(11 months, 3 weeks ago)
Public Bill CommitteesI thank the hon. Gentleman for that important intervention. I will turn to the substance of the amendment before I get into trouble, Mrs Hobhouse.
The amendment seeks to set the level of benefit at £1,000 per year over 10 years. First, I should say I welcome the fact that across the Committee today there is support for that principle. That is really important, because the principle that we want to recognise—to be fair, the previous Government did when they launched the consultation—is that if we host nationally important energy infrastructure, particularly transmission infra-structure, which so often has less of a community benefit in the communities that it passes through, there should be some benefit from it. That is a really important point.
The balance that we sought to strike was to find a way to give a benefit to those households affected by the transmission infrastructure, but also make sure that the wider bill payers across the country that will pay for those community benefits are not saddled with a significant bill as a result. So the balance that we struck was £250 per year over 10 years. I would never seek to question the House of Commons Library, but I think perhaps the hon. Member for Broxbourne might not be correct in his interpretation of its figures. It would be £2,500 over the course of the 10 years that the scheme would be in place. I think that is what he was referring to.
In our view, the point here is that this still provides a significant benefit regarding bills for those households for a substantial amount of time—10 years—but at the same time does not result in significant amounts being added to the bills of other people right across the country who will pay for this. We think £1,000—which we looked at carefully as part of this process—is too much.
Ellie Chowns (North Herefordshire) (Green)
I thank the Minister, and I absolutely recognise the importance of the principle of community benefit. However, would he not agree with me that it becomes problematic if we put in specific numbers, such as £250 or £1,000 a year? Inflation will change what that means, so is it not more relevant and logical to place a requirement more like the amendment advocated by the hon. Member for Taunton and Wellington, which talks about a community dividend that is in proportion to the revenues generated by the project rather than an absolute number?
I thank the hon. Lady for that point; I will come to the new clause shortly. The difficulty with that approach for transmission infrastructure is that by definition it goes through so many different communities in a linear way that it would be really difficult to divide up that funding among communities. How you define each community is quite challenging, whereas defining households that are within a certain distance of pylons, for example, is very easy, and we want to give a direct benefit to those households.
Ellie Chowns
Logically, we could divide by the number of miles of transmission infrastructure in each community.
I understand the point that the hon. Lady is making, but a transmission line goes through a significant number of communities in a linear way. For a wind farm, you could draw a line around it and benefit all those communities; a transmission line does not work that way, so we would be giving to a significant number of communities who have maybe one or two pylons near them. That is why we think what is most important is that the households closest to the infrastructure get the direct community benefit.
To the point made by my hon. Friend the Member for Basingstoke, this is not the only part of the Bill—we will also have a community benefits fund for infrastructure like substations, where if there is one particular piece of infrastructure built in a community, with all the disruption that goes with building that, wider community benefits come from that as well. It is not one or the other; we are doing both, but in a legislative sense, we only have to legislate on the Bill discount scheme, which is what we are talking about in this amendment.
The shadow Minister asked for detail on some important points—including that we should set out in secondary legislation the specific level of benefit and the duration over which it will be paid. Of course, the £250 a year is a “minded to” position that we have come to as a result of the consultation that the previous Government did and the evidence that we have seen, but that will be set out in secondary legislation, which—to the hon. Lady’s point—allows us to alter that over time if the scheme is successful. This is, in some ways, a trial to find out whether the intended policy outcomes result. I hope that for those reasons—I will come to some others—the hon. Member for Hamble Valley might withdraw his amendment.
Clause 22 is about creating a financial benefit scheme for eligible households living near certain new or significant increases in network transmission infrastructure, and inserts new sections into the Electricity Act 1989. It empowers the Secretary of State to establish and determine the overall design of the scheme, including qualification criteria, scheme administration, enforcement, and provisions requiring the benefit to be passed on.
The “pass-through provision” is outlined in new section 38B(2), and is essential to ensure that the right consumers benefit and to ensure that when an intermediary sits between the electricity supplier and the end user—as happens in some cases—the intermediary will be required to obtain the full benefit and then pass it on to the end user. If this is not complied with, new section 38B(3) allows regulations to provide for the withdrawal or recovery of benefits made to intermediaries.
To enforce compliance with the scheme, new section 38C details the enforcement provisions that may be made in regulations, and I hope this answers the shadow Minister’s point around potential fraud in the system and the imposition of penalties that we will make through secondary legislation for instances of regulations not being complied with. Finally, new section 38D deals with provisions around data collection for the purposes of administering the scheme. Overall, it is worth remembering the purpose of this clause: it is to improve the public acceptability of network transmission infrastructure.
(1 year ago)
Public Bill CommitteesLet me be clear. I appreciate the concerns that hon. Members have expressed. I hope that I can provide some reassurance, but I am more than happy to have further exchanges on this point, which is an important one.
The clause introduces a new streamlined procedure for making material policy amendments to national policy statements, where the proposed amendments fall into four categories of changes to be made since the NPPS was last reviewed: reflecting legislative changes or revocations that have already come into force; relevant court decisions that have already been issued; Government policy that has already been published; and changes to other documents referred to in the NPPS.
A good example is our recent changes to the national planning policy framework—consulted on publicly and subject to a significant amount of scrutiny in the House. If a relevant NPPS had to be updated to reflect some of those policy changes, which have already been subject to consultation and scrutiny on their own terms, as I said, that would be a good example of where this reflective procedure might be useful.
The primary aim of the clause is to expedite the Parliamentary process for updating national policy statements. By doing so, it ensures that amendments that have already undergone public and parliamentary scrutiny can be integrated more swiftly into the relevant NPPS. In enabling reflective amendments to be made, the new procedure will support the Government’s growth mission by ensuring that NPPSs are current and relevant, increasing certainty for developers and investors, and streamlining decision making for nationally significant infrastructure projects.
