Heathrow Airport Expansion

Tanmanjeet Singh Dhesi Excerpts
Wednesday 24th May 2023

(11 months, 2 weeks ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- Hansard - -

I am grateful to my hon. Friend for securing today’s important debate on Heathrow airport expansion. No talk of expansion can be complete without first addressing the surface access requirements to decongest the roads around Heathrow and to improve the environment. More than a decade ago, the Government committed to building the western rail link to Heathrow. The successful business case was predicated on a two-runway scenario. A third runway, if it was built, would make the scheme critical; however, not a single spade has been dug into the ground. Does my hon. Friend agree that this No. 1 infrastructure priority for the Thames valley region, which has the support of the Welsh Government and others in the south and west—including in my Slough constituency—must finally be built without further procrastination by the Government?

Fleur Anderson Portrait Fleur Anderson
- Hansard - - - Excerpts

I thank my hon. Friend for his helpful intervention. An expanded Heathrow would see an additional 175,000 trips every day. That is more than the daily rail arrivals to the whole of Birmingham, yet the proposal does not have a plan for how to deal with it. I shall say more on that later. My hon. Friend is absolutely right.

What about green aviation? We are told that green aviation and green tech will catch up. Are we close to the breakthrough in alternative fuels, carbon capture or battery-powered planes that would make an expanded Heathrow sustainable and viable? No, we are not. In 2010, the aviation industry pledged to source 10% of its fuels from sustainable sources by 2020. We are in 2023; how is that going? Only 0.05% are sustainable fuels. There are no electric aircraft currently in development that could be commercially viable for long-haul flights. The green aviation revolution that could make the Heathrow expansion environmentally viable is a long way from taking off.

So what is the case against? I will talk about climate change, air quality, noise and transport. First, on climate change, the expansion is fundamentally incompatible with the Government’s own net zero target. Heathrow is the largest single polluter in the UK. Its emissions account for half of all UK aviation emissions. Its expansion proposals of 260,000 additional flights a year, on top of the existing 480,000, will increase carbon dioxide emissions from air travel by a staggering 9 million tonnes a year. As I said, that is more than the entire carbon emissions of Luxembourg.

The Government recently published their jet zero strategy; is that the answer? No. The strategy makes no attempt to set out what share of the transport carbon budget the aviation sector should be allocated or how that would be divided between airports, and it fails to articulate circumstances in which airport expansions could be compatible with climate change targets. Heathrow is just one of many airports across the UK with ambitions to expand, yet the Government has no overarching framework to guide airport expansion plans throughout the country.

Oral Answers to Questions

Tanmanjeet Singh Dhesi Excerpts
Thursday 20th April 2023

(1 year ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Lindsay Hoyle Portrait Mr Speaker
- Hansard - - - Excerpts

I call the shadow Minister.

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- View Speech - Hansard - -

When it comes to railway reform, the Conservative Government seem to know only two approaches—hike up fares and cut railways back to the bone. They are not content with slashing services, cancelling investment and reducing reliability: a leaked Network Rail report reveals that the Government want to cut funding to such a dangerous level that it will be unable to “operate, maintain and renew” tracks and bridges. On top of that, a £3 billion risk fund to help in emergencies such as severe weather will also be cut. Fewer repairs mean more obstructions, risking more delays and accidents and more compensation to private operators. Why are Ministers so passionately committed to making our railways less reliable and ever more expensive? Have the public not suffered enough already?

Mark Harper Portrait Mr Harper
- View Speech - Hansard - - - Excerpts

That was an extraordinary question, containing not a single fact. The Government have provided a record £44.1 billion settlement for Network Rail in control period 7—in English, that is between April 2024 to March 2029. Compared with the previous control period, that is a 4% increase in real terms when compared on a like-for-like basis, and an above-inflation settlement during a highly challenging fiscal environment. That demonstrates our continued commitment to running and maintaining vital railway infrastructure.

Oral Answers to Questions

Tanmanjeet Singh Dhesi Excerpts
Thursday 2nd March 2023

(1 year, 2 months ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- View Speech - Hansard - -

First, may I pay my respects following the tragic rail crash in Greece? I am sure that the thoughts and prayers of the whole House will be with our Greek friends.

Last year, the Minister oversaw timetable changes on Southeastern routes, but the Government refused to consult on those changes because they did not want to listen to passengers. In a parliamentary debate in December, secured by my hon. Friend the Member for Eltham (Clive Efford), I and indeed hon. Members from across the House warned the Minister that the upcoming changes and cancellations of Southeastern routes would be bad for passengers and would lead to overcrowding, but he did not listen. Now that these changes have caused the predictable chaos he was warned about, will the Minister finally listen and end the misery this Government are inflicting upon Southeastern passengers?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - - - Excerpts

That is patently not the case, because during that debate I made it quite clear that consultations would be better than they had been. I also made it quite clear that I would listen and, if the case were made to change the timetable, I would do so. This morning—obviously, earlier than the lines that have been written—we announced that these changes had been made. In fact, the very first individuals to be made aware of that were the MPs. They have had that information first; it is important to me that they receive that information first. We will continue to listen and learn. We had to make savings on Southeastern, and £10 million was taken off. The savings are because season tickets collapsed to 32% of pre-covid levels. If the hon. Member is pledging to fund the railway no matter what and make no changes—

