have nuclear power in this country, even if we take into account the point about hydroelectric, but without the facilities, we cannot have it.

My second link to this matter is that a firm in my constituency, KBR, is a power in nuclear production. It welcomes this road map, but has concerns about it. I invite the Minister to have a roundtable discussion; he could bring in the key players to sit down with him and talk the whole project through. KBR’s feeling—and I sense this as well—is that we have a classic case of UK caution in this area. We had a positive response to small modular reactors in the case of Rolls-Royce and TerraPower, but we do not seem to be getting stuck in with and behind advanced modular reactors, as has already been mentioned.

Mark Tami Portrait Mark Tami (Alyn and Deeside) (Lab)
- Hansard - -

Will the hon. Member give way?

Paul Beresford Portrait Sir Paul Beresford
- Hansard - - - Excerpts

I think the right hon. Member might make this rather difficult for me because of my lack of knowledge, but I will give way.

Mark Tami Portrait Mark Tami
- Hansard - -

I promise the hon. Member that I will not. As someone who is very pro-nuclear, I believe that one big issue is that we have loads of reviews, and identify all the problems and what we will do, and then never actually do it. If we do get around to building a station, we build one—not a number of them; just one. Then, a number of years after that, we might build another one, but to a completely different design. That is how we keep going in this country. Does he agree?

Nigel Evans Portrait Mr Deputy Speaker (Mr Nigel Evans)
- Hansard - - - Excerpts

Mr Beresford, I think the name you were struggling to find was Ernest Rutherford.

--- Later in debate ---
Alan Whitehead Portrait Dr Alan Whitehead (Southampton, Test) (Lab)
- View Speech - Hansard - - - Excerpts

First, I congratulate the hon. Member for Folkestone and Hythe (Damian Collins) on securing this timely debate via the Backbench Business process. That is extraordinarily efficient, since the road map was published only on 26 January. To get a parliamentary debate in less than a month of that publication is good going indeed, so congratulations go to him.

I need to say at the outset, for the elimination of any doubt, that the Opposition consider that nuclear will play a significant role in our low-carbon economy for the future, and we therefore support its development over the future period. However, the very substantial questions that have been raised this afternoon are about what that development will consist of, how it will be organised, and what sites may or may not be available for its development, as well as a number of related issues.

It is good that we now have a nuclear road map, but I think it is fair to draw attention, as other hon. Members have done—the Chair of the Environmental Audit Committee, the right hon. Member for Ludlow (Philip Dunne), and the hon. Member for Folkestone and Hythe—to a number of the issues in the overall headline in the nuclear road map, which is that there should be a 24 GW target for nuclear development out to 2050.

By the way, contrary to the suggestion that the previous Labour Government did nothing on nuclear, in 2009 there was a nuclear national policy statement that set out the sites that should be made available for new nuclear and started the process of discussing those sites with developers. The problem is that since then, yes, there was a revised EN-6 national policy statement, but not a single electron of nuclear power has appeared between 2009 and the present. We are talking about a target for the future in the context of serious delays as far as nuclear is concerned.

Yes, we must talk about that target and what the energy mix will consist of for the future, but we must also talk about whether those things will materialise in the way envisaged, and about how we can overcome the substantial delays that seem to be baked in to the process of nuclear development. It is not clear whether that target will largely be filled by gigawatt-sized plants or by small modular reactors and advanced modular reactors. It is not clear what consideration should or will be given to the mix of nuclear, as it will sit in what will be a very different power mix from hitherto. What planning will be undertaken to ensure that such a mix will be optimal, given the need to have power systems that can act compatibly with other forms of power?

The road map commits to at least one gigawatt power station in addition to those under way at the moment, but as we have heard this afternoon, substantial delays in existing large nuclear plants are the order of the day. Hinkley is now 10 years delayed, Sizewell C does not yet have financial closure, and it does not look as though there will be any power from that until the early 2030s. The good news is that Sizewell B is likely to have a 20-year extension on its life. It is currently due to close in 2035, so that will be effectively the equivalent of a new large power station generating in the late 2030s onwards.