Hon. Members should be assured that, where applicable, the statutory and regulatory prerequisites of an appraisal of sustainability and habitats regulation assessment will continue to apply to amendments that fall within this definition, as will the existing publication and consultation requirements for material changes to a national policy statement. The clause does, however—this is the point of debate that we have just had—disapply the requirements for the Secretary of State to respond to resolutions made by Parliament or its Committees. We believe that change is necessary to enable reflective changes to be made to NPSs in a more timely and proportionate manner.
I will give way in one second, if the hon. Member will allow me, because I think this is some useful context for some of the discussions that have taken place over recent months.
The Government are grateful to my hon. Friend the Member for Hackney South and Shoreditch (Dame Meg Hillier) and the relevant Select Committee Clerks for engaging with me and my officials on the implications of the new procedure. We have agreed on certain guarantees to ensure that there will still be adequate parliamentary scrutiny when the procedure is used.
As such, I am happy to restate today that, when the Government intend to use the reflective amendment route to update a national policy statement, we will write to the relevant Select Committee at the start of the consultation period. We would hope in all instances that the Select Committee responds in a prompt and timely manner, allowing us to take on board its comments. Ministers will make themselves available to speak at the Committee during that period, in so far as that is practical.
The process retains scope for Parliament to raise matters with the Government in the usual fashion. Should a Select Committee publish a report within the relevant timeframes of the public consultation period—in a sense, that is one of the challenges we are trying to get at here: not all select Committees will respond in the relevant period, therefore elongating the process by which the reflective amendment needs to take place—the Government will obviously take those views into account before the updated statement is laid before the House in the usual manner.
Ellie Chowns
I thank the Minister for reminding us that we are talking about a specific amendment to a specific clause about a specific thing. But the issue that is at stake here was communicated by his complaint that parliamentary process might slow things down. Surely, the whole point of Parliament is to make our laws. I am worried by the implication that Government see Parliament as a hindrance to getting things done, rather than as a crucial part of scrutiny and checks and balances. If the Minister has concerns about timescales, it is perfectly achievable to address those by setting timeframes. But the removal of the clause that requires the Government to pay attention to the views of cross-party Committees scrutinising particular statements is concerning.
Gideon Amos
This set of amendments is, at first sight, very sweeping and broad, as it will remove large sections of the Planning Act 2008. However, we have some sympathy with the Government. Provisions were put into the Act to proscribe dangerous commissioners who might make decisions without proper scrutiny. Given that the decisions reverted to the Secretary of State in 2011, it seems that a number of them may not be needed.
None the less, it is important to ensure that consultation is meaningful and of high quality. In place of the Planning Act provisions, we want a consultation test on the face of the Bill; if the machinery of the Committee so allows, we would like to table an amendment along those lines. If there is no test at all for meaningful consultation in NSIPs, these amendments would simply remove a great number of requirements for consultation without putting anything in their place. We should be moving from a set of sections in the Act that are about the mechanics of consultation to a qualitative test: consultation should be meaningful, and people should have had the opportunity to be consulted.
We would like to see the key principles in the guidance on the face of the Bill. That is the spirit in which we will respond to the amendments. We hope to be able to bring forward proposals for the Committee to consider.
Ellie Chowns
It is a pleasure to serve under your chairship, Mrs Hobhouse, as I should have said earlier. There are three reasons why I, too, have concerns about new clauses 44 and 45 and the removal of the requirement for pre-application consultation.
First, pre-application consultation is often a very useful process, as a way of highlighting and addressing issues between developers and other stakeholders before we get to the formal, structured, legalistic processes. There was a case in Suffolk in which engagement between the Wildlife Trust and National Grid resulted in the trust’s concerns being addressed in such a way that they did not have to be raised in a more legalistic way later in the process. Pre-application consultation is useful and productive for all parties. It is not for developers to decide whether pre-application consultation will be useful in a particular case, but there should be a statutory requirement for key stakeholders, such as local authorities, to be consulted in that way.
My second concern is that the replacement guidance requirements set out in new clause 45 do not provide sufficient clarity for developers, communities and other stakeholders, or for the Planning Inspectorate, on what pre-application engagement is required specifically, because the wording is too vague to provide sufficient clarity. “Have regard to” is a relatively weak duty, while
“what the Secretary of State considers to be best practice in terms of the steps they might take”
is very vague language. It would be open to interpretation and potentially to contestation, which could be unhelpful to speeding up the process in the way we seek.
My third concern, notwithstanding individual examples of processes that might have been held up, is that generally speaking pre-application consultation and public engagement is not the main constraint on the rapid processing of such applications. I understand that research conducted by Cavendish in 2024 looked at DCO consent times from 2011 to 2023. It found that for the first 70 projects going through the DCO process up until 2017, the response time was pretty reasonable. What changed in 2017? It was not the pre-application consultation requirements, which remained the same throughout the process.
Political chaos is what caused the change. Cavendish’s report identifies that it was political turmoil and manoeuvring that caused delays to happen once projects reached the Secretary of State’s desk—I see my Conservative colleague, the hon. Member for Ruislip, Northwood and Pinner, nodding. Who was in government at that time? We had the turnover of Prime Ministers, Ministers and so forth. Bearing all that in mind—the fact that pre-application consultation is a very useful way of deconflicting issues of contestation, the fact that the replacement guidance is so vague as to be unhelpful and itself probably subject to test, and the fact that this is the wrong solution to the problem of delays—I am concerned.
John Grady
I am grateful. It is a pleasure to serve under your chairship, Mrs Hobhouse.
Is the hon. Member disagreeing with the evidence that we heard from Catherine Howard, one of the most eminent planning lawyers in the United Kingdom? Catherine Howard said:
“We cannot magic up more comms consultants, lawyers, environmental impact assessment consultants and planning consultants in that period, so we desperately need a way to apply those professionals most efficiently in a really focused way across all the projects we need.”
She then went on to talk about the pre-app process, which has gone up from 14 months to 27 months:
“I suspect it is even longer now…The pre-app is always something I feel I have to apologise for and explain, and give the best story about how quick it might be”.––[Official Report, Planning and Infrastructure Public Bill Committee, 24 April 2025; c. 67, Q86.]
