Volumetric Concrete Mobile Plants

Tanmanjeet Singh Dhesi Excerpts
Thursday 22nd June 2023

(2 years, 9 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Alistair Carmichael Portrait Mr Alistair Carmichael (Orkney and Shetland) (LD)
- Hansard - - - Excerpts

I beg to move,

That this House has considered volumetric concrete mobile plants.

It is a pleasure to serve with you in the Chair, Mr Efford. I place on record my appreciation of the Backbench Business Committee for allowing us time to debate an important, if hopefully not the most contentious, area of political regulation.

We are doubtless all familiar with the sight of large conventional drum mixers carrying concrete around our streets and roads. Those drum mixers operate at 32 tonnes and carry loads of 8 cubic metres to building sites. They carry concrete that has been prepared in a fixed location and then loaded on to the mixers. Drum mixers are the dominant force in the market, and there are something in the region of 20,000 of them.

Volumetric concrete mixers are a much smaller part of the concrete sector but can operate in circumstances in which the conventional drum mixers do not, most notably in rural areas or where smaller batches are required. They can legally weigh up to 44 tonnes on five axles and 38.4 tonnes on four axles. That is at the heart of the matter that I wish to discuss. They deliver concrete to individuals and smaller businesses and mix concrete on site. They are particularly useful for reaching remote areas and tight urban sites, and compared with larger traditional concrete carriers they have a range of other benefits, notably their lower carbon usage.

There is a large element of time-sensitivity at play here. Once mixed, concrete has a shelf life of only two hours, which means that drum mixers must get to their construction site and pour the concrete within that two-hour period or it goes to waste and to landfill. The need for VCMs in rural areas—where there are fewer plants mixing concrete at scale, if indeed there are any at all, and hence longer road journeys to sites—is obvious, but the place of VCMs in the sector goes beyond that. They are particularly useful for emergency road and rail repairs, where the mixer may have to wait around. For a drum mixer, an expensive batching plant must be set up to avoid concrete becoming unusable at the two-hour mark, but VCMs have no such issues, which shows their benefits in such situations.

There is a very real danger that, if the Government’s regulation of the sector gets the balance wrong, the whole volumetric concrete sector could be placed at risk and a small but very important part of the construction industry could be lost, for little discernible benefit.

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- Hansard - -

I thank the right hon. Gentleman for securing today’s debate on volumetric concrete mobile plants and for allowing me to intervene. Having worked in the construction industry for about two decades, and having gained a dumper driver ticket to take ready-mixed concrete on a dumper to various parts of the construction site, I could not resist taking part in today’s debate. More to the point, my constituency is home to Mixamate, which is a ready-mixed concrete business. Mixamate highlights to me not only the impact on livelihoods but the environmental and economic damage that policy could create. Does the right hon. Gentleman agree that it is incumbent on the Government to undertake a full impact assessment of current legislation?

Alistair Carmichael Portrait Mr Carmichael
- Hansard - - - Excerpts

Had I known that the hon. Gentleman had that level of expertise, I would have had him on the all-party parliamentary group for lower carbon construction vehicles a long time ago. I agree with him. I do not want to reheat old debates, but we are where we are today because there was not a proper economic and environmental impact assessment at the time. I hope the Minister will indicate that the Government are willing to revisit the issue. If we go through the process properly, we will find that there is a better way of dealing with the issue, but I will let the Minister speak for himself.

VCMs operate right across the United Kingdom. Their manufacture and use are estimated to contribute £380 million to the economy and employ more than 15,000 skilled workers. They operate the length and breadth of the country, and in communities such as those that I represent they are of prime importance to the local construction sector. Businesses such as Andrew Sinclair Ltd in Orkney and Tulloch Developments in Shetland tell me regularly about the desperately detrimental impact that the proposed changes will have on them.

Companies with VCMs operate in at least 134 constituencies and are a truly integral part of the country’s construction industry. For almost 50 years, they have operated within a proportionate regulatory environment. Until 2018, VCMs on four axles could run at the manufacturer’s design weight, which is often about 41 tonnes. However, in 2018, the Department for Transport decided to impose a 32 tonne limit for all VCMs, enacted through the Goods Vehicles (Plating and Testing) (Miscellaneous Amendments) Regulations 2017. The limit forces VCM operators to phase out their current VCMs by 2028, replacing them with the 32 tonne model, which is equally expensive but less effective. Lighter vehicles mean more journeys on the road and more carbon emissions as a consequence.

That is despite the fact that Highways England’s 2017 report endorsed the operation of VCMs at about 44 tonnes on five axles and 38.4 tonnes on four axles. That proposal had the support of the then Transport Minister, the right hon. Member for South Holland and The Deepings (Sir John Hayes). To be less than generous, this is a classic example of an obscure regulation changed by civil servants that causes a massive headache for businesses in the real world.

Williams-Shapps Plan for Rail

Tanmanjeet Singh Dhesi Excerpts
Wednesday 14th June 2023

(2 years, 9 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- Hansard - -

It is a pleasure to serve once again under your chairship, Ms Fovargue. I am grateful to the hon. Member for Cleethorpes (Martin Vickers) for securing this important debate on the future of our railways. He eloquently explained that the status quo is not working: fares are high, services are not running, and passengers are not happy. The rail model is broken.

Whenever someone puts their name to something and is then no longer there to lead it, the project is usually destined for failure, as was the case when the then Transport Secretary, the right hon. Member for Welwyn Hatfield (Grant Shapps), decided to append his name to the long-awaited Williams review, calling it the Williams-Shapps review, and was then unceremoniously moved out of office to be replaced by another Transport Secretary. I knew straightaway that the review was doomed to be discarded and dumped, which is the situation we now find ourselves in.

It has been two years since the Williams-Shapps plan for rail was published, promising the biggest shake-up of our railways in three decades. We certainly have seen a shake-up, including three Prime Ministers and as many Transport Secretaries, two failing train operating companies put under the operator of last resort, endless strikes, and nearly one in 20 services cancelled in the third quarter of 2022-23. As the hon. Member for Paisley and Renfrewshire North (Gavin Newlands) remarked, the Government are ideologically opposed to taking rail back into public ownership, as the Labour party has proposed. Great British Railways was hailed by the Government as the solution—a guiding mind with clear, central accountability. That means nothing if the status quo remains and progress continues to stall.

