M67: Litter

(asked on 17th June 2020) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, what discussions he has had with Highways England on removing litter on the Junction 2 on-sliproad to the M67 in Denton.


Answered by
Rachel Maclean Portrait
Rachel Maclean
This question was answered on 25th June 2020

The Secretary of State for Transport has had no such discussions with Highways England on removing litter at Junction 2 on-slip road to the M67 in Denton.

Highways England have confirmed that any restoration measures are required to take place within the timescales set out in the Code of Practice on Litter and Refuse. This states that any areas with special circumstances that falls below grade B, such as carriageways, verges and central reservations of motorways and trunk roads, must be restored back to grade A standard within twenty-eight days or as soon as reasonably practicable. Highways England expect to remove litter from the entry slip road within the next three weeks.

Reticulating Splines