To ask the Minister for the Cabinet Office, when the second phase of the Grenfell Inquiry is planned to (a) start and (b) conclude.


Answered by
Chloe Smith Portrait
Chloe Smith
This question was answered on 5th February 2019

The Grenfell Tower Inquiry is an independent public Inquiry. The timetable for the Inquiry’s work is a matter for the Inquiry Chair, Sir Martin Moore-Bick.

The Chair set out next steps for the Inquiry's work at the conclusion of the Phase 1 hearings on 12 December 2018.

Sir Martin noted that he would like to start the Phase 2 hearings as soon as possible, but that there is significant preparatory work to do.