Electric Vehicles: Infrastructure

Tanmanjeet Singh Dhesi Excerpts
Wednesday 22nd February 2023

(1 year, 2 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- Hansard - -

It is a pleasure to serve under your chairmanship, Mr Bone. I congratulate the hon. Member for Winchester (Steve Brine) on securing this debate on electric vehicle infrastructure cost and availability, and thank him for providing an opportunity to draw attention to this vital issue. Climate change presents one of the biggest threats and greatest challenges facing humanity. However, the greatest barrier to progress today is not climate denial, but climate delay. We are at a critical juncture in our journey to legally binding net zero targets. Now is the time for bold and ambitious policy that will unleash the huge opportunities that the transition offers, but that is a far cry from the reality under this Government.

Tahir Ali Portrait Tahir Ali
- Hansard - - - Excerpts

Does my hon. Friend agree that so much has been promised by Government on this issue, but in so many constituencies—including my constituency of Birmingham, Hall Green—people are missing out on being part of delivering the climate change agenda? When will the Government deliver on those promises by delivering EV charging points for many households?

Tanmanjeet Singh Dhesi Portrait Mr Dhesi
- Hansard - -

I thank my hon. Friend, who is an amazing champion for his constituents. I could not agree with him more. In fact, I will be delving into that very topic —regional disparity—later in my speech.

As the largest emitting sector in respect of greenhouse gas emissions, transport has a crucial role to play in getting to net zero. In 2020, transport accounted for almost a quarter of total emissions, at a time when the pandemic meant that domestic travel was at just a fraction of usual levels. Petrol car journeys produce similar emissions per capita to aeroplanes—that is a startling fact—and over three times more than electric cars. Therefore, ramping up the transition to EVs is imperative if we are to meet our climate goals. But the roll-out of electric vehicles is only as good as the roll-out of the charging infrastructure supporting it. There is no time to lose, as the EV enthusiast, the hon. Member for South West Bedfordshire (Andrew Selous), explained, along with pointing out the VAT anomaly for charging outside one’s house. It is of course true that most drivers charge their EVs at home, but even those with home chargers need to be able to rely on a nationwide charging network, or they will be held back by range anxiety. In addition, we must not forget the estimated one third of households without access to off-street parking. They must not be left behind. Charging at home or a workplace has a huge role to play, but it is no alternative to a truly nationwide and reliable public charging network.

This Government are asleep at the wheel while the UK falls behind on the infrastructure that motorists need. The hon. Member for North Antrim (Ian Paisley) highlighted, as did the SNP spokesperson, the hon. Member for Paisley and Renfrewshire North (Gavin Newlands), that areas such as Northern Ireland are being failed and left behind. My hon. Friend the Member for Warwick and Leamington (Matt Western), the chair of the all-party parliamentary group, highlighted how we are falling further and further behind our European neighbours.

As my hon. Friend the Member for Bristol East (Kerry McCarthy) eloquently highlighted—in a very powerful speech, because she speaks with a great deal of experience on this matter—we need to install 37,000 charging devices a year to meet the Government’s own target of 300,000 by 2030. However, last year we achieved just a quarter of that. At the current pace, Ministers will miss their own target by a staggering 20 years. There are now 30 electric vehicles for every charging device, compared with 16 at the start of 2020. Motoring groups have been calling for a mandate on the installation of charging devices, to complement the upcoming net zero emission vehicle mandate. Motorists and manufacturers alike are crying out for clarity on the timescale for the transition to electric cars and charging infrastructure. Will the Minister consider targets in this area? I look forward to hearing his views on that.

Furthermore, the public charging devices that are available are highly concentrated in London, at the expense of the north and other areas of our country. There are now more public charging devices in Westminster alone than in 11 of the biggest northern cities combined, and this gap is stretching out wider still. Over the last three months, for example, more devices have been installed in Westminster than in any English region outside London. While this Government sit on their hands, the regional divide continues to get worse and worse. If the Government do not get a grip on this, those in more rural and less affluent areas are destined to be excluded from this transition, as was ably demonstrated by the hon. Members for Caithness, Sutherland and Easter Ross (Jamie Stone) and for Bath (Wera Hobhouse).

Even when motorists are able to find a charging device, all too often they find out that it is too expensive, complicated to use, or not even working. Research carried out by the RAC showed that the cost of rapid charging on the public network rose by 50% in the eight months up to January 2023. Indeed, the AA has warned that the cost of public charging could become comparable to high-emission alternatives. That should be a huge cause for concern. Cheaper running costs are a major selling point for switching to electric vehicles. To lose that means risking the transition.

Turning to consumer experience, many have called for stronger regulation to standardise payment methods, and set minimum standards, so that public charging is as simple as filling up a petrol tank. It is unacceptable that many charging devices do not accept contactless card payments and force users to download an app or carry multiple membership cards. I can attest to that from my own experiences of driving my electric car. That would not be tolerated in any other industry and puts up yet another barrier to the transition.