As the hon. Member for West Dorset (Chris Loder) explained, the path ahead of us is unclear. There is enormous uncertainty in an enormous industry. If Great British Railways is the Government’s flagship rail policy, it has certainly run aground. As explained by the Chair of the Transport Committee, the hon. Member for Milton Keynes South (Iain Stewart), there is Government drift on GBR, especially on the legislation. Just a few weeks ago, it was reported that officials were told that it would not be a priority and would not appear in the King’s Speech. GBR has been taken out of the transport Bill, and it may have only a fraction of the powers first proposed. A new headquarters has been announced amid much fanfare and videos produced at taxpayers’ expense, but concrete proposals for it are nowhere to be seen.

I look forward to the Minister providing some clarity. Perhaps he can tell us whether the Government even remain committed to delivering Great British Railways in full. If they are, will he use this opportunity to outline exactly what non-legislative steps will be taken by his Department to move forward with Great British Railways, and when? It cannot become an expensive vanity project, with taxpayers footing the bill. They have spent £50 million and counting on the transition team, and £20 million on consultants alone.

Worse still, the Government forced local authorities into a protracted competition for the opportunity to host Great British Railways’ headquarters, on a promise that it would bring jobs and opportunities. Now, after spending its precious time and resources, Derby is stuck in limbo—a fitting metaphor for the Government, who cannot help but over-promise and under-deliver. I urge the Government to get on with it. As the hon. Member for Stoke-on-Trent South (Jack Brereton) highlighted, the Government must stop dragging their heels, but they have been too busy lurching from crisis to crisis, while rail operators’ poor performance has gone unpunished or, even worse, been rewarded. In April, the Transport Secretary authorised a £65 million reward payout for First Group, the company that ran two of the worst-performing operators last year. It is absolutely absurd. Passengers deserve better.

We have years of missing annual updates on the rail network enhancements pipeline, which is vital to industry stakeholders. We have had consistent industrial action, which Ministers admit is costing much more than if they had agreed the pay rises for rail workers. We were promised simpler fares; instead, we get a 5.9% increase. We were promised net zero; instead, we got only 2.2 km of rail electrification in 2022. We were promised centralised timetabling; instead, we got service reductions and cancellations. We were promised devolution; instead, we got disparity, with the north left in the lurch.

Our railways are on a downward turn, despite journeys returning to pre-pandemic levels. Passengers and the industry feel as though they have been abandoned. Unity, vision, leadership—that is what our railways need, and what stakeholders and passengers want, not this broken system under this broken Government.

East West Rail: Bedford to Cambridge

Tanmanjeet Singh Dhesi Excerpts
Tuesday 13th June 2023

(2 years, 9 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- Hansard - -

It is a pleasure to serve under your chairmanship, Sir Mark. I extend my gratitude to the hon. Member for North East Bedfordshire (Richard Fuller) for securing this important debate. It is clear that the debate has allowed Members from both sides to diligently voice their concerns on behalf of their constituents, and I commend their passion in ensuring that the voices of local people are heard. I hope the Minister has been listening intently and will address the questions posed to him clearly and transparently.

Despite being the Member for Slough, I am not stranger to Cambridge or Oxford, having studied at both universities, and I appreciate the importance of joining these two great cities by rail. More recently, I have had the pleasure of visiting Winslow station. I have also spoken to East West Rail in Milton Keynes, and visited some excellent companies in Milton Keynes that are local to this project, including on the Aylesbury spur, which would no doubt enhance the Bedford to Cambridge connection. Indeed, the line runs through some of the most productive and fastest growing towns and cities. The area supports over 2 million jobs and adds over £110 billion to the economy every year.

As shadow Rail Minister, my support for better rail connections should come as no surprise. As my hon. Friend the Member for Cambridge (Daniel Zeichner) eloquently explained, connecting our great towns and cities through rail links has been proven time and again to provide more opportunities, bolster local economies, unite communities and address the pressing climate crisis. I will always be an advocate for investing in our rail network to make it work for passengers, local communities and the rail industry. That is why it is so important to address the concerns laid out today in order to progress with the project in a way that benefits local people, businesses and passengers.

Putting it plainly, we should not have such limited public transport along this route. Currently, travel from Bedford to Cambridge is restricted to an hour and a half bus service. With the new connection, that is cut to a mere 35 minutes. Quicker journey times, emissions slashed by up to 76% and pressure taken off local roads: the benefits of rail are clear. Those within commuting distance will be increased, with a wider pool of talent for businesses and universities, increasing jobs and opportunities. No wonder, as my hon. Friend the Member for Cambridge again explained to us eloquently, that the top 50 employers in Cambridge have written to the Government in support of the scheme. The aim of the project—to deliver people a better and more convenient way to travel locally—must be maintained alongside local input, consultation and co-operation, not without it.

As hon. Members have outlined, the line covers an area that is going through a great deal of change and growth. This period of flux will undoubtedly mean that significant decisions will be made on infrastructure. Increasing the number of services to meet the existing and growing demand in the region is vital. Failure to provide Government funding to ensure that these needs are met is simply unacceptable. Across our country we have seen people struggle to get GP appointments, a place at their local school or on to the property ladder, and that is exacerbated in areas of high growth and development, as has been highlighted by hon. Members today. That is why progress on the project should be completed alongside public consultation, with local authorities and local people ensuring that decisions are made to benefit the communities who live in those areas.

I feel like a broken record when I say that progress on the project has been characteristically slow, as with countless other rail projects on this Government’s watch that we have debated in the main Chamber and in Westminster Hall. Just last year, the project was rated as “red” by the Infrastructure and Projects Authority’s delivery confidence assessment, which noted that the later stages of the project “appear unachievable”.

The National Infrastructure Commission, no less, recently commented:

“The region presents a significant growth opportunity for the UK but this will be missed if long term certainty is not provided.”

It seems that the Government are lagging behind in all areas. We must build a network for the future, but just 2.2 km of electrified track was added to our rail network last year, while other European nations and others around the world have been full steam ahead—no pun intended—on full electrification. Why has the Minister not insisted on full electrification for the new route, as has been highlighted by my hon. Friends the Members for Bedford (Mohammad Yasin) and for Cambridge, and others? What considerations has he made of the use of trains that are not diesel-only?

As with much of our railway, the Government’s lack of leadership and dithering has impacted progress. The impact of sky-high inflation on building costs, and ongoing Government uncertainty, have not been unique factors in the scheme. Although I am grateful for the Department’s latest update, I am sure the Minister can see that concerns remain. Most notably, perhaps, is the proposed demolition of homes in the constituency of my hon. Friend the Member for Bedford, who is a persistently strong champion and voice for his constituents. The Minister should directly address those concerns and meet my hon. Friend to discuss next steps. This is clearly devastating for the affected communities, as in the constituencies of the hon. Members for South Cambridgeshire (Anthony Browne) and for North East Bedfordshire.

