GWR and Network Performance Debate

Full Debate: Read Full Debate
Department: Department for Transport

GWR and Network Performance

Geraint Davies Excerpts
Tuesday 5th February 2019

(5 years, 2 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Stephen Doughty Portrait Stephen Doughty
- Hansard - - - Excerpts

I wholeheartedly agree with my hon. Friend, who chairs the Transport Committee. Later in my speech, I will come to some of my own views on that, which have been known for a long time. We should have a co-operative, publicly owned service, and a different model for our railways in which we bring the different parts of the system together.

Geraint Davies Portrait Geraint Davies (Swansea West) (Lab/Co-op)
- Hansard - -

Since 2010, Wales has received 1.6% of investment for 5% of the population and 11% of the railway network. Over a longer period, it has been only 1%. That is fatal under-investment in Wales. There has not been a lot of investment and we need more.

Stephen Doughty Portrait Stephen Doughty
- Hansard - - - Excerpts

I completely agree with my hon. Friend. What a contrast with the new investment announced by the Welsh Labour Government for the services for which they are responsible. The new Transport for Wales services have recently encountered many difficulties, but I am absolutely convinced that with new rolling stock, the new services will be hugely improved. The Welsh Government are investing in those services.

--- Later in debate ---
Geraint Davies Portrait Geraint Davies (Swansea West) (Lab/Co-op)
- Hansard - -

Briefly, we are, in the first instance, talking about problems with the trains. On the new trains there are problems with the toilets. When someone washes their hands in the sink, water goes all over the floor, and in fact water starts to seep out of the back of the toilet; that is to do with the way they are manufactured. There are fewer toilets and some carriages do not have them. I do not mean to be preoccupied with toilets, but some trains have arrived at Bristol without any carriage with a toilet.

There are issues with wi-fi not working, and with plug sockets between the seats. I found myself in a situation where there was a sleeping woman in the neighbouring seat, and fiddling around to plug a device in can be slightly embarrassing. There is no buffet car and the buffet trolley cannot get down. There are problems of cost, punctuality and cancelled trains. There were eight carriages in the old trains, and now there are two lots of five. Sometimes one of the fives is cancelled at short notice, so that people who have booked particular seats are affected. Families cannot sit together and people with disabilities have to stand up. Those are appalling standards for customers.

As to more strategic issues, as I mentioned earlier, Wales has 5% of the population, about 1.5% of the investment and 11% of the track, so we have been grotesquely underfunded. Since 2011 we have had about £198 million and we should have had £600 million. Electrification to Swansea was cancelled—that was another £700 million; and Network Rail cancelled a further £1 billion. The chronic under-investment has meant that standards simply are not up to scratch. The service to Swansea from Paddington is often only hourly, and it takes three hours. On High Speed 2, people will be able to get to Manchester within an hour. I could compare the Leeds and Manchester area with the Bristol, Cardiff and Swansea area—which is 3 million people. We get two trains per hour on the Bristol to Cardiff bit, and fewer to Swansea, as I have said. In the Leeds and Manchester area there are six trains per hour, and of course an investment of £3 billion is being made in the trans-Pennine upgrade—on top of the £52 billion for HS2. We are grotesquely underfunded, and our economy suffers massively.

Trains run at 125 mph in England, but when they get to Wales their speed goes down to 60, 70 or 80 mph, because we have not had the investment in the track. That is not a western powerhouse, but more of a 19th century infrastructure. After years of under-investment it is time for change and investment. What we do not need is the Secretary of State for Wales coming along with his penny-farthing idea of an extra little Swansea Parkway station, hoping that he can pat us on the head and give us a Brexit bung so that we will vote the right way.

We need investment in a Swansea metro, strategic infrastructure and connectivity between the Bristol conurbation, Cardiff and Swansea, so that we can grow a regional hub for the future. I hope that some of the leadership for that can be taken by Transport for Wales—the UK Government obviously have other things to think about—and that with the right money and the right governance we will get the right result. As we approach the appalling disaster of Brexit, we need investment in our infrastructure now, to give us a fighting chance of building prosperity in south Wales. That requires investment, planning and UK money, and it requires the Welsh Government to be given the steering wheel.

--- Later in debate ---
Andrew Jones Portrait Andrew Jones
- Hansard - - - Excerpts

I most happily agree to meet my right hon. Friend.

Questions were raised earlier about how the industry is held to account. The answer is through the Office of Rail and Road, the industry regulator, which holds Network Rail to account for its performance and takes enforcement action in the event of unacceptable performance. The Government will hold franchise holders to account when things go wrong by enforcing their franchise agreements, with contraventions dealt with under the terms of those agreements and in accordance with the Department’s general management compliance process. Evidence of that can be seen in the recent action taken against Govia Thameslink Railway.

Passenger satisfaction is obviously critical and will remain an absolute focus for me as an incoming Minister. Colleagues raised questions about the governance of the area, and I am pleased to see that Network Rail has joined forces with the regional train companies, GWR and Heathrow Express, to create a new joint supervisory board to drive improvements. This is the latest stage of the companies’ commitment to working closer together to improve the passenger experience.

Investment in transport infrastructure has been a long-standing problem across the UK. We have not invested enough in our transport infrastructure over decades, which applies to Governments of all colours. However, I do not think that that accusation can be made against this Government. We are investing £48 billion in our rail network in the next control period.

Geraint Davies Portrait Geraint Davies
- Hansard - -

Will the Minister give way?