In addition, all too often charging devices are not acceptable for people with disabilities. That must urgently be addressed, if we are to achieve a just transition. We welcome commitments made in the EV infrastructure strategy for new consumer experience regulations. In particular, it is vital that proposals for a 99% uptime requirement are followed through. Will the Minister confirm that those commitments will be delivered in full, and that there will be no scaling back? Will he also provide a timescale for their implementation? It is imperative that these crucial steps are not watered down or kicked into the long grass.

On funding, will the Minister take this opportunity to announce when the local electric vehicle infrastructure scheme will be up and running? Many local authorities are awaiting this funding to get their own roll-out going, particularly in areas where the business case for the private sector is weak. When will the rapid charge fund, first announced years ago, finally be delivered?

More widely, there are a number of other factors threatening an effective transition to EVs. As my hon. Friends the Member for Ellesmere Port and Neston (Justin Madders) and the Member for Luton South (Rachel Hopkins) rightly lamented, car manufacturers are being left in limbo by the lack of clarity from the Government on their zero-emission vehicle mandate. The mandate will come into force in less than a year, but 11 months out we are still waiting for details on what the mandate will be and what penalties it will carry. That uncertainty is adding to the challenges facing the car industry. Will the Minister confirm when the Government will finally respond to the ZEV mandate consultation? Delay after delay and a lack of clarity risk stalling the transition to electric, and reversing the momentum built up behind it. Manufacturers and motorists need confidence in a reliable, affordable and accessible nationwide network of charging infrastructure.

Labour stands ready to turbocharge the electric vehicle roll-out. A Labour Government will support new gigafactories, leveraging private sector investment and creating thousands of British jobs. We will offer interest-free loans for new and used EVs, to those on low and middle incomes. We will support a truly nationwide and accessible charging network, so that range anxiety is ended everywhere and for everyone. We stand on the precipice of a major change to the way people drive. In under seven years, the sale of new purely petrol and diesel cars will end. Motorists and manufacturers are ready to make the switch, but they need a Government who are ready to make the switch. This Government have failed to rise to the challenge. Labour has a plan, and a Labour Government will deliver on that plan.

Restoring Your Railway Fund

Tanmanjeet Singh Dhesi Excerpts
Tuesday 24th January 2023

(1 year, 3 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- Hansard - -

It is a pleasure to serve under your chairship again, Mrs Cummins. I congratulate the hon. Member for Torbay (Kevin Foster) on securing this important debate on the restoring your railway fund via the Backbench Business Committee. I commend all the hon. Members who have spoken so passionately on behalf of their constituents about exactly why their areas deserve funding for railway lines and how that would help to boost local economies and reinvigorate local communities.

The restoring your railway scheme has noble aims of connecting long-neglected towns and villages to the railways and investing in local infrastructure. Indeed, successful bids can deliver real opportunities for locals. However, the scheme’s execution, just like that of the so-called levelling-up funding across our nation, has been a competitive, chaotic and careless mess. Sadly, the reality of the scheme is that it barely scratches the surface. I commend the principle of expanding our network, but the fund fails to tackle the major issues that affect UK rail. It lacks vision, coherence and a long-term plan. The restoring your railway fund seems to be an apt metaphor for this Conservative Government.

The reality facing passengers is that train services are later, less frequent and more expensive than ever. Piecemeal extensions of lines and renovations of stations provide a select few with improved services, but without a comprehensive transport plan or vision, I fear that the projects will not reach their full potential. The Government are failing to deliver even this paltry offering. When £500 million was allocated to the scheme in January 2020, the then Transport Secretary, the right hon. Member for Welwyn Hatfield (Grant Shapps), stated that delivering it would ensure that, after the Beeching cuts,

“more than half a century of isolation is undone.”

However, just last week, the current rail Minister told the Transport Committee that we should manage our expectations, and noted that it is unlikely that the Government will be able to deliver most of the funding bids. Will the Minister clarify which schemes are at risk? The scheme looks like another perfect example of this Conservative Government over-promising and under-delivering.

Instead of slapdash spending and flashy competitions, our railways need a proper long-term strategy and leadership. We need proper investment. The Government’s strategy is equivalent to keeping their fingers crossed and hoping for the best. Perhaps that is their calling card, given their shambolic handling of the recent rail strikes. The future of our transport is too important to leave to chance. Under this Government, there is little comprehensive strategy. They have demonstrated that clearly with Great British Railways. Since its launch, we have been told that GBR will revitalise our railways, improve our services and advance our infrastructure, but what do we hear from the Government today? Absolutely nothing. After all this time, we have not even heard where the organisation might be based, and Ministers have admitted that there is no prospect of any GBR legislation in the transport Bill in this parliamentary Session.

What about HS2? What happened to the more than 60 promises made by Ministers on the delivery of the eastern leg? HS2 will not be delivered in full. What about delivering Northern Powerhouse Rail in full? How about an annual rolling programme of electrification of our railway lines? And where is the annual rail network enhancements pipeline?

To make matters worse, after 13 years of cuts, cuts, cuts, we are being promised even more cuts. Network Rail is being forced to make £4 billion of efficiencies in the next few years, and it has been reported that train operating companies expect to cut their budgets by over 10%. It does not take an industry expert to know what that will mean: fewer services, further increases in fares, and job cuts.