An updated formal business case should also be published. It is simply unacceptable that we are progressing without that update. Clear and effective consultation is clearly the best way forward. The intentions of the project have always been to serve the local community better, so we must ensure that the final project achieves that. I assure hon. Members on both sides of the House that I will personally raise these matters directly with the chief executive of EWR in my planned meeting with her.

EWR must have direct engagement with affected residents to provide all the support that will be needed through the process, particularly regarding compensation and the sale of nearby homes. Will the Minister confirm what action has been taken and what co-ordination there will be with local representatives—Members of Parliament or councillors and authorities—following the recent announcement? Delivering rail projects with local communities’ needs at the very heart should be second nature to a Government in power for 13 years, but sadly they are more chaotic than ever.

We in the region will now have inflicted on us another by-election in which constituents will no doubt deliver a resounding message as to why they will not reward failure. Those that lose out most from Government incompetence are ordinary working people, so I hope the Rail Minister will use this opportunity to address the concerns laid out today. With our railways readying to go full steam ahead, we can ill afford to renege on further infrastructure promises. The people of the north have been betrayed. We cannot allow the people of Bedfordshire and Cambridgeshire to be betrayed. We cannot allow passengers to be let down once again.

Huw Merriman Portrait The Minister of State, Department for Transport (Huw Merriman)
- Hansard - - - Excerpts

It is a pleasure, Sir Mark, to serve under your chairmanship this afternoon. I thank my hon. Friend the Member for North East Bedfordshire (Richard Fuller) for securing this important debate on East West Rail from Bedford to Cambridge. I have listened carefully to his representations. As everyone in the debate has said, he makes excellent points and sets us a challenge. I am keen to work with him to address those points.

I have noted the six or seven points he raised. I will go through some this afternoon, but I will write to him on all of them. I want to work with him to ensure the project is delivered in a way that maximises benefits for members of his constituency and the country as a whole. I am well aware that, when it comes to building new railways, some are very much in favour because they benefit directly or indirectly from the delivery of that new railway. We will always call for infrastructure to be delivered before housing. This is an opportunity where that can be delivered.

Of course, there are those whose lives are directly impacted and blighted by railways, who suffer as a result of the build. I have every sympathy with them, and I am keen to work with my hon. Friend and other hon. Members to minimise that and to give as much information, clarity and frankness in the process as we can. I say that as someone whose family lives in Buckingham and is well aware of the impact of HS2. “I get it,” is what I want to say this afternoon.

Let me speak a little about the project and then go into detail as I go along. The East West Rail project will improve the UK economy, supporting ambitions for the Oxford to Cambridge region, to add £103 billion extra gross value added by 2050, securing the UK’s future as a world leader in science and technology. East West Rail will improve connectivity and ensure growth is spread across the region as a whole. The route update announcement, which was mentioned, was laid before us on 26 May, and set out the preferred route alignment between Bedford and Cambridge. That would serve new stations at Tempsford and Cambourne, and approach Cambridge from the south, enabling services to call at the new Cambridge South station and to serve the world-leading biomedical campus. As my hon. Friend the Member for South Cambridgeshire (Anthony Browne) mentioned, I was at the site a couple of weeks ago. It is absolutely fantastic; people are incredibly excited about what this railway will deliver through not just better connectivity but allowing more jobs to flow to the campus, enabling it to succeed and to take on the world’s finest. I am very excited to have been able to announce the funding.

The route update announcement is a milestone that reaffirms the Government’s commitment to the project, along with funding of £1.3 billion to deliver the first connection stage of East West Rail between Bicester and Bletchley. It is part of our national commitment to unlock transformative growth within the globally renowned Oxford-Cambridge hub of science, research and technology. It will transform connectivity for residents and businesses in addition to supporting economic growth and local housing plans. Again, I acknowledge the challenge that housing can deliver in that particular part of the country. The support from Cambridge University, biopharmaceutical companies such as AstraZeneca, Oxford University science park and local enterprise partnerships across the route demonstrates the confidence that key stakeholders and businesses have in the benefits of East West Rail.

With every project at this scale, important decisions must be made to optimise and maximise the benefits it can provide. The proposal to build new stations at Tempsford and Cambourne will enable communities to grow, provide opportunities to improve biodiversity and give people increasing access to green spaces, significantly outweighing the benefits that a St Neots station could provide. As I have stated, I recognise that the proposals will have an impact on some homes and businesses. In particular, I understand the concerns of residents immediately to the north of Bedford station.

The hon. Member for Bedford (Mohammad Yasin) mentioned a six-track rather than a four-track proposal. That is being put in place to regulate the disruptive performance on the existing Midland main line, as well as to mitigate congestion and provide options for future growth. It is an example of where we are building for the future, not just through East West Rail, but to deal with a spot of disruption that already exists. By going to the six-track proposal, we will deliver better infrastructure and a better service on both of those lines, though I do recognise that it has more of an impact on residents.

For local residents who are affected, East West Rail Company has launched a need to sell scheme, designed to support residents who have a compelling need to sell their property but are unable to do so other than at a substantially lower value because of the railway. On the point made by the hon. Member for Slough (Mr Dhesi) that I should meet the hon. Member for Bedford, I did that very recently. We discussed the case of one of his constituents and were able to talk about a solution. I continue to make myself available to all hon. Members on behalf of their constituents who are impacted.

East West Rail Company has also proposed to provide a new relocated station building at Bedford Midland, which will offer opportunities for local authorities to partner with East West Rail to deliver a destination station, if supported by third-party funding. Alongside that, the existing Bedford St Johns station will be relocated so that it is closer to Bedford Hospital, providing better connectivity for patients, hospital staff and visitors. Proposals for East West Rail will also mean a significant investment in the Marston Vale line between Bletchley and Bedford to provide a step change in the frequency of services.

As the House and my hon. Friend the Member for North East Bedfordshire will know, East West Rail Company is holding public information events to answer the questions that have been raised by Members on behalf of their constituents. It is also meeting with stakeholders along the line of route. I will take some of the questions that have been posed, particularly by my hon. Friend the Member for South Cambridgeshire about the design stage, and get responses to them.