So far the Government have put £2.5 billion into Sizewell C and not one stone has yet been laid on another. I imagine there would be a need in principle for similar sums to be laid before future gigawatt nuclear power plants, if that is what the Government envisage for their 24-gigawatt strategy in the main. It is not indicated on the road map whether the Government are able or prepared to do that. Indeed, the money that has already been put into Sizewell was not planned.

On the other hand, while we are having a competition to determine what support, if any, should be given to the winner of the competition for SMR developments, an agreement in principle has been reached to build four SMRs on Teesside at no cost to the public purse, by the American company Westinghouse Electric Company, and Community Nuclear Power. It at least appears—competition or no competition—that there may be circumstances in which, at no cost to the public purse, nuclear power in the shape of SMRs can come forward. That is another reason why the competition needs to go ahead as quickly as possible, to get what we are doing in the UK as up to speed as possible with what people are doing elsewhere in the world.

What the agreement that has been reached in Teesside currently lacks is a clear route forward about sites. That is a proper subject for another delayed action, which, as mentioned in the road map, is the updating of strategic planning statements concerning nuclear. The last such statement, a revised EN-6, was published and adopted in 2011, and it identified, as the 2009 document had done, a number of specific sites for gigawatt power stations. However, it runs only until 2025. Indeed, a number of those sites were initially earmarked for nuclear plants, but the consortia advancing them withdrew.

We are now in a different age. The priority now is surely to identify sites, or at least to put in place clear conditions under which SMRs in particular might go ahead. I see from the road map that an intention for the development of an updated EN-7 appears to be that it will establish clear criteria for such sites. That is of course delayed, as with so many things related to nuclear planning and action. It is not with us at the moment, but it should be. I hope the Minister will give us a firm indication of when it will be published and adopted by this House.

An area where we have had delays and prevarication in the past is nuclear fuels. I am pleased to see in the road map a firm commitment to support the development of new forms of nuclear fuel and support for the production of existing fuel, such as high-assay low-enriched uranium, which at present is available only from Russian sources. Securing those fuel developments for Springfields nuclear fuels and establishing the funding that will make it work is an important piece of work under way early in the path of the road map, and I see the Minister has already laid a revised designation for Springfields in respect of enabling new uranium conversion facilities to be developed. All of that is a good piece of work by the Minister, and he should be applauded for it.

On the subject of delays, one of the most egregious is the absence of any progress on the identification and establishment of a nuclear repository. In the words of the road map:

“A process is well underway to identify a suitable site in which to develop a GDF”—

a geological disposal facility—

“that has suitable geology and the support of a local community.”

Those words vary little in content from the original White Paper in 2008 that stated that such a process was to get under way.

Mark Tami Portrait Mark Tami
- Hansard - -

I have been to Finland and seen its waste repository. It is not rocket science—it is not that difficult. We have put this off for years and years. The argument always used against the industry is, “There is no answer to the waste.” Well, there is an answer, and it is straight- forward. We just need to make that decision.

Alan Whitehead Portrait Dr Whitehead
- Hansard - - - Excerpts

My right hon. Friend has more or less written the rest of my speech for me. He is right that it is not rocket science; it is nuclear science. And it is pretty straightforward, essentially.

By the way, the White Paper under the previous Labour Government said in 2008 that the process should get under way rapidly, with community consent, and that a geological disposal facility should follow shortly after. Nothing has happened since then, but it is vital, as we contemplate the kind of programme that we are envisaging for nuclear and the decommissioning of all but one of our current nuclear fleet, that a storage facility gets under way. We need rather more in the road map than the sparse words right now, or we at least need a renewed specific pathway for a disposal facility to be published. I would be interested to hear from the Minister whether he is positively inclined towards that idea and whether he appreciates the urgency of making progress on a secure geological disposal facility.