Our railways provide a unique opportunity to connect our nations and regions. With the right investment and vision, we can unleash the economic potential of our great towns and cities. I am sure that is a sentiment the new Rail Minister agrees with, so perhaps he could enlighten us about his long-term vision for tackling regional disparities across our railways and about whether he, unlike his predecessor, hopes to offer more than just short-sighted contests and managed decline.

--- Later in debate ---
Huw Merriman Portrait Huw Merriman
- Hansard - - - Excerpts

I thank my hon. Friend for his point and for his work on the Transport Committee. I will indeed look at the issue in that regard. It is important that the business case has a good cost-benefit ratio, but it is not just the direct return on money that matters; following the reform of the Green Book rules, one also needs to consider—this is great news—what projects do for regeneration and decarbonisation, and these projects deliver on both fronts.

As hon. Members will appreciate, the restoring your railway fund is heavily over-subscribed. My Department received nearly 200 bids—200 excellent bids—to the ideas fund element of the programme alone. We also reviewed proposals whose business cases were already in their advanced stages, such as the Northumberland line and the Bristol to Portishead line, along with existing proposals to introduce a number of new stations under the new stations fund element.

On the points raised by the hon. Member for Slough (Mr Dhesi), I gently remind him that eight schemes under the restoring your railway fund are being delivered; 13 are progressing past the strategic outline business case towards their full business case; and 23 projects have been taken through the ideas fund stage. So I did not recognise the part of his speech where he said that not much appeared to have been delivered. And one of my hon. Friends said, the beauty of this fund is that one gains the buy-in of the local community, local Members of Parliament lead things, and schemes are decided from the grassroots up, not from the top down, which I dare say would be more the line of thinking of the hon. Member for Slough.

Tanmanjeet Singh Dhesi Portrait Mr Dhesi
- Hansard - -

Will the Minister give way?

Huw Merriman Portrait Huw Merriman
- Hansard - - - Excerpts

I will not give way, because I have quite a lot to go through.

I appreciate that many hon. Members—particularly those who have sponsored individual proposals—will have received disappointing news along the way about their schemes not progressing under the restoring your railway programme, although hopefully with constructive and detailed feedback. I hope that the process has been helpful in allowing promoters of projects all over the country to develop their cases.

The hon. Member for Slough also mentioned my contribution to last week’s Transport Committee, which I was very pleased to attend. As I mentioned, we need to be mindful of the fact that it will not be possible for all schemes in the restoring your railway portfolio to progress to the next stage of development. The fact is that we do not have a limitless budget; indeed, although schemes may show promise at an early stage of their business case, some may not be able to cover their operational costs in the long term, and we should not add greater cost to the railways, given how stretched the finances are. When one looks at the schemes that are already being delivered or that are moving to the full business case, one gets quickly to £500 million halfway down the list, so I do want to manage expectations. At the same time, however, that demonstrates that we are getting on with things and spending the fund’s money. We should also be mindful of the wider context of the rail portfolio, where all projects face increasing costs for a variety of reasons, particularly inflation.

Hon. Members should know that I have asked my officials to carry out a review of all the schemes in the restoring your railway portfolio to prioritise the most viable projects for the next stage. That is particularly important in the light of the remaining budget we have available, so that we deliver the most we can under the challenging financial constraints we all have to live with. I emphasise that the process will be driven by data, expertise and careful consideration—that goes back to the third point my hon. Friend the Member for Torbay made, about how we will determine matters. I also assure hon. Members waiting to hear back about bids made to the second and third rounds of the ideas fund element of restoring your railway that those bids are being fully and fairly considered as part of the overall review process.

I want now to respond to the excellent points, cases and pitches that have been made this morning. First, with regard to my hon. Friend the Member for Sedgefield (Paul Howell), the Ferryhill project received further funding in June 2022. Sedgefield station is a possible additional stop between Ferryhill and Middlesbrough, and it is under consideration.

I thank the hon. Member for Tiverton and Honiton (Richard Foord) for his kind words. As he noted, the Wellington and Cullompton project is progressing to a full business case, and a decision will be made once that has been finalised.

In her brilliant speech, my hon. Friend the Member for Stourbridge (Suzanne Webb) made a pitch for Stourbridge and Round Oak, and it is hard—wellies or no wellies—to resist the points that she made. I know that the bid was not successful in the first ideas round stage, and I hope there has been feedback about what more can be done. I am happy to meet her to go through matters, and I really note—as should her constituents—the passionate pitch she has made.

My hon. Friend the Member for Stroud (Siobhan Baillie) referred to the Stonehouse Bristol Road station. The Department is reviewing strategic outline business case, and we will get back to her.

As ever, brilliant speeches were made by my hon. Friends the Members for Stoke-on-Trent North (Jonathan Gullis) and for Stoke-on-Trent South (Jack Brereton), who made a great pitch for the Stoke-Leek line. That is an ideas fund 3 project, and the strategic outline business case is being reviewed by the Department. I know that my hon. Friends will keep on at me in that regard, and my hon. Friend the Member for Stoke-on-Trent South should be assured that Meir station has been funded to full business case. That was announced in June 2022.