A statutory consultation is planned for the first half of next year, in which the next stage of technical and operational design proposals will be presented alongside plans to mitigate any associated environmental impacts. East West Rail Company has committed to delivering a 10% biodiversity net gain across the entire project, and traction options such as full electrification along the whole line of route are currently being reviewed.

Phase 1, which goes from Oxford over to Bletchley, is a mix of an existing line and one that once was a railway line. Phase 2, from Bletchley to Bedford, is an existing line. In that sense, electrification is a more difficult challenge, because bridges and other infrastructure are already in place and would have to be significantly changed. Where we have built new bridges and infrastructure, we have done so with electrification for the future in mind, so there is that pathway available to it. Of course, we are looking toward hybrid options in future as far as trains are concerned, which would enable a better, decarbonised line of route. I know all hon. Members have mentioned that point.

The business case was also referenced. As is standard for a project of this size, a final business case will be put forward once planning consent is secured. Before then, a development consent order application will be prepared in accordance with the Planning Act 2008. East West Rail demonstrates the Government’s commitment to supporting growth and improving connectivity for people and business across the Oxford and Cambridge region.

Let me come to some of the points that were raised—my hon. Friends worked hard to raise as many as they could. The first question was, will I walk the line of route? I am not sure whether that is an invitation to walk the entire line of route or selected parts of it, but I am certainly able to say yes to the former—sorry, I should say the latter. I should get that right for Hansard. Yes, I will walk parts of the line of route so that my hon. Friend the Member for North East Bedfordshire can show me the areas that are impacted. Indeed, we did something similar when we looked at the options of coming into Cambridge from the north or going from Cambridge to the south, and I will of course do that in my hon. Friend’s constituency.

My hon. Friend mentioned the new Mayor, Tom Wootton. I met him and he laid out his arguments as to why he believes the line of route should come through the south rather than the north of Bedford. I have said I will write back to him to explain our thinking behind that and I am very happy to continue to liaise with him. We need to ensure that our case is the strongest case and cannot be rebutted, and that it is not only open and transparent but subject to challenges that will make it more robust. I am very keen to do that.

My hon. Friend also asked whether the National Audit Office will conduct an inquiry. We can consider that option. I always enjoyed working with the NAO when I was Chair of the Transport Committee; it has a lot of value to add when it comes to ensuring projects are built to time and cost. External assurance is provided by the Infrastructure and Projects Authority, whose next review is expected before the statutory consultation. It works as an external review body for the project.

My hon. Friend asked whether I will instruct East West Rail to release the maps. We can check what further information and detail can be provided. East West Rail does not yet have a detailed design for every single area, but where it has the details, it will publish them. It has done so in the Poets area of Bedford. I am very keen that we do that at the earliest opportunity to give residents and businesses impacted by the line as much clarity and detail as possible, so I will look at that point for my hon. Friend.

My hon. Friend’s fifth point was about writing to property owners about the current corridor. East West Rail has written to property owners about the route update announcement and will engage with them further in the lead-up to the statutory consultation. Again, I am committed to ensuring that more detail is provided. I will come back to my hon. Friend on all those points and the one or two that I have not addressed because I have not had the time.

The hon. Member for Cambridge (Daniel Zeichner) asked how much money has been spent on the Oxford-to-Cambridge road that was proposed and then stopped, and how many officials are still working on it. I can tell him that £28 million was spent on the development project, and there are no officials working on it right now. I hope he is impressed with that transparency and immediacy.

My hon. Friend the Member for South Cambridgeshire asked who will be responsible for producing the business case. It is East West Rail in partnership with the DFT. We will work closely with the Treasury to make sure that is properly done in the manner that one would expect. There was talk of the theory of change exercise. That methodology is validated by the Government. We have previously discussed the fact that the Green Book is not particularly good at taking into account regeneration and decarbonisation. Changes have now been made; I welcome them because they mean that transport, and certainly rail projects, score much higher. We will of course ensure that that is rigorous, and that the preparation is transparent. I note my hon. Friend’s expertise in this area from his academic background and his business work. I am keen to work with him to ensure the business case works and is in the right form. He can take that assurance.

The hon. Member for Slough visited Winslow. I did so too, and I was actually brought up a few miles away. I am a supporter of this project because when I went to the further education college in Aylesbury, I used to go over that bridge every day, and there was nothing going on underneath it. Now, as the hon. Gentleman is aware, there is a station that will be ready to be opened shortly, and off the back of that we have the housing and the school. The secondary school in Winslow closed down. I was at secondary school in Buckingham, and all the pupils had to be bussed over. That no longer has to happen, and it is the railway that has allowed that to be built. Winslow is a good example of the fact that, if we build the infrastructure, the rest follows.

I am keen to work with the hon. Member for Slough, because it is clear that he supports East West Rail and wants it delivered. I support his support, as it were. He talked about the electrification miles that have been built, but I have to correct the record. In the past 13 years, while we have been in government, 1,200 miles of railway has been electrified. In the previous 13 years, when the Labour party was in power, the figure was a paltry 63 miles. I am sure the hon. Gentleman will not wish to give me any lessons about how to electrify lines, because we are doing that.

Tanmanjeet Singh Dhesi Portrait Mr Dhesi
- Hansard - -

rose

Huw Merriman Portrait Huw Merriman
- Hansard - - - Excerpts

I know the hon. Gentleman is going to tell me that he will do a lot more in the future, but the trouble is that we only have Labour’s record to judge him on, not his future deeds. Go on, have a go.

Tanmanjeet Singh Dhesi Portrait Mr Dhesi
- Hansard - -

I would like to rebut what the Minister just said. I referred to what has been electrified in the past year, which is a mere 2.2 km of rail line. The Minister is right to point to the Conservative-led Governments’ record in the past 13 years, but having been Chair of the Transport Committee, he will also be aware that the previous Labour Government’s main priority was to invest tens of billions of pounds in our rolling stock to get rid of the old, inefficient trains that we inherited from the previous Conservative Government after 18 years of grinding public transport to a halt. Having got the rolling stock back up to full speed, the last decade has been a lost decade for electrification, which is what other European Governments have done. That is why I said that the Minister and the Conservative Government have been failing on electrification.

Huw Merriman Portrait Huw Merriman
- Hansard - - - Excerpts

That was more than an intervention. The reality is—

Tanmanjeet Singh Dhesi Portrait Mr Dhesi
- Hansard - -

It was a reality check!