She explained that investors welcome this change. The pre-application process, in the mind of investors who want to invest in clean energy projects that lower carbon emissions and other critical infrastructure, is a very material source of delays, according to that witness.
Ellie Chowns
I thank the hon. Gentleman for his intervention. I would observe that generally speaking the way oral evidence sessions work is that the Government decide who they want to come and give evidence to support the arguments that they wish to put forward in Committee, so I am not all that surprised that we might have heard that evidence. I am not discounting what the witness said, but I am suggesting that there are other ways to look at it. A blanket removal of the pre-app consultation process with stakeholders who have a huge stake in applications, such as local authorities, is an excessively blanket position to take.
Gideon Amos
Would the hon. Member support a test in the Bill of the quality of the consultation carried out, in place of the mechanistic requirements in the previous Act? They do not actually exist in the Town and Country Planning Act, for example, and normal planning processes.
Ellie Chowns
Indeed, and I noted the hon. Gentleman’s comments about bringing forward a proposal about meaningful consultation. I would very much welcome looking at that. I think that would help to address the concerns being raised here.
Luke Murphy (Basingstoke) (Lab)
It is a pleasure to serve under your chairship, Mrs Hobhouse. I note the hon. Member’s comments about how the Government arrange the witness sessions, but surely she would not dispute the point about the increasing delays in the pre-application process from 14 months to 27 months. That is a serious issue. The Fens reservoir spent more than 1,000 days in pre-application. The National Grid’s application for Bramford to Twinstead spent 717 days in pre-application for just an overhead line and underground cables covering less than 30 km. Hinkley Point C spent three years in pre-app. Sizewell C spent seven and a half years in pre-app. The hon. Member cannot possibly be suggesting that pre-application is not an issue.
Ellie Chowns
I addressed those points in my comments. I am not disputing the fact that there are individual cases in which huge amounts of time have been spent. In response to the comments from the hon. Member for Glasgow East, I am not dismissing the evidence from the witness he referred to, but I have offered evidence from a report that looked at the whole spectrum of applications from 2011 onwards, which says that the representation of nature and community in pre-application requirements is not the underlying causal problem.
These issues are really complex. There is always a tendency to pick a particular example where the situation has clearly been problematic. I am not disputing the fact that some change may be needed. My argument is that it seems excessive to bring in a blanket policy and shift the pendulum too far away from the opportunity to use the pre-application consultation process to resolve issues that might clog up the process later on, because the requirement for meaningful consultation has been removed. Planning applications will always be contested, but these measures take it too far and sweep aside the rights of communities and organisations representing nature to have their voices heard, as well as the opportunity to resolve conflicts before they reach a legalistic stage.
Jim Dickson
Is the hon. Member aware that Cavendish, the organisation that produced the report, is a company that undertakes consultations? It might just be in its interest to make the case that consultation is not at fault for the delays. Does she agree that the five separate consultations over 15 years that were required—or not required, in my view—for the lower Thames crossing were excessive?
Ellie Chowns
I am aware that Cavendish is a consultancy company. It is perfectly reasonable to make that observation. Most people—I mean, pretty much anyone—who will ever give evidence or produce a report will have some sort of interest. We are not saying that anyone who works in the planning system in any way cannot have a viewpoint that is objective, evidence-based and so forth. There are clear examples of processes that have got stuck. I am concerned not only about unsticking the planning process, but about the proposal to let the pendulum swing too far away from the opportunity to have meaningful pre-application consultation that could be more effective than waiting until things bang up against each other further on in the process.
Ellie Chowns
I am happy to take as many interventions as hon. Members want to make, but I am concerned about the timing, Mrs Hobhouse.
Ellie Chowns
If Members feel that they have additional things to raise, they should feel free to speak.
Nesil Caliskan
I was rising to make my speech, Mrs Hobhouse, not to intervene; I apologise. It is a pleasure to serve under your chairship.
A crucial component of the ability to deliver homes across the country will be to deliver transport and other infrastructure projects. The measures in the Bill go some way towards speeding up the statutory processes of consultation in the delivery of infrastructure projects. As I outlined in my speech on Second Reading, the pre-consultation period for infrastructure projects is a major cause of delay for infrastructure being delivered. To echo the Minister’s remarks, the status quo in this country is simply not working to speed up the process.
As matters stand, applicants operate in what I describe as a hyper-risk-averse context. Delays caused to pre-application contribute not only to the length of time that it takes for infrastructure to be delivered, but to the cost. Other Members rightly identified the lower Thames crossing, which impacts my constituency; 2,000 pages and £800 million spent are figures that have served absolutely no one, and certainly not the taxpayer.
Nesil Caliskan
I do not accept that, because the statutory consultation period will still be in place and thresholds will still have to be met. The reality is that, as things stand, the pre-consultation period has become a beast in itself, which I do not believe is serving our communities. Years and years of endless consultations, including pre-consultations and pre-application consultations, is not true engagement with communities. That part of the process has become a period in which the applicants just try to derisk their approach to crucial infrastructure in this country, which will see land unlocked so that homes can be built.
Ellie Chowns
I do not think that anybody wants “years and years” of contest, but is it impossible to retain the requirement for a degree of pre-application consultation—perhaps within a shorter timescale or with a more tightly drawn set of consultees—so that issues can be dealt with informally and in advance, to prevent more problems arising further down the line? To sweep everything away seems excessive.
Nesil Caliskan
Manifestly, we do not want years of delay before the delivery of infrastructure, but the truth is that that is exactly what is happening in this country. There are years and years of delay, in part because of the pre-application consultation period.
There is nothing preventing applicants and local authorities, or communities and organisations, from working pre-application on the sort of engagement that the hon. Member is referring to, but including it in the proposals in this way would heighten the legal risk for applicants, making them very resistant to submitting their application formally before going through every single possible step. As hon. Members have highlighted, there is a very long list of examples where the status quo has created a huge burden, made the processes incredibly long and cost the taxpayer a huge amount of money. I think I recall the Minister saying that the proposed amendment would save up to about 12 months and £1 billion, which could be the difference between an infrastructure project being viable or not being viable. Infrastructure projects being viable will mean the land value will increase, and the potential for land to be unlocked and millions of homes to be built across the country will be realised.