The Leamside project is championed by my hon. Friend the Member for Darlington (Peter Gibson); it is also being talked about outside this place, and I was delighted to meet Members from across the north-east yesterday in that regard. My hon. Friend specifically mentioned the Darlington to Weardale project. That is also in ideas fund 3. We are reviewing the strategic outline business case, and I thank him for the passionate points he made to champion the project.

Every time there is a rail debate, my hon. Friend the Member for Ynys Môn (Virginia Crosbie) is here making the case for her constituents. Despite the spelling of my first name, I will not try to pronounce the names of the projects, but I will tell her, more importantly, that the strategic outline business case, having gone through ideas fund 3, is being reviewed. I am already on my way to see her with regard to other projects, and I am sure I will bring the wellies and we will tramp through. To continue the welly references, my hon. Friend the Member for North Devon (Selaine Saxby) is a real champion for transport and Combe rail. I know it was unsuccessful in the ideas fund, but I want to talk with her to find out what more we can do.

I want to respond to two other points made by my hon. Friend the Member for Torbay. On what happens when local stakeholders do not support a bid, the beauty of these applications is that we want people to be able to crack on at pace. Obviously, it is challenging when one part of the stakeholder community is not willing to support a bid. That applies in particular if a planning authority is involved. I note the points made by my hon. Friend, who comes up with some brilliant ideas and suggestions. I hope his council will think again and join the local stakeholder community in supporting his bid.

My hon. Friend also asked me to recommit to the fund. I recommit to that fund; it is a brilliant scheme that allows MPs and community members to get involved and get back the railways they lost many years ago. I want to finish by congratulating him again—

Oral Answers to Questions

Tanmanjeet Singh Dhesi Excerpts
Thursday 19th January 2023

(1 year, 3 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lindsay Hoyle Portrait Mr Speaker
- Hansard - - - Excerpts

I call the shadow Minister.

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- Hansard - -

Neither passengers nor hard-working staff are happy with the lamentable state of our railways on this Government’s watch. They have bumped up ticket prices twice as fast as wages have grown, yet passengers are experiencing delays and cancellations to most services at Britain’s busiest stations, with experts declaring that our rail system is broken. So what is their plan to fix the mess they have made? If the Financial Times is correct, their big solution is to impose even more devastating funding cuts of more than 10% on train operators. Forget managed decline: in 2023 it looks more like freefall decline. Rather than this veil of secrecy over steep service cuts, can the Minister confirm how much of a cut he is imposing?

Huw Merriman Portrait Huw Merriman
- Hansard - - - Excerpts

The hon. Gentleman will be aware that passenger numbers are at about 80% of where they were pre-pandemic. The timetable is at about 90%, so it continues to run ahead of passenger numbers. Taxpayers more broadly have put in £31 billion over the last two years to support the railway, and there will be a further £11 billion required for the year to come. We have a balance between those who use the railways, continuing to ensure that they can do so, and those who fund the railways and the difficulties they have in meeting their tax bills. I look forward to his optimism and enthusiasm in working with me to ensure that railway services improve, as I am determined they will.

West Coast Main Line: Services

Tanmanjeet Singh Dhesi Excerpts
Thursday 15th December 2022

(1 year, 4 months ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- View Speech - Hansard - -

I am grateful to the Backbench Business Committee for allowing this important debate, and I congratulate the hon. Member for Ynys Môn (Virginia Crosbie) on securing it. Given that the west coast main line is, in the words of the Minister’s own Department,

“one of our most important rail corridors”,

it was crucial for the House to have the opportunity to discuss the state of the line’s services—or, more accurately, lack of services—on this Government’s watch.

While there are numerous challenges across the line, as we have heard today from one Member after another, the bulk of the issues faced by passengers comes from just two operators. Let us look at suspect No. 1, Avanti West Coast, with 33% of services running on time. That is its current record, and it means two thirds of passengers being left out in the cold on platforms—two thirds of passengers who are late for their commitments or, even worse, never make them; two thirds of passengers who have been let down by Avanti’s shocking rail services. Instead of acknowledging the shortcomings of these operators, the Government have rewarded Avanti’s ongoing failures with a new contract extension, much to the consternation of Conservative Members. That contract was paid for out of the pockets of the very passengers who are being let down by Avanti, again and again.

Figures show that, last year alone, £12 million in dividends was paid to Avanti, the country’s worst-performing operator. Why is that? Why are the Government prepared to make hard-working passengers pay for a service that is delayed or cancelled almost as often as it is on time? One would be forgiven for thinking that having removed thousands of services from its schedules in August, reducing the number of trains between Euston and Manchester Piccadilly from one every 20 minutes to one every hour, Avanti would be capable of producing a more reliable network. Sadly, even expecting that minimal level of service has been wishful thinking. Instead, those who rely on the busiest main line in the country face the reality that one in every eight Avanti west coast trains are cancelled. It is utterly absurd that millions of people, let alone numerous local businesses, cannot rely on these services.

Local metro Mayors have repeatedly raised concerns with the Government about the devastating impact the rail chaos is having on the northern economy, cutting people off from jobs, cutting businesses off from opportunities and cutting towns off from investment. Rewarding rail operators that obstruct northern growth is a far cry from the Government’s levelling-up agenda, which promised to better connect our towns and cities. The Government’s willingness to reward failure appears to be the common policy choice for west coast main line operating companies.