Andrew Bowie Portrait The Parliamentary Under-Secretary of State for Energy Security and Net Zero (Andrew Bowie)
- View Speech - Hansard - - - Excerpts

It is a pleasure to see you in the Chair this afternoon, Madam Deputy Speaker. I commend my hon. Friend the Member for Folkestone and Hythe (Damian Collins) on securing this important debate, and on the speed at which he was able to secure it, given that it was only a month and a half ago that I was standing at this Dispatch Box and publishing the nuclear road map. He is absolutely right to seize the opportunity presented in the civil nuclear road map, and I commend him for his consistent efforts on this agenda and for championing his constituency. I was grateful to visit Dungeness last year with my hon. Friend. I saw the strong local support for that site as a potential future location for a small modular reactor. I very much enjoyed my trip to the local pub and the fish and chips—should that be fission chips?—that we were served following our visit to the reactor.

The UK already delivers high-quality apprenticeships in the nuclear sector. We recognise the need to increase the number of apprentices to ensure that the nuclear sector can keep up with demand, without compromising the quality of training or career opportunities. The value of energy generation to communities around the country is an essential part of the discussion.

A month on from the publication of the civil nuclear road map, I am pleased to be discussing it here today. The Government are focused on creating a stable, secure and clean energy supply for the country. The publication of the road map sets out plans for the great nuclear revival of this country. As my right hon. Friend the Member for Ludlow (Philip Dunne), who has been a consistent champion of this, pointed out, nuclear plays a key role in our drive towards net zero. That has been recognised not only by this country but at COP by 30 other countries around the world, who came together to pledge to increase their nuclear generating capacity by 30% so that we can take concrete action on the biggest challenge of our time, which we all agree is climate change.

Nuclear power generation is a low-carbon, proven technology that will play an important role in making our energy system more resilient and less polluting. We have set out this expansion with quantifiable aims. We want to achieve up to 24 GW of nuclear power generation by 2050, which is four times what we currently produce. That ambition will require us to deploy a range of technologies from large-scale gigawatt reactors to small modular reactors and, coming down the stream, advanced modular reactors. On the first of those technologies, I am pleased to say that we are making incredibly good progress. Since the subject was last raised in the House on 11 January, the Government have made available a further £1.3 billion for the construction of Sizewell C. That brings the total Government investment available for the project to £2.5 billion.

Beyond Sizewell, we have committed to a pragmatic approach to nuclear deployment. As set out in the road map, that means committing to explore a further large-scale nuclear project beyond Sizewell. [Interruption.] I will not give way. I will address the comments made in the debate further on in my speech. I am conscious that we have another debate to get to, and I do not want to take up any more time for that debate; we are already eating into it.

On SMRs, we have set up Great British Nuclear, an arm’s length body responsible for helping to deliver new nuclear projects. In 2023, GBN launched a technology selection process for SMRs—it has been referenced—with the aim of identifying the technologies best able to reach a project final investment decision in the next Parliament, potentially releasing billions of pounds of private and public investment. In October, Great British Nuclear announced the designs of six technology vendors it had selected to proceed to the next stage of the process. I assure right hon. and hon. Members that the next stage of the competitive selection process will be launched shortly. The ambition is to announce this year which of the six companies the Government will support.

Importantly, whatever the technology, the nuclear programme requires new sites to enable construction within the decade. The Government’s plans, published last January, set out how we will achieve the expansion in the coming years. My hon. Friend the Member for Folkstone and Hythe will know from the road map that, in order to reach our destination of up to 24 GW by 2050, we have proposed a new approach to siting nuclear power stations, which will empower developers to identify sustainable sites.

The current national policy statement for siting nuclear power stations deployable before the end of 2025 lists potential locations for nuclear sites. Our new national policy statement for beyond 2025 aims to enable developers to identify sites that best match their technology. To open up more siting opportunities and facilitate longer-term market development, an updated, robust site assessment criteria will ensure that only those sites that are suitable for a new nuclear programme progress through the planning system.