(1 year ago)
Public Bill CommitteesQ
I do not want to put words into the chief executive’s mouth, because she is not here now, but she told the Committee that there was some concern with the new systems over potential shortfalls in funding because of the spending review, which has not yet allocated money in the short term to Natural England, compared with the extra responsibilities that Natural England will have to undertake on habitat and nature. Can you outline your individual organisations’ views on whether Natural England is adequately resourced at the moment to undertake those extra duties? Under its current guise and funding, do you think that it is in a fit state to deliver on those extra responsibilities?
Victoria Hills: We have been very clear in our position: we support Natural England taking forward some of these new powers and responsibilities, provided that it is adequately resourced to do so. I do not have a detailed diagnostic of its resourcing and capability plans, but we have been assured, working with the Department, that the resources will be there. That is something that we will be keeping a very close eye on.
We support the principle of coming up with strategic solutions to some of the approaches to the environment, which can be delivered at a strategic level. As you know, we are a strong supporter of strategic planning and we believe that some of the biodiversity and nature aspects of planning do not stop at district council boundaries, or even county council boundaries. It makes perfect sense to look at these things at a strategic level; we support that and we support the ambition of Natural England to do it. However, we will caveat that by saying that it must be adequately resourced to do so, and that is a point that we will continue to make.
Faraz Baber: I work as a practitioner for a planning, environment and design company called Lanpro, which operates across the country. With that lens, I would say that the provisions on what it is expected that Natural England will deliver are right. It is good that the Government are moving towards the delivery of environmental delivery plans and all the things that sit around them.
I thought that the challenge to Natural England earlier was interesting. The chief executive was challenged as to whether, given what is in the Bill, there could be a cast-iron guarantee of the environmental credentials that we need to see come through. I have to say that I was surprised at the response, because you cannot: we have to see how it works in practice. For Natural England to deliver that, it will need to significantly recruit dedicated teams to operate a number of the provisions that are set out in the Bill, the EDPs being a good example. It is right that there will be concern about the comprehensive spending review and whether Natural England will have the resources and function to deliver. In principle, the Government are right in their direction of travel on this, but they will need to commit to the resources and funding to deliver on their promise.
Hugh Ellis: To add to that, rather than repeat it, there are concerns about the scheme design. We at the TCPA are also concerned about the philosophy that lies behind it—that it may lead to an offsetting process. To be clear, the foundation of planning is that nature and development can be easily managed together to enhance both. That is our tradition, and it has always been the planning tradition, from Morris onwards. The philosophy of planning should always be that I can build a development for you that will enhance nature and provide housing. The setting up of the two ideas in opposition is destructive and distracting.
We need to focus on design quality in new housing, and principally that means allowing people to have access to nature immediately. They need that for their mental health and physical wellbeing. That is a crucial saving to the NHS and social care budget in the long run. We want high-quality design first, and offsetting and large-scale habitat creation elsewhere—as a second resort, but not as the first, principal test.
Ellie Chowns (North Herefordshire) (Green)
Q
Hugh Ellis: Since 1947, the greatest absence in all planning reform measures has been that we do not know what the system is for. The current round of reforms raises that question profoundly. The purpose should be sustainable development. We are signatories to the UN charter, and key concepts around sustainable development do not feature in the national planning policy framework. Those are really crucial ones about social justice, inclusion, environmental limits and precautionary principles. Those are all key to giving the planning system a purpose. That purpose is crucial pragmatically, because across the sector we need to know what the system is for, so that we can have confidence in it.
It is also crucial to understand that the system has long-term goals, future generations being one of them, and addressing the climate crisis being another. Within three to five years, the repeated impacts from climate change will be the dominant political issue we confront, and we need a system that works for that, as well as for housing growth.
Faraz Baber: Whether it should be in the Bill or in an NPPF-style document is more about whether people are able to know what planning is and how that is communicated. I do not necessarily believe that that has to be enshrined in the Bill, but it certainly should be clear, whether it is in the national planning policy framework, a local plan or a spatial development strategy, so that people—by which I mean all those who interact with the planning system—can know what planning is about and what it means for them. I feel that a Bill, and ultimately an Act, is the wrong place for it to be enshrined.
Ellie Chowns
Q
Faraz Baber: Planning is there to help, for want of a better phrase, with the placemaking and the delivery, and to ensure that there are guidelines for how plan making should take place. It is there to ensure that the various levers associated with the plan-making process and the development process are understood. Planning is the guardian that ensures that sustainable development can come forward.
Victoria Hills: One of the most important questions that anybody—elected leaders or executive leaders—can ask is “Why?” Why are we doing it? What is it all about? What is the purpose of this Bill? What is the purpose of planning? That is why we think it is essential, within the realms of this Bill, that a public purpose of planning is stated up front. You do not have to take our word for it. Our research published yesterday shows that the vast majority of the public do not have a clue what planning is. They do not know what it is for, and if you are going to drive through a major reform programme for planning, the likes of which we have not seen for 15 years, it might be a good idea if we are very clear on what the purpose of planning is.
For us, the purpose is really clear; at a strategic level, it is about the long-term public interest, the common good and the future wellbeing of communities. You need to be open and honest with the public up front that all this change that is coming in planning and infrastructure is actually for the long-term common good. Some of it people may not like in the short term, but we are talking about the long-term common good— delivering on climate, delivering on sustainable development goals and delivering for communities. We think it is really important that the opportunity is not missed, not only to help inform the public and everybody else who needs to know what the purpose of planning is but to provide that north star, that guiding star, as to the why. Why are we doing this? What purpose does it have?
Thank you for your question. We are absolutely clear that having a public purpose of planning is really important for this legislation, and we will continue to make that case.