Huw Merriman Portrait Huw Merriman
- Hansard - - - Excerpts

I am impressed with that argument, actually, that rather than electrifying lines—I am a big supporter of that, and we want to and will do more, as we have done 1,200 miles whereas, as I pointed out, in the previous 13 years Labour had done 63—there was a priority focus on rolling stock. That really is pulling the other one. We have been doing both during that whole process. If the hon. Member has been on an Azuma train, he will know full well that they have been delivered under our—

Oral Answers to Questions

Tanmanjeet Singh Dhesi Excerpts
Thursday 8th June 2023

(2 years, 9 months ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Lindsay Hoyle Portrait Mr Speaker
- Hansard - - - Excerpts

I call the shadow Minister.

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- View Speech - Hansard - -

I, too, convey my condolences to the families of the victims of the harrowing rail disaster in India.

The Government’s management of HS2 could hardly be worse: the budget has ballooned out of all proportion; we are already years behind on the launch of services; the merry-go-round of Ministers has created chaos; and the project at Euston station may never see the light of day. The six-monthly update to Parliament is already months late. We are none the wiser about the promised excellent alternative to the cancelled Golborne link, and we have been waiting years for the review into the best way to run HS2 to Leeds after this Government betrayed the north by scrapping the eastern leg. It appears that trickle-down economics has been replaced by trickle-down incompetence. Rather than the usual woolly ministerial responses of “coming soon to a station near you” and rather than responding to all of these failures, can the Minister answer just one simple question: when will the Leeds area study finally be published?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - - - Excerpts

The ministerial merry-go-round goes round to a Merriman to listen to yet another long-winded effort from the hon. Gentleman, which eventually turns into a question. The reality is that we remain committed to HS2 and to line of route from London all the way up to Manchester. He talks about ballooning costs, but we have tried to look at the cost estimate and rephase HS2 as a result. He cannot have it both ways. I am committed to ensuring that the study comes out very soon; I met with my right hon. Friend the Chief Secretary to the Treasury to work on the matter and we work closely together. Our aim is to ensure that when that study comes out, it has the imagination in it to deliver properly all the ideas that we had always intended, and we will do so. We are committed to HS2 and to the investment and decarbonisation it will bring. I am sorry there has been a change of Ministers, but I can tell the hon. Gentleman that there will not be any changes any time soon.

Heathrow Airport Expansion

Tanmanjeet Singh Dhesi Excerpts
Wednesday 24th May 2023

(2 years, 10 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- Hansard - -

I am grateful to my hon. Friend for securing today’s important debate on Heathrow airport expansion. No talk of expansion can be complete without first addressing the surface access requirements to decongest the roads around Heathrow and to improve the environment. More than a decade ago, the Government committed to building the western rail link to Heathrow. The successful business case was predicated on a two-runway scenario. A third runway, if it was built, would make the scheme critical; however, not a single spade has been dug into the ground. Does my hon. Friend agree that this No. 1 infrastructure priority for the Thames valley region, which has the support of the Welsh Government and others in the south and west—including in my Slough constituency—must finally be built without further procrastination by the Government?

Fleur Anderson Portrait Fleur Anderson
- Hansard - - - Excerpts

I thank my hon. Friend for his helpful intervention. An expanded Heathrow would see an additional 175,000 trips every day. That is more than the daily rail arrivals to the whole of Birmingham, yet the proposal does not have a plan for how to deal with it. I shall say more on that later. My hon. Friend is absolutely right.

What about green aviation? We are told that green aviation and green tech will catch up. Are we close to the breakthrough in alternative fuels, carbon capture or battery-powered planes that would make an expanded Heathrow sustainable and viable? No, we are not. In 2010, the aviation industry pledged to source 10% of its fuels from sustainable sources by 2020. We are in 2023; how is that going? Only 0.05% are sustainable fuels. There are no electric aircraft currently in development that could be commercially viable for long-haul flights. The green aviation revolution that could make the Heathrow expansion environmentally viable is a long way from taking off.

So what is the case against? I will talk about climate change, air quality, noise and transport. First, on climate change, the expansion is fundamentally incompatible with the Government’s own net zero target. Heathrow is the largest single polluter in the UK. Its emissions account for half of all UK aviation emissions. Its expansion proposals of 260,000 additional flights a year, on top of the existing 480,000, will increase carbon dioxide emissions from air travel by a staggering 9 million tonnes a year. As I said, that is more than the entire carbon emissions of Luxembourg.

The Government recently published their jet zero strategy; is that the answer? No. The strategy makes no attempt to set out what share of the transport carbon budget the aviation sector should be allocated or how that would be divided between airports, and it fails to articulate circumstances in which airport expansions could be compatible with climate change targets. Heathrow is just one of many airports across the UK with ambitions to expand, yet the Government has no overarching framework to guide airport expansion plans throughout the country.

Oral Answers to Questions

Tanmanjeet Singh Dhesi Excerpts
Thursday 20th April 2023

(2 years, 11 months ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Lindsay Hoyle Portrait Mr Speaker
- Hansard - - - Excerpts

I call the shadow Minister.

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- View Speech - Hansard - -

When it comes to railway reform, the Conservative Government seem to know only two approaches—hike up fares and cut railways back to the bone. They are not content with slashing services, cancelling investment and reducing reliability: a leaked Network Rail report reveals that the Government want to cut funding to such a dangerous level that it will be unable to “operate, maintain and renew” tracks and bridges. On top of that, a £3 billion risk fund to help in emergencies such as severe weather will also be cut. Fewer repairs mean more obstructions, risking more delays and accidents and more compensation to private operators. Why are Ministers so passionately committed to making our railways less reliable and ever more expensive? Have the public not suffered enough already?

Lord Harper Portrait Mr Harper
- View Speech - Hansard - - - Excerpts

That was an extraordinary question, containing not a single fact. The Government have provided a record £44.1 billion settlement for Network Rail in control period 7—in English, that is between April 2024 to March 2029. Compared with the previous control period, that is a 4% increase in real terms when compared on a like-for-like basis, and an above-inflation settlement during a highly challenging fiscal environment. That demonstrates our continued commitment to running and maintaining vital railway infrastructure.

Oral Answers to Questions

Tanmanjeet Singh Dhesi Excerpts
Thursday 2nd March 2023

(3 years, 1 month ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- View Speech - Hansard - -

First, may I pay my respects following the tragic rail crash in Greece? I am sure that the thoughts and prayers of the whole House will be with our Greek friends.