While I am afraid that we cannot today speculate on the location of these new nuclear sites, we will pave the way for new nuclear sites in the UK to be made possible by this new nuclear siting national policy statement and civil nuclear road map. I suggest to my hon. Friend and any others who are rightly looking to the job creation and economic benefits of new nuclear sites that my Department shares their eagerness to confirm these projects, and we will share news of them as our consultation progresses.

I know that red tape and over-cautious regulation have slowed the progress of many construction projects in this country. However, I urge that cautious planning and adherence to correct procedure are a necessity when, after all, we are here discussing nuclear power. This is a slow process, because it is a diligent one, and it should be a diligent one. I will not make any promises today about the location of new nuclear sites, but my hon. Friend and others can be certain that community engagement will be central to the development of any new sites, and my Department is working to deliver that.

My hon. Friend the Member for Mole Valley (Sir Paul Beresford) talked about new technologies. In January, I launched the alternative routes to market for new nuclear projects consultation, which aims to explore what steps can be taken to enable different routes to market for advanced nuclear technology and the uses and potential benefits they can provide to the UK economy when they do not need the support of the British taxpayer. The consultation will end on 12 April, and we are seeking responses to support the development of policies that will allow the nuclear industry to thrive. Expanding our nuclear power generation will benefit every community in the country with clean, reliable power, but it is the communities that host these new nuclear sites that will see that benefit most directly.

The skilled workforces that exist around our existing nuclear sites will, I expect, be an important consideration for those looking to develop new nuclear reactors. We expect that the nuclear sector workforce in the UK will need to double in the next few decades in response to the challenge. We recognise that we cannot close the skills gap without urgent collaborative action. We have worked with the Ministry of Defence and will soon launch the nuclear skills taskforce, of which I am incredibly proud. It will set out the action needed to ensure that the UK’s nuclear sector will have sufficient and appropriate nuclear skills to deliver our civil and military nuclear ambitions.

Mark Tami Portrait Mark Tami
- Hansard - -

Will the Minister give way?

Andrew Bowie Portrait Andrew Bowie
- Hansard - - - Excerpts

I will not, because I do not want to eat into the time for the next debate. The taskforce will set out our aims and ambition, and the work involves close co-ordination with industry, across civil and military, to turbocharge the work already happening to develop the skills we need. We look forward to seeing the taskforce’s final recommendations very soon.

Right hon. and hon. Members raised extensive points about the road map. I have been advised that we want to give time for the next debate, so I will not be able to address them all today. However, I promised the hon. Member for Kilmarnock and Loudoun (Alan Brown) that I would come back to his points on Hinkley Point C and Sizewell. Hinkley Point C is not a Government project. EDF Energy is responsible for its delivery. Additional costs will not fall to the taxpayer, despite what hon. Members might read in the press.

Sizewell C will be a crucial part of the UK’s agenda for new nuclear power. As I said, we have made available a total of £2.5 billion to support the project’s development. Last year, the Government and Sizewell C started the process to bring in private equity, backed by our new regulated asset base model for nuclear, in which we have considerable confidence. The hon. Member claimed that the RAB would not deliver. It was established as an option for funding new projects, following recommendations by the National Audit Office. The most appropriate funding models will be determined by negotiations with project developers on a project-by-project basis. As I said, we have full confidence in that.

I will write to the other Members who took part in this debate to address their points, because important points were raised, but I do not want to eat any more into the time for the next debate. We have published three key documents, which reinforce the UK’s position as a leader in the civil nuclear renaissance: a civil nuclear road map, a consultation on alternative routes to market, and a consultation on proposed policy for siting new nuclear power stations. The UK needs to increase the resilience of its energy supply while reducing its emissions. For that reason, nuclear power is a source of real optimism. The continued work of my Department and Great British Nuclear will ensure that the UK has a world-leading nuclear power industry. I am very glad to work with my hon. Friend the Member for Folkestone and Hythe as we turn this plan into a reality.