Q
Hugh—the Bill provides a clearer, more flexible and more robust framework for the operation of development corporations. You know that it is clearly our view that they have to do a lot of work in the coming years to drive the kind of delivery we need and the types of development we want to see come forward. What is your assessment of how effective those development corporation powers are to support development and regeneration?
Victoria Hills: One thing we know about from our members, but also from those people who are actually in the business of building things—of course, that is really what is important if you want to see some growth coming—is consistency. You asked about the variation. Some councils have fantastic schemes of delegation and it is very clear what is and is not going to committee, but other councils have a slightly more grey scheme of delegation—let’s call it that—whereby things can pop up in committee on the basis of an individual issue or individual councillor.
The opportunity afforded to us by the Bill is for some consistency through a national scheme of delegation. We have in place some very robust processes that look at the business of development, through the local plan process. It goes to not one but two public inquiries, through the Government’s inspectorate, and then back to the community. What we recognise is that if you have had some very robust considerations of the principles of development and you have good development prescribed by, for example, a design code that says, “This is what good development looks like here”—so we have worked out what we want, where it is going and what it looks like—it is perfectly possible that suitably qualified chief planning officers can work out whether something is in conformity with a plan. We therefore welcome the opportunity to clarify that through a national scheme of delegation.
This is not to take away anybody’s democratic mandate to have their say. Of course, there are all sorts of opportunities to have that say in the local plan process, but if we are to move to a national scheme of delegation, we would want a statutory chief planning officer who has that statutory wraparound and has the appropriate level of competency and gravitas to be able to drive forward that change, because it will be a change for some authorities. For some, it will not be a change at all, but taking forward that innovation via a national scheme of delegation will require that statutory post, so that those decisions cannot be challenged, because they will be made in a professionally competent way.
Hugh Ellis: I think development corporations are essential if we are going to achieve this mission. You would expect the TCPA to say that, because we are inheritors of the new towns programme. The interesting thing about them is that, for the first time, they bolt together strategy and delivery. The existing town and country planning system is often blamed for not delivering homes, but it has no power to build them.
The development corporation solves that problem by creating a delivery arm that can effectively deliver homes, as we saw with the new towns programme, which housed 2.8 million people in 32 places in less than 20 years of designation, and it also paid for itself—it is an extraordinary model. The measures in the Bill to modernise overall duties on development corporations are really welcome. I assume you do not want me to talk about compulsory purchase orders right now, but hope value and CPOs are critical accompanying ideas in the reform package that go with that. In the long run, I think that they will become critical.
Obviously, the new towns taskforce has to decide what it wants on policy. The challenge that we face with them is legitimacy, and there is still work to do in making sure that there is a Rolls-Royce process of getting public consent for this new generation of places. However, the outcome is such an opportunity to generate places that genuinely enhance people’s health, deal with the climate crisis and provide high levels of affordability. What a contrast that is with what we have delivered through town and country planning at local plan level, which is a lot of the bolt-on, car-dependent development. Frankly, as a planner, I find that shameful. The opportunity with development corporations is there and I hope that the Government seize it.
The Chair
We can possibly get two more colleagues in, so let’s be succinct with our questions and answers.
Ellie Chowns
Q
Richard Benwell: Let me see whether I can winkle out my clause numbers. Clause 62 requires the EDP levies to be set at a level that takes into account the viability test, and we all know how often viability gives wriggle room for developers. Our view is that the level of levy payments should be enough to secure the compensatory measures needed to go further than remediating the damage caused to nature.
Again, when you look further, you will find the provisions say that the levy needs to cover “wholly or partly” the amount needed to remediate that damage. That could lead to dangerous situations where you are cross-subsidising developers for harm to nature from other pots of money, such as farming funds. It would make far more sense to have a straight-up “polluter pays” principle, where developers pay for the cost of remediating the harm they cause to nature.
Ellie Chowns
Q
Richard Benwell: We have a “polluters possibly pay” principle here, a “maybe prevent” principle with the mitigation hierarchy, and the overall improvement test is a “possibly improve” test. All the way around, those fundamental principles are brought into doubt by the ways in which the Bill is drafted, particularly for species protection, where these are least appropriate.
Ellie Chowns
Q
Richard Benwell: They can be fixed, but we know it will take bravery and leadership from the Government. We hope that Ministers will go for it and the House will unite behind those changes.
Luke Murphy
Q
As someone who has worked on both housing and protecting the environment for the last 10 years, I support this approach because the current system is not delivering. Do you agree that the current system is not delivering for either nature or development? Notwithstanding the flaws—I think there can be some honest disagreement on what the outcomes might be—do you welcome the fact that a new approach is being proposed, given that the current system is not delivering for either development or nature?
Richard Benwell: There is good scientific evidence that the habitats regulations are the most effective site and species protections in the world, but we definitely still need to go further. Some of those strategic solutions, particularly for landscape issues like water pollution, air pollution and water availability, can be improved.
You are right. There are loads of places where we could go further. We would love to see things like building regulations for biodiversity in the Bill, to help get nature built into the fabric of development as we go. To suggest that the habitats regulations are not working is wrong, but their implementation can definitely be improved and more use can be made of this kind of strategic approach if it is done well.
Olly Glover
Accepted.
Matthew Pennycook: In terms of the top-up, we have already allocated £800 million to the affordable homes programme since coming into office. We have also pulled forward £2 billion as a down payment. A significant proportion of the homes coming through those funding routes are social rented homes—almost half, but I am happy to provide the Committee with the specific figure. So we are getting a huge uplift coming through, and the successor grant programme will give particular priority to social rented homes coming through.
Where I think spatial development strategies can add to what we see coming through is that these will not be big local plans—let us be very clear. They need to be pretty high-level documents that make decisions about where housing growth and infrastructure provision is best sited and delivered on a sub-regional basis. That will allow groups of local authorities to take a far more sophisticated approach to, for example, bringing forward large-scale new communities in strategic locations that allow them to meet housing targets in a more sophisticated way. Through other measures that we are introducing—the CPO measures in the Bill are a good example—we will capture more land-value uplift and deliver more social and affordable homes.