Last year, the Minister oversaw timetable changes on Southeastern routes, but the Government refused to consult on those changes because they did not want to listen to passengers. In a parliamentary debate in December, secured by my hon. Friend the Member for Eltham (Clive Efford), I and indeed hon. Members from across the House warned the Minister that the upcoming changes and cancellations of Southeastern routes would be bad for passengers and would lead to overcrowding, but he did not listen. Now that these changes have caused the predictable chaos he was warned about, will the Minister finally listen and end the misery this Government are inflicting upon Southeastern passengers?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - - - Excerpts

That is patently not the case, because during that debate I made it quite clear that consultations would be better than they had been. I also made it quite clear that I would listen and, if the case were made to change the timetable, I would do so. This morning—obviously, earlier than the lines that have been written—we announced that these changes had been made. In fact, the very first individuals to be made aware of that were the MPs. They have had that information first; it is important to me that they receive that information first. We will continue to listen and learn. We had to make savings on Southeastern, and £10 million was taken off. The savings are because season tickets collapsed to 32% of pre-covid levels. If the hon. Member is pledging to fund the railway no matter what and make no changes—

Electric Vehicles: Infrastructure

Tanmanjeet Singh Dhesi Excerpts
Wednesday 22nd February 2023

(3 years, 1 month ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- Hansard - -

It is a pleasure to serve under your chairmanship, Mr Bone. I congratulate the hon. Member for Winchester (Steve Brine) on securing this debate on electric vehicle infrastructure cost and availability, and thank him for providing an opportunity to draw attention to this vital issue. Climate change presents one of the biggest threats and greatest challenges facing humanity. However, the greatest barrier to progress today is not climate denial, but climate delay. We are at a critical juncture in our journey to legally binding net zero targets. Now is the time for bold and ambitious policy that will unleash the huge opportunities that the transition offers, but that is a far cry from the reality under this Government.

Tahir Ali Portrait Tahir Ali
- Hansard - - - Excerpts

Does my hon. Friend agree that so much has been promised by Government on this issue, but in so many constituencies—including my constituency of Birmingham, Hall Green—people are missing out on being part of delivering the climate change agenda? When will the Government deliver on those promises by delivering EV charging points for many households?

Tanmanjeet Singh Dhesi Portrait Mr Dhesi
- Hansard - -

I thank my hon. Friend, who is an amazing champion for his constituents. I could not agree with him more. In fact, I will be delving into that very topic —regional disparity—later in my speech.

As the largest emitting sector in respect of greenhouse gas emissions, transport has a crucial role to play in getting to net zero. In 2020, transport accounted for almost a quarter of total emissions, at a time when the pandemic meant that domestic travel was at just a fraction of usual levels. Petrol car journeys produce similar emissions per capita to aeroplanes—that is a startling fact—and over three times more than electric cars. Therefore, ramping up the transition to EVs is imperative if we are to meet our climate goals. But the roll-out of electric vehicles is only as good as the roll-out of the charging infrastructure supporting it. There is no time to lose, as the EV enthusiast, the hon. Member for South West Bedfordshire (Andrew Selous), explained, along with pointing out the VAT anomaly for charging outside one’s house. It is of course true that most drivers charge their EVs at home, but even those with home chargers need to be able to rely on a nationwide charging network, or they will be held back by range anxiety. In addition, we must not forget the estimated one third of households without access to off-street parking. They must not be left behind. Charging at home or a workplace has a huge role to play, but it is no alternative to a truly nationwide and reliable public charging network.

This Government are asleep at the wheel while the UK falls behind on the infrastructure that motorists need. The hon. Member for North Antrim (Ian Paisley) highlighted, as did the SNP spokesperson, the hon. Member for Paisley and Renfrewshire North (Gavin Newlands), that areas such as Northern Ireland are being failed and left behind. My hon. Friend the Member for Warwick and Leamington (Matt Western), the chair of the all-party parliamentary group, highlighted how we are falling further and further behind our European neighbours.

As my hon. Friend the Member for Bristol East (Kerry McCarthy) eloquently highlighted—in a very powerful speech, because she speaks with a great deal of experience on this matter—we need to install 37,000 charging devices a year to meet the Government’s own target of 300,000 by 2030. However, last year we achieved just a quarter of that. At the current pace, Ministers will miss their own target by a staggering 20 years. There are now 30 electric vehicles for every charging device, compared with 16 at the start of 2020. Motoring groups have been calling for a mandate on the installation of charging devices, to complement the upcoming net zero emission vehicle mandate. Motorists and manufacturers alike are crying out for clarity on the timescale for the transition to electric cars and charging infrastructure. Will the Minister consider targets in this area? I look forward to hearing his views on that.

Furthermore, the public charging devices that are available are highly concentrated in London, at the expense of the north and other areas of our country. There are now more public charging devices in Westminster alone than in 11 of the biggest northern cities combined, and this gap is stretching out wider still. Over the last three months, for example, more devices have been installed in Westminster than in any English region outside London. While this Government sit on their hands, the regional divide continues to get worse and worse. If the Government do not get a grip on this, those in more rural and less affluent areas are destined to be excluded from this transition, as was ably demonstrated by the hon. Members for Caithness, Sutherland and Easter Ross (Jamie Stone) and for Bath (Wera Hobhouse).

Even when motorists are able to find a charging device, all too often they find out that it is too expensive, complicated to use, or not even working. Research carried out by the RAC showed that the cost of rapid charging on the public network rose by 50% in the eight months up to January 2023. Indeed, the AA has warned that the cost of public charging could become comparable to high-emission alternatives. That should be a huge cause for concern. Cheaper running costs are a major selling point for switching to electric vehicles. To lose that means risking the transition.

Turning to consumer experience, many have called for stronger regulation to standardise payment methods, and set minimum standards, so that public charging is as simple as filling up a petrol tank. It is unacceptable that many charging devices do not accept contactless card payments and force users to download an app or carry multiple membership cards. I can attest to that from my own experiences of driving my electric car. That would not be tolerated in any other industry and puts up yet another barrier to the transition.

In addition, all too often charging devices are not acceptable for people with disabilities. That must urgently be addressed, if we are to achieve a just transition. We welcome commitments made in the EV infrastructure strategy for new consumer experience regulations. In particular, it is vital that proposals for a 99% uptime requirement are followed through. Will the Minister confirm that those commitments will be delivered in full, and that there will be no scaling back? Will he also provide a timescale for their implementation? It is imperative that these crucial steps are not watered down or kicked into the long grass.