That brings us on to suspect No. 2: TransPennine Express. Six years ago, TransPennine Express blamed staff shortages, rest day working and driver recruitment for its failing services. Today, it is peddling the same old tired excuses. It therefore comes as no surprise that the Government plan to reward it with an eight-year contract in May. Some may be overly generous and say that the Government are incapable of recognising failure, but when we see how they are managing our public services across the board—from our health services and our schools to our borders—it is clear that they are simply doubling down on their failures and are happy to leave hard-working members of the public to pay the price. The Government have come up with a litany of excuses on behalf of west coast main line operating companies—excuses that do little to reassure those impacted by shambolic services.

Instead of making excuses, the Government should be looking at operators who are getting it right. On the east coast main line, as was explained earlier, more services are being delivered on time, with fewer cancellations. The Government have a responsibility to ensure that Britain’s rail infrastructure rivals that of our global partners. Instead, because of years of Tory failure to properly invest in our network, they have left our country with a second-rate infrastructure and rail services in crisis. To build the rail network that Britain needs, if the Government are not willing to strip franchises, they must at the very least place failing operators on a binding remedial plan to restore services for the British public, with clear penalties that discipline failure, not reward it. The new Rail Minister—the Minister of State, Department for Transport, the hon. Member for Bexhill and Battle (Huw Merriman), for whom I have a great deal of respect, especially in his previous role as Chair of the Transport Committee—has himself admitted that he absolutely sees the urgency of the current situation. If that is the case, why is he not taking urgent, decisive action?

Perhaps now would be a good time for the Minister to also come clean on whether the Transport Secretary is blocking an offer on rest day working that could stabilise rail services in the short term. The spokesman for the SNP, the hon. Member for Paisley and Renfrewshire North (Gavin Newlands), highlighted how the Transport Secretary, at the very last minute, torpedoed talks and an agreement that would have prevented strikes, but we shall leave that to debate another day.

The Government have demonstrated time and time again that they cannot be trusted to follow through on their promises, and now Avanti is following suit.

Navendu Mishra Portrait Navendu Mishra
- Hansard - - - Excerpts

I am often confused, because the Department for Transport often comes across as the public relations department for private rail operators, rather than as a Government Department resolving disputes and their root causes. Does my hon. Friend feel the same?

--- Later in debate ---
Tanmanjeet Singh Dhesi Portrait Mr Dhesi
- Hansard - -

I thank my hon. Friend for that invaluable point. That is the central point: the Government must work for the people who have elected us, rather than the operators themselves. We owe it to the British people to ensure that they have world-class, quality rail services.

Robin Millar Portrait Robin Millar
- Hansard - - - Excerpts

Does the hon. Gentleman think that the public relations arm of the unions on the Opposition Benches would do a better job?

Tanmanjeet Singh Dhesi Portrait Mr Dhesi
- Hansard - -

In the last few months the Labour party have called again and again on Transport Secretaries—we are on our third one, and I have faced one Rail Minister after another and hope that the incumbent will be in his position for a lot longer—to get around the table to resolve these issues. If they had, they would have been long resolved. As was exposed by The Daily Telegraph, along with other media, had it not been for the Transport Secretary torpedoing the talks between the rail unions and operators at the last minute by introducing another condition on driver-only trains, the British people would not have had to face train strike action.

In November Avanti promised a full timetable for December, but managed only a 40% increase in services. We have heard cross-party complaints. The hon. Member for Ynys Môn eloquently explained Avanti’s repeated broken promises and rip-off rail, as she termed it. She said that Avanti’s services have deteriorated even more than before. We have heard about the failures in staff shortages, recruitment and morale—comments underpinned by the ASLEF rail union general secretary, Mick Whelan. This must be the last chance saloon before it is stripped of its franchise and put under the operator of last resort.

My hon. Friend the Member for Stockport (Navendu Mishra) spoke about the damage to Stockport’s economy and the region, and how catering roles had been cut significantly. He spoke eloquently about the RMT’s “Justice for Cleaners” campaign and how it is unacceptable that so many hard-working rail workers who kept our country moving during the pandemic are now relying on food banks. Shockingly, 84% of rail workers are struggling to make ends meet. He described how the privatised, fragmented franchise model has failed us.

The right hon. Member for Clwyd West (Mr Jones) said that he came here by car because he could not rely on the rail services. He spoke about how since 2019, Avanti has operated deplorably and is incapable of building good relations with its staff. He said that north Wales Conservative MPs wrote to the Minister to ask him not to renew Avanti’s franchise. He laments that the Minister says that he is working with Avanti, but he may be flogging a dead horse.

The right hon. Member for Tatton (Esther McVey) spoke with considerable experience about how we are all suffering the same fate, especially given that she is a frequent user of this service. She said that, sometimes, not even the guards know whether a train is coming. The hon. Member for Milton Keynes North (Ben Everitt) spoke about how his constituents are being thoroughly let down. Appallingly, he often has to sit on the floor in his usual spot next to the toilets. He mentioned the accessibility problems faced by disabled passengers.

The hon. Member for Delyn (Rob Roberts) spoke about how levelling up is being undermined by the consistent rail fiasco. The hon. Member for Aberconwy (Robin Millar) saw fit to make biting interventions, but none the less he spoke about the importance of the line for England, Scotland, and Wales and how we seem to debate poor services on the west coast mainline on a weekly basis—more reliable than Avanti’s current services.