Ellie Chowns
Q
Given that commitment from the Government, given Richard Benwell’s observation that there are risks that could be addressed through amendments and given Marian Spain’s comments—that the Bill needs robust safeguards and that drafting amendments may make it more robust—I return to the question that Mr Murphy asked. Can you confirm that you retain an open mind and that you may consider tabling further Government amendments in response to the concerns raised, so that the Bill does what you are saying it does on the tin?
Matthew Pennycook: I appreciate the question. To reiterate—and this is where I slightly disagree with Mr Benwell and others—we are very clear that the Bill will not have the effect of reducing the level of environmental protections, in terms of existing environmental law. We are very clear about that, and confident in the safeguards that exist in the Bill.
I am happy to look at any amendment, and we will in the normal course of the Bill Committee; we will debate each of them in turn and I will keep an open mind about any that we think is feasible, workable, aligns with the objectives of the Bill and delivers what we want to see—absolutely. We will debate all of those in due course. As you rightly made clear, we tabled a package of Government amendments yesterday.
To bring it back to the specific point, some of those amendments on removing the statutory requirement for pre-applications consultation in relation to national significant infrastructure projects were tabled partly because we were getting feedback through the working paper, and also because there were a number of calls on Second Reading for us to specifically look at that area of reform. As you would expect in the normal course of the Bill, we will respond to challenge, criticism, scrutiny and any amendments, which we will debate in due course.
The Chair
If there are no more questions, I thank all our witnesses across the day for their evidence.
Ordered, That further consideration be now adjourned. —(Gen Kitchen.)
(1 year, 1 month ago)
Commons Chamber
Ellie Chowns (North Herefordshire) (Green)
Madam Deputy Speaker, you will know that I always like to start by emphasising where there is common ground and agreement, so that we can start off on a positive foot. I do agree that there is a housing crisis. I do agree that we need to build more homes. We need to tackle the outrageous inequality in the housing market and the fact that there are nearly 1 million empty homes, as well as 1.5 million for which there is planning permission but that are, as yet, unbuilt. We need to build more homes—the right home in the right place at the right price, though—and I am not sure the Bill goes far enough to address those concerns.
There are more areas of agreement. I agree we need to reform planning. I agree we need a strategic approach. I agree we need to tackle the issues of hope value, community benefit from energy infrastructure, and planning fees—so many areas of agreement. [Interruption.] I can see the Minister is smiling. [Interruption.] No, I am not going to stop there; sorry!
However, there are a number of areas of missed opportunity, as well as fairly deep concern. Currently, the Bill has no content on a range of important planning aspects. It does not contain any measures to secure affordable, healthy homes, or to ensure that the planning system is fully joined up with our climate and nature obligations. There is not even a statement of a positive visionary purpose for the planning system, and it is so important to provide the framework for what we are doing here. We need clarification that development should be sustainable, benefiting future generations as well as meeting today’s needs.
We need joined-up policy: a new climate and nature duty on all planning authorities to ensure that all policies tackle our Climate Change Act 2008 and Environment Act 2021 obligations. Planning is crucial for tackling the climate crisis and reducing the environmental impact of new development. We need solar panels on roofs and high levels of insulation. There is nothing here on zero-carbon heating or embodied carbon. There is also nothing on climate adaptation. I find it quite extraordinary that in 160 pages there is not a single mention of the words flood or flooding, yet they are crucial to planning and infrastructure. We need to ensure that the Bill plans for active and public transport. Let us see a “no net new traffic growth” test applied to all developments, so we incentivise the shift to active and public transport.
The Bill should include a nature duty. It provides a great opportunity to specify wildlife-friendly design, swift bricks—I have talked about them previously—hedgehog highways and green roofs. Let us have a new chapter of the building regulations specifically on biodiversity.
I recognise that environmental delivery plans could be useful in some cases, but I worry that they may be a bit too much of a blanket approach. What is suitable for newts is not necessarily suitable for all aspects of wildlife and landscape. I have a little concern that we are effectively outsourcing the environmental obligations of developers to Natural England, without requiring sufficient attention to be paid to those issues. For example, the removal of site-specific survey requirements means we will effectively be shooting in the dark when we specify what remedies need to be taken.
We need to legally guarantee that nature benefits will significantly outweigh any harm. We need to follow the mitigation hierarchy, strengthen protection for irreplaceable habitats such as the ancient woodlands and chalk streams that have been mentioned, and remove the viability test for the nature restoration levy. Otherwise, there is a real risk that developers will altogether escape paying for the nature restoration that they should do.
We need to ensure accessibility standards and affordability standards—
(1 year, 2 months ago)
Commons Chamber
Ellie Chowns (North Herefordshire) (Green)
I thank the hon. Member for South Dorset (Lloyd Hatton) for securing this debate on such a crucial topic.
Public trust in politics is at an all-time low; only 12% of people trust political parties, and only 15% of the population think that political funding is transparent. There is clearly a problem at the heart of British politics. As the hon. Member said, it is particularly bad in our country, because we have an Electoral Commission with very little in the way of teeth or of limits. That leaves our democracy open to corrosion and dark money, which we have to be particularly worried about guarding against. As the hon. Member for Brent East (Dawn Butler) said in the previous debate, we must guard our democracy against those anti-democratic forces and against dark money�the influence of money in politics is a core part of that corrosion.
In the UK, there is no limit on individual donations. That is not the case in Canada, in France, or even in the US. Why is there no limit on how much money an individual can donate, and on how much influence they can therefore exert on British politics? Corporate donations are allowed here, but are banned in so many other countries. Foreign donations are theoretically banned here, but loopholes mean that an individual such as Elon Musk could quite easily work within existing, very bendable rules in order to exert what would undoubtedly be a very corrosive influence on our politics. The hon. Member for South Dorset mentioned the Electoral Commission�s lack of enforcement powers: the maximum fine it can impose is �20,000, yet the influence in our politics totals tens of millions of pounds. Just over the past decade, �115 million has come from unknown sources. This is clearly a serious problem.