On funding, will the Minister take this opportunity to announce when the local electric vehicle infrastructure scheme will be up and running? Many local authorities are awaiting this funding to get their own roll-out going, particularly in areas where the business case for the private sector is weak. When will the rapid charge fund, first announced years ago, finally be delivered?

More widely, there are a number of other factors threatening an effective transition to EVs. As my hon. Friends the Member for Ellesmere Port and Neston (Justin Madders) and the Member for Luton South (Rachel Hopkins) rightly lamented, car manufacturers are being left in limbo by the lack of clarity from the Government on their zero-emission vehicle mandate. The mandate will come into force in less than a year, but 11 months out we are still waiting for details on what the mandate will be and what penalties it will carry. That uncertainty is adding to the challenges facing the car industry. Will the Minister confirm when the Government will finally respond to the ZEV mandate consultation? Delay after delay and a lack of clarity risk stalling the transition to electric, and reversing the momentum built up behind it. Manufacturers and motorists need confidence in a reliable, affordable and accessible nationwide network of charging infrastructure.

Labour stands ready to turbocharge the electric vehicle roll-out. A Labour Government will support new gigafactories, leveraging private sector investment and creating thousands of British jobs. We will offer interest-free loans for new and used EVs, to those on low and middle incomes. We will support a truly nationwide and accessible charging network, so that range anxiety is ended everywhere and for everyone. We stand on the precipice of a major change to the way people drive. In under seven years, the sale of new purely petrol and diesel cars will end. Motorists and manufacturers are ready to make the switch, but they need a Government who are ready to make the switch. This Government have failed to rise to the challenge. Labour has a plan, and a Labour Government will deliver on that plan.

Restoring Your Railway Fund

Tanmanjeet Singh Dhesi Excerpts
Tuesday 24th January 2023

(3 years, 2 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- Hansard - -

It is a pleasure to serve under your chairship again, Mrs Cummins. I congratulate the hon. Member for Torbay (Kevin Foster) on securing this important debate on the restoring your railway fund via the Backbench Business Committee. I commend all the hon. Members who have spoken so passionately on behalf of their constituents about exactly why their areas deserve funding for railway lines and how that would help to boost local economies and reinvigorate local communities.

The restoring your railway scheme has noble aims of connecting long-neglected towns and villages to the railways and investing in local infrastructure. Indeed, successful bids can deliver real opportunities for locals. However, the scheme’s execution, just like that of the so-called levelling-up funding across our nation, has been a competitive, chaotic and careless mess. Sadly, the reality of the scheme is that it barely scratches the surface. I commend the principle of expanding our network, but the fund fails to tackle the major issues that affect UK rail. It lacks vision, coherence and a long-term plan. The restoring your railway fund seems to be an apt metaphor for this Conservative Government.

The reality facing passengers is that train services are later, less frequent and more expensive than ever. Piecemeal extensions of lines and renovations of stations provide a select few with improved services, but without a comprehensive transport plan or vision, I fear that the projects will not reach their full potential. The Government are failing to deliver even this paltry offering. When £500 million was allocated to the scheme in January 2020, the then Transport Secretary, the right hon. Member for Welwyn Hatfield (Grant Shapps), stated that delivering it would ensure that, after the Beeching cuts,

“more than half a century of isolation is undone.”

However, just last week, the current rail Minister told the Transport Committee that we should manage our expectations, and noted that it is unlikely that the Government will be able to deliver most of the funding bids. Will the Minister clarify which schemes are at risk? The scheme looks like another perfect example of this Conservative Government over-promising and under-delivering.

Instead of slapdash spending and flashy competitions, our railways need a proper long-term strategy and leadership. We need proper investment. The Government’s strategy is equivalent to keeping their fingers crossed and hoping for the best. Perhaps that is their calling card, given their shambolic handling of the recent rail strikes. The future of our transport is too important to leave to chance. Under this Government, there is little comprehensive strategy. They have demonstrated that clearly with Great British Railways. Since its launch, we have been told that GBR will revitalise our railways, improve our services and advance our infrastructure, but what do we hear from the Government today? Absolutely nothing. After all this time, we have not even heard where the organisation might be based, and Ministers have admitted that there is no prospect of any GBR legislation in the transport Bill in this parliamentary Session.

What about HS2? What happened to the more than 60 promises made by Ministers on the delivery of the eastern leg? HS2 will not be delivered in full. What about delivering Northern Powerhouse Rail in full? How about an annual rolling programme of electrification of our railway lines? And where is the annual rail network enhancements pipeline?

To make matters worse, after 13 years of cuts, cuts, cuts, we are being promised even more cuts. Network Rail is being forced to make £4 billion of efficiencies in the next few years, and it has been reported that train operating companies expect to cut their budgets by over 10%. It does not take an industry expert to know what that will mean: fewer services, further increases in fares, and job cuts.

Our railways provide a unique opportunity to connect our nations and regions. With the right investment and vision, we can unleash the economic potential of our great towns and cities. I am sure that is a sentiment the new Rail Minister agrees with, so perhaps he could enlighten us about his long-term vision for tackling regional disparities across our railways and about whether he, unlike his predecessor, hopes to offer more than just short-sighted contests and managed decline.

--- Later in debate ---
Huw Merriman Portrait Huw Merriman
- Hansard - - - Excerpts

I thank my hon. Friend for his point and for his work on the Transport Committee. I will indeed look at the issue in that regard. It is important that the business case has a good cost-benefit ratio, but it is not just the direct return on money that matters; following the reform of the Green Book rules, one also needs to consider—this is great news—what projects do for regeneration and decarbonisation, and these projects deliver on both fronts.

As hon. Members will appreciate, the restoring your railway fund is heavily over-subscribed. My Department received nearly 200 bids—200 excellent bids—to the ideas fund element of the programme alone. We also reviewed proposals whose business cases were already in their advanced stages, such as the Northumberland line and the Bristol to Portishead line, along with existing proposals to introduce a number of new stations under the new stations fund element.

On the points raised by the hon. Member for Slough (Mr Dhesi), I gently remind him that eight schemes under the restoring your railway fund are being delivered; 13 are progressing past the strategic outline business case towards their full business case; and 23 projects have been taken through the ideas fund stage. So I did not recognise the part of his speech where he said that not much appeared to have been delivered. And one of my hon. Friends said, the beauty of this fund is that one gains the buy-in of the local community, local Members of Parliament lead things, and schemes are decided from the grassroots up, not from the top down, which I dare say would be more the line of thinking of the hon. Member for Slough.

Tanmanjeet Singh Dhesi Portrait Mr Dhesi
- Hansard - -

Will the Minister give way?