When can we expect Avanti to deliver a full service for the north? Will it finally be stripped of the franchise? Finally, on TransPennine Express, can the Minister reassure the House that, given its record of failure, its contract will not be renewed for a further eight years? In the run-up to Christmas, people should be spending time with family and friends, not wasting time on platforms waiting for trains that never turn up. The Government need finally to get a grip.

Southeastern Railway Timetable Changes

Tanmanjeet Singh Dhesi Excerpts
Tuesday 6th December 2022

(1 year, 5 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- Hansard - -

It is a pleasure to serve under your chairship, Ms Harris. I congratulate my hon. Friend the Member for Eltham (Clive Efford) on bringing forward this important debate so that we can address Southeastern railway’s timetable changes, which will be implemented on 11 December.

Whether it is the north, with the likes of Avanti and TransPennine Express, or the south, as has been eloquently expressed by right hon. and hon. Members across the House, this Government are presiding over rail chaos and catastrophe. Cuts to services, increasing rail fares and empty promises—this summarises the Government’s record on rail for the past 12 years. The proposed timetable changes announced by Southeastern show that this record is not set to change any time soon.

Southeastern’s proposed timetable changes will see 302 fewer trains running on a typical weekday and even more trains cut from the weekend timetable, meaning that people travelling from Greenwich will be left with just four trains per hour and made to wait up to 23 minutes. Given that passenger numbers are consistently reaching 90% of pre-pandemic levels, and given that the Government have decided to discontinue collecting data on the overcrowding of rail networks, as eloquently highlighted by my hon. Friend the Member for Greenwich and Woolwich (Matthew Pennycook), can the Minister advise how he will ensure that these packed services do not become even more overcrowded?

Who, indeed, is going to address the anger? What was palpable from the contribution of my hon. Friend the Member for Lewisham, Deptford (Vicky Foxcroft) was the feeling of widespread anger. How will that be addressed? My hon. Friend the Member for Lewisham East (Janet Daby) also highlighted the problems that will now be faced by elderly and disabled passengers, along with the safety of vulnerable people, and I hope that the Minister will address those concerns.

My hon. Friend the Member for Erith and Thamesmead (Abena Oppong-Asare) highlighted the loss of trust among the public, the emails from angry constituents and the car-led recovery that none of us wants. I hope that all those factors will be addressed by the Minister. While Southeastern has tried to justify the timetable changes as an attempt to reduce the pressure on junctions, there has clearly been little consideration of the pressure that the reduced services will place on our roads.

I have a great deal of respect for the Minister. He will know that our public transport network is integral to Britain’s efforts to tackle the climate crisis and meeting net zero, yet the Government’s priorities sadly appear to be cutting services, not emissions. This, alongside ever-soaring fares and the Government’s inability to guarantee a reliable train service, will inevitably force passengers to consider less sustainable travel alternatives. Can the Minister advise whether he has considered the wider environmental impact that Southeastern’s proposed timetable changes will have?

The Government’s failures are a reflection of their inability to manage our rail network on a much larger scale. The Minister himself has spoken of the need to instil

“confidence in our railways”.

The reality is that the Government’s management of our rail networks has done the exact opposite, throwing rail services across our country into complete and utter chaos. In one day, almost 40 services were cancelled by TransPennine Express alone, while Avanti has had the fewest trains on time and has had more complaints than any other operator. However, it was still awarded a contract extension. Let us not forget that the Government have continually failed to engage in productive discussions to resolve the ongoing Tory rail strikes, preferring instead to pay the same amount of taxpayer money to the train operators, regardless of whether services are running.

The Government are showing time and again that they are unable to deliver the rail service that the British public want, need and deserve. What is worse is that the passengers who are suffering due to those failings have had no say whatsoever in this Conservative-created chaos. As has been the case with many of the Government’s decisions over the past few months, the proposed cuts to Southeastern services have been decided without any public consultation as has been expressed by Members from throughout the House. As my hon. Friend the Member for Eltham noted, the Government seem to have adopted the role of Fat Controller with little regard for how the changes will have real implications for the 400,000 passengers who rely on the operator’s services to get to work, make appointments and visit family members. I am not saying that the Minister is the Fat Controller; I am merely saying that this is emblematic of the wider approach.

Passengers who use the popular Woolwich line to Charing Cross, for example, now find that regular service completely scrapped. That puts further pressure on other already overcrowded stations and services with no thought, it seems, for the consequences that will have for passengers with accessibility needs or those who want to maintain a safe and quick way to travel back from London’s west end late at night, as the hon. Member for Old Bexley and Sidcup (Mr French) eloquently highlighted. The excuse for that cut has been the opening of the Elizabeth line. However, it is not clear to me why that line, which was intended to enhance our transport network and runs largely north of the Thames, has resulted in the stoppage of services that run almost exclusively to the south.