I welcome the fact that the current Government made a manifesto commitment to strengthen the rules on donations to political parties, in order to protect our democracy from foreign influence. I very much hope that in her summing up the Minister will be able to clarify exactly what that will amount to. What actions do the Government intend to take in order to protect our democracy from foreign influence? Can she commit to taking measures such as strengthening the powers of the Electoral Commission to issue fines, reducing the reporting thresholds in order to increase transparency, and clarifying spending limits? Those measures would not require primary legislation, so can the Government set out the timetable by which they will bring forward those urgently needed measures to protect our democracy?
Big money in politics is a corrosive influence. This Government have the opportunity to put a stop to it�to bring us up to the standards that other democracies have put in place. Will the Minister set out her timetable for doing so, and clarify precisely what she will do?
(1 year, 3 months ago)
Commons Chamber
Ellie Chowns (North Herefordshire) (Green)
I welcome some aspects of what the Minister is proposing. It is important to not always fire political shots at each other and to look for common ground and give credit where it is due. I have said this to him before, but I really welcome the moves that the Government are making towards multi-year funding settlements. It is so important to move away from the hand-to-mouth, year-to-year, jam-jar approach to funding—particularly capital funding. That ridiculous competition between local authorities over an ever-decreasing pot of funding has been so damaging, so those moves really are things to welcome.
But—there are quite a few buts about the local government finance settlement, but I will focus on just three. I represent the wonderful North Herefordshire constituency. Herefordshire council has received a settlement that is well below the national average, well below the average for comparator councils, and well below what is needed to provide the services that residents need and deserve. An interesting element of the debate has been some Members seeking to pose a binary conflict between rural and urban authorities. I want to get away from that—it is really unhelpful—but it is important to recognise there is serious deprivation in rural areas, not just in income but in access to services.
The hon. Member for Glastonbury and Somerton (Sarah Dyke) talked eloquently about the fact that sparse populations, long distances and poor transport networks all hugely increase the cost of delivering services such as social care or home-to-school transport. That is the impact of geography, but demography is also an issue. Herefordshire has 50% more over-65s than the national average, which has a knock-on impact on the cost to local government of delivering crucial services.
It is absolutely crystal clear that although the Government have taken away the rural services delivery grant, which they perhaps viewed as yet another jam jar, they have not replaced it in the new formula with a fair allocation of funding on the basis of rurality. I beg the Minister to revisit that issue when he comes up with the multi-year funding settlement. Otherwise, the serious problem of rural areas having their specific elements of deprivation under-recognised in the funding formula will build up so many other problems into the future. [Interruption.] I can see the Minister is nodding. I thank him for that and warmly invite him to Herefordshire so that we can show him, face to face and on the ground, the challenge of providing those services. That was “but” No. 1, regarding rurality.
“But” No. 2, which relates to the impact of the rise in employers’ national insurance contributions, has been referenced previously in this debate. I appreciate the nuance with which the Minister answered questions on this issue earlier, and his recognition that it is a really serious issue and that the funding settlement does not fully acknowledge it, particularly the on-costs, because so much of what local authorities do is done not just through the staff they employ themselves, but through commissioned services. I am sure that Members across the House have been inundated with correspondence from charities and businesses working in sectors such as the care sector that are desperately worried about the effect of the increase in employers’ national insurance contributions on their ability to provide those crucial services—so often commissioned by local authorities—to local people. When the Minister is doing the multi-year funding formula in future years, will he please address that issue and ensure that those costs are fully integrated into the calculation?
My third “but” was also touched on earlier. The Minister expressed doubt about whether cross-party agreement could be reached on this matter, but there seems to be quite a degree of consensus across this House that council tax is a broken tax—it is a broken funding system. It is outdated, regressive, unfair, and way overdue a review. We are charging people based on an assessment of property rates that were set 35 years ago and have never been updated. Council tax is crying out for a fundamental review, so will the Minister please commit to undertaking that review, working across parties and across the House to find a much fairer and more sustainable long-term approach to raising local funding?
(1 year, 3 months ago)
Commons ChamberLet me start by sincerely thanking the hon. Member for Cheltenham (Max Wilkinson) for introducing the Bill, for the constructive spirit in which he has engaged with me on it, and for his laudable efforts outside the Chamber—including his efforts as a local councillor, before coming to this place—to promote the further growth of solar power. I know it is a cause that he cares about, and his passion and commitment were evident in his opening remarks. I also thank all the other Members who have spoken this morning for their thoughtful and well-informed contributions. It has been a wide-ranging debate and the quality has been high—although the same cannot be said, I am afraid, for many of the puns that have been made throughout.
The Government are extremely sympathetic to the intention behind the Bill, namely to significantly boost the deployment of rooftop solar. That aim is clearly shared widely across the House, and for good reason. Self-generation and consumption through solar PV panels not only decreases emissions and delivers bill savings for householders, but provides security from fluctuations in wholesale electricity prices. As solar technology becomes more efficient and affordable, installing panels during construction is increasingly more cost-effective than retrofitting, a point that many Members touched on. The Government are, therefore, in complete agreement with the hon. Gentleman that solar energy has an integral role to play in improving the energy efficiency and reducing the carbon emissions of new homes.
However, we cannot support the Bill today. That is because the Government already intend to amend building regulations later this year as part of the introduction of future standards that will set more ambitious energy efficiency and carbon emissions requirements for new homes. The new standards will ensure that all new homes are future-proof, with low-carbon heating and very high-quality building fabric. Not only will they help us to deliver our commitment to reach net-zero emissions by 2050, but they will reduce bills, tackle fuel poverty, grow skills, foster diverse job markets and make Britain energy secure.
Let me make this absolutely clear to the House and to those watching our proceedings: solar energy will have an extremely important role to play in these standards. The Government’s reservations about the Bill are not related to its objective; rather, they stem from recognition that the regulatory landscape being dealt with is incredibly complex and that we must take great care to get the technical detail right. My officials and I are working to develop the technical detail of the solar standards we intend to implement, with a view to ensuring that they are both ambitious and achievable. Our concern is that passing primary legislation that does not strike that balance correctly could have adverse effects, including on housing supply, the construction industry and local authorities.