Huw Merriman Portrait Huw Merriman
- Hansard - - - Excerpts

I will not give way, because I have quite a lot to go through.

I appreciate that many hon. Members—particularly those who have sponsored individual proposals—will have received disappointing news along the way about their schemes not progressing under the restoring your railway programme, although hopefully with constructive and detailed feedback. I hope that the process has been helpful in allowing promoters of projects all over the country to develop their cases.

The hon. Member for Slough also mentioned my contribution to last week’s Transport Committee, which I was very pleased to attend. As I mentioned, we need to be mindful of the fact that it will not be possible for all schemes in the restoring your railway portfolio to progress to the next stage of development. The fact is that we do not have a limitless budget; indeed, although schemes may show promise at an early stage of their business case, some may not be able to cover their operational costs in the long term, and we should not add greater cost to the railways, given how stretched the finances are. When one looks at the schemes that are already being delivered or that are moving to the full business case, one gets quickly to £500 million halfway down the list, so I do want to manage expectations. At the same time, however, that demonstrates that we are getting on with things and spending the fund’s money. We should also be mindful of the wider context of the rail portfolio, where all projects face increasing costs for a variety of reasons, particularly inflation.

Hon. Members should know that I have asked my officials to carry out a review of all the schemes in the restoring your railway portfolio to prioritise the most viable projects for the next stage. That is particularly important in the light of the remaining budget we have available, so that we deliver the most we can under the challenging financial constraints we all have to live with. I emphasise that the process will be driven by data, expertise and careful consideration—that goes back to the third point my hon. Friend the Member for Torbay made, about how we will determine matters. I also assure hon. Members waiting to hear back about bids made to the second and third rounds of the ideas fund element of restoring your railway that those bids are being fully and fairly considered as part of the overall review process.

I want now to respond to the excellent points, cases and pitches that have been made this morning. First, with regard to my hon. Friend the Member for Sedgefield (Paul Howell), the Ferryhill project received further funding in June 2022. Sedgefield station is a possible additional stop between Ferryhill and Middlesbrough, and it is under consideration.

I thank the hon. Member for Tiverton and Honiton (Richard Foord) for his kind words. As he noted, the Wellington and Cullompton project is progressing to a full business case, and a decision will be made once that has been finalised.

In her brilliant speech, my hon. Friend the Member for Stourbridge (Suzanne Webb) made a pitch for Stourbridge and Round Oak, and it is hard—wellies or no wellies—to resist the points that she made. I know that the bid was not successful in the first ideas round stage, and I hope there has been feedback about what more can be done. I am happy to meet her to go through matters, and I really note—as should her constituents—the passionate pitch she has made.

My hon. Friend the Member for Stroud (Siobhan Baillie) referred to the Stonehouse Bristol Road station. The Department is reviewing strategic outline business case, and we will get back to her.

As ever, brilliant speeches were made by my hon. Friends the Members for Stoke-on-Trent North (Jonathan Gullis) and for Stoke-on-Trent South (Jack Brereton), who made a great pitch for the Stoke-Leek line. That is an ideas fund 3 project, and the strategic outline business case is being reviewed by the Department. I know that my hon. Friends will keep on at me in that regard, and my hon. Friend the Member for Stoke-on-Trent South should be assured that Meir station has been funded to full business case. That was announced in June 2022.

The Leamside project is championed by my hon. Friend the Member for Darlington (Peter Gibson); it is also being talked about outside this place, and I was delighted to meet Members from across the north-east yesterday in that regard. My hon. Friend specifically mentioned the Darlington to Weardale project. That is also in ideas fund 3. We are reviewing the strategic outline business case, and I thank him for the passionate points he made to champion the project.

Every time there is a rail debate, my hon. Friend the Member for Ynys Môn (Virginia Crosbie) is here making the case for her constituents. Despite the spelling of my first name, I will not try to pronounce the names of the projects, but I will tell her, more importantly, that the strategic outline business case, having gone through ideas fund 3, is being reviewed. I am already on my way to see her with regard to other projects, and I am sure I will bring the wellies and we will tramp through. To continue the welly references, my hon. Friend the Member for North Devon (Selaine Saxby) is a real champion for transport and Combe rail. I know it was unsuccessful in the ideas fund, but I want to talk with her to find out what more we can do.

I want to respond to two other points made by my hon. Friend the Member for Torbay. On what happens when local stakeholders do not support a bid, the beauty of these applications is that we want people to be able to crack on at pace. Obviously, it is challenging when one part of the stakeholder community is not willing to support a bid. That applies in particular if a planning authority is involved. I note the points made by my hon. Friend, who comes up with some brilliant ideas and suggestions. I hope his council will think again and join the local stakeholder community in supporting his bid.

My hon. Friend also asked me to recommit to the fund. I recommit to that fund; it is a brilliant scheme that allows MPs and community members to get involved and get back the railways they lost many years ago. I want to finish by congratulating him again—

Oral Answers to Questions

Tanmanjeet Singh Dhesi Excerpts
Thursday 19th January 2023

(3 years, 2 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lindsay Hoyle Portrait Mr Speaker
- Hansard - - - Excerpts

I call the shadow Minister.

Tanmanjeet Singh Dhesi Portrait Mr Tanmanjeet Singh Dhesi (Slough) (Lab)
- Hansard - -

Neither passengers nor hard-working staff are happy with the lamentable state of our railways on this Government’s watch. They have bumped up ticket prices twice as fast as wages have grown, yet passengers are experiencing delays and cancellations to most services at Britain’s busiest stations, with experts declaring that our rail system is broken. So what is their plan to fix the mess they have made? If the Financial Times is correct, their big solution is to impose even more devastating funding cuts of more than 10% on train operators. Forget managed decline: in 2023 it looks more like freefall decline. Rather than this veil of secrecy over steep service cuts, can the Minister confirm how much of a cut he is imposing?

Huw Merriman Portrait Huw Merriman
- Hansard - - - Excerpts

The hon. Gentleman will be aware that passenger numbers are at about 80% of where they were pre-pandemic. The timetable is at about 90%, so it continues to run ahead of passenger numbers. Taxpayers more broadly have put in £31 billion over the last two years to support the railway, and there will be a further £11 billion required for the year to come. We have a balance between those who use the railways, continuing to ensure that they can do so, and those who fund the railways and the difficulties they have in meeting their tax bills. I look forward to his optimism and enthusiasm in working with me to ensure that railway services improve, as I am determined they will.