The lack of public consultation for such significant timetable changes has not gone unnoticed across the House, including by those in the Minister’s party, with many of his Back Benchers citing the value of consulting with local communities. Indeed, the right hon. Member for Bexleyheath and Crayford (Sir David Evennett) forcefully highlighted that everybody is singing from the same hymn sheet about how the changes fail customers and will be a complete disaster. Given that everyone agrees that the lack of public input is entirely unacceptable, will the Minister advise why Southeastern was granted the derogation back in August and confirm whether Ministers intend to grant any further operators derogation from consultation? This debate will be listened to not just by Members representing constituencies in the south-east; the wider point will be very closely listened to by others across our country.

This debacle is the most recent in a catalogue of failures from Southeastern. If the Minister is serious about restoring confidence in our railways, the Government need to begin by listening to those most affected by the proposed timetable changes and committing to providing the investment necessary to see real improvements to our services, rather than overseeing the managed decline of our railways that we have sadly come to expect from them. Those who rely on Southeastern rail services deserve a network that works for them. My final question is simple: when can those passengers expect to get one?

Oral Answers to Questions

Tanmanjeet Singh Dhesi Excerpts
Thursday 24th November 2022

(1 year, 5 months ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Lindsay Hoyle Portrait Mr Speaker
- Hansard - - - Excerpts

I call the shadow Minister.

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- View Speech - Hansard - -

There is no point in making promises to level up communities through transport if Ministers announce yet another punishing rail fare rise next month. A 3.8% rise, like this year, would mean £129 more for an annual season ticket between Chester and Manchester, and 8% would mean Swindon to Bristol commuters paying £312 extra. The retail price index figure—the usual figure used for rail fare rises—of 12.3% would burden Dover to London passengers by an additional £909 every year. Given that the rail recovery is fragile and given the Conservative cost of living crisis, does the Secretary of State agree with me that now would be the worst possible time for yet another brutal rail fare rise?

Mark Harper Portrait Mr Harper
- View Speech - Hansard - - - Excerpts

I am glad the hon. Gentleman raises that question because he flags up a very important issue. There are only two places that revenue can come from in the rail sector—the passenger, through the fare box, or the taxpayer. I am very well aware of the challenges facing people with the cost of living and inflation, but we also have to make sure that the cost does not fall on taxpayers, many of whom never use rail services. One of the things we will do as we are making this decision is to weigh up exactly those two things—the pressure on the passenger through the fare box but also the burden that falls on the taxpayer. We will balance those, and when we have made a decision, we will announce it in the usual way.

Draft Transport and Works (Guided Transport Modes) (Amendment) Order 2022

Tanmanjeet Singh Dhesi Excerpts
Tuesday 22nd November 2022

(1 year, 5 months ago)

General Committees
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- Hansard - -

It is a pleasure to serve under your chairship on this statutory instrument on guided transport modes, Dame Caroline. Since taking on this brief over two years ago I have consistently marvelled at the innovation and progress made in the transport industry. Improving safety, making efficiencies and tackling the climate crisis have long been aims of the industry, which has shown consistent innovation in bringing forward battery-operated trains, driverless vehicles and—among the more recent developing technologies—non-physically guided transportation, often using sensors.

As the Minister outlined, this statutory instrument facilitates the authorisation of applications for new transport schemes that wish to use non-physical guidance. Clearly, that signals significant potential change for our tramways, bus lanes, railways and roads, and it expands the types of guided transport modes that TWA applications can cover. Whether we are enabling buses to use road markings as guidance, or trains to monitor tracks and surroundings through sensors, it is important that legislation maintains the safety of these emerging technologies, while ensuring that our transport systems are able to take advantage of the latest developments.

I appreciate that this SI simply enables such applications and that the merits of individual applications will be considered under existing legislation in respect of their safety and the worker and passenger impact, but it would be remiss of me not to mention a number of issues. As the Minister will be aware, concerns were raised as a result of the consultation documents produced alongside this SI regarding the limits and drawbacks of sensor technology in particular. That included poor weather impacting electromagnetic contact and therefore the information a sensor is able to convey. Weather already has a significant impact on our railways, as we have seen as a result of landslides, heatwaves and debris on the track. Safety must be paramount when it comes to transport. I appreciate that this technology should mitigate some safety concerns through the detection of obstructions, pedestrians and faults, but I hope that the Minister can address any concerns directly.

We must also consider any worker impact that the implementation of these technologies and further automation may have. Any needless cutting back of experienced and valuable workers on our transport networks does not serve passengers, transport operators or the system as a whole. There will certainly be anxieties about that in the transport sector, given the current chaotic climate the Government are presiding over. Will the Minister therefore reassure me that those who have dedicated decades to our railways will not be short-changed because of such innovations, but will be better supported by them?

As the Minister knows, supporting such innovation and allowing it to develop must be a continued priority for the Government. We must ensure that we have adequate research and development spending and that we encourage the best and the brightest in Great Britain to build industries that will help us tackle future challenges. We cannot fall behind our European counterparts in particular, as we have with previous technological innovations, such as electrification. As has been noted, the technologies covered in this SI are already operational in Spain, France, Japan, and China. Without funding and support, we cannot realise these technologies on our own transport network. What steps has the Minister taken recently to ensure that there is enough research and development spending in this area and that this technology can indeed flourish?

I hope the Government are guided by industry experts, unions and developing technologies and ensure that we develop a world-leading transport network with the safety of passengers and workers at its heart.