Although the Bill is not inherently flawed, we are not convinced that it is the most appropriate means of proceeding, for reasons I shall set out shortly. None the less, the hon. Member for Cheltenham has done the House a great service by providing hon. Members with a valuable opportunity to debate this important issue. In the time available to me, I will try to give the House a sense of some of the practical challenges we have been wrestling with as we develop and refine our emerging proposals, and how they speak to potential weaknesses in the Bill.
As hon. Members will be aware, in December 2023 the previous Government published the future homes and buildings standards consultation, setting out proposals on what new standards should entail. The consultation closed in March last year. Over 2,000 responses were received, and some of the most detailed feedback the Department received related to the options set out in respect of solar. The hon. Gentleman has, I know, amassed a not inconsiderable amount of technical expertise when it comes to rooftop solar systems, and he has consulted with industry stakeholders, so he will be acutely aware that setting environmental standards for new homes is not something that Government can do in isolation. To succeed, we must take industry with us, and crucially, we must also ensure that the standards we set are achievable on all sites across the country.
While it is certainly not dictatorial, the expert feedback to the consultation as well as our ongoing work with the industry-led future homes hub, where we have been considering matters such as design flexibility, has been invaluable in shaping the Government’s thinking on what future standards should look like and how they should be implemented. The feedback to the consultation we received drew attention in particular to a number of practical considerations, which we believe it is essential to take into account when determining the precise role of solar in the new standards. I shall touch briefly on three, to illustrate the sort of practical issue my officials and I have been weighing up as we develop the forthcoming new standards, and in so doing give the House a sense of why we feel the Bill may not be the right way to achieve the objective we all share.
The first consideration relates to the ground floor area requirement. As hon. Members know, the future homes and buildings standards consultation set out two options for new homes; both included very high-quality building fabric and a heat pump. The first option also included several additional elements, notably solar panels equating to 40% of the ground-floor area. While respondents were very supportive of the inclusion of solar panels, widespread concerns were raised about the proposed level of solar coverage, which many argued would be virtually impossible to achieve on certain types of home—for example, those with dormer windows.
Clause 1(2) of the Bill sets out a requirement for the same level of solar coverage as was proposed in the consultation. Having thoroughly explored the evidence submitted during the consultation process, the Government have concluded that this level of ground-floor area coverage, rather than just being challenging for a small proportion of new supply, is simply not feasible for many new homes. Importantly, our concern is that setting a requirement at this level in law would result in a significant number of homes needing to apply for an exemption to the standards, which in turn could cause unmanageable workloads in local authorities, lead to significant bottlenecks in housing supply, and ultimately reduce the speed at which rooftop solar on new homes is rolled out.
Determining exemptions is by no means a trivial task. Solar panel systems must be designed carefully for each individual house, taking into account features such as roof shape and pitch, roof lights and dormers. As such, determining the number of solar panels a roof can reasonably accept is a technical design exercise for which many local planning authorities are simply not resourced to carry out in large numbers. Furthermore, any regulation would need to have an enforcement mechanism to deal with instances where unscrupulous developers simply did not comply. The Bill does not address that point, and again, we fear it could end up being another burden that will fall on overstretched local planning authorities. Alive as we are to these unintended consequences, the Government are determined to take an approach that is both ambitious and technically feasible so that widespread exemptions are not necessary.
The second issue relates to the timeframe for introducing the changes. Clause 1(1) stipulates that solar PV will be mandatory on new build homes from 1 October 2026. While that may seem some way into the future, the design and specification of new housing developments is typically set some considerable time prior to construction. As a result, the Bill’s proposed commencement date could risk a significant increase in costs and delays to housing delivery, as developers are forced to rapidly redesign, including sites already in train.
It is important to bear in mind that those in the industry cannot properly prepare for the new requirement until they have access to the final regulations and accompanying statutory guidance. Preparing the regulations and said guidance is not an insignificant task. They need to be drafted and consulted upon, with the consultation open for at least 12 weeks to align with standard protocol and to permit industry sufficient time to respond to such significant proposals.
Following the consultation, the regulations and guidance will need to be finalised and passed using the affirmative resolution process. It is therefore unlikely that the full detail will be available to the construction sector until the end of this year at the earliest, giving the sector only a few months to redesign and get supply chains prepared. These issues are particularly pertinent for small and medium-sized enterprises, which are less equipped to respond quickly. By potentially compressing this period to meet the proposed deadline, housing sites that are already under way may become unviable, leading to wasted investment, a negative impact on housing supply and disruption to numerous local communities across the country—outcomes that I am sure Members will agree we must try to avoid.
The third and final issue relates to transitional arrangements. Government typically minimise the disruption associated with the introduction of new building regulations by setting out associated transitional arrangements. These arrangements determine the limited conditions under which a building can be built to the previous standards. That gives industry time to adapt to new standards and allows work that is already under way to be completed without major disruption. When the 2021 standards were introduced, a six-month period was allowed between laying the regulations and the standards coming into force, followed by a 12-month transitional period. That meant the regulations were laid on 15 December 2021, with the transitional period ending on 15 June 2023.
This Bill does make provision for the Secretary of State to put in place transitional arrangements. However, our reading of the Bill is that those arrangements cannot contradict or override its main premise that new homes built from 1 October 2026 must be fitted with solar panels. As a result, we are concerned that there may not be sufficient time for appropriate transitional arrangements to be set. We believe it is vital that they are set, given that the construction sector typically plans ahead by at least two, if not three or even more, years. Providing merely a matter of weeks between publishing such significant legislation and its taking effect would not be realistic or fair, in our view.
Ellie Chowns (North Herefordshire) (Green)
I have been listening carefully to what the Minister has said. Does he agree that a vote on Second Reading is a vote on the principle of the Bill, and the objections that he has been raising are micro, technical ones? Does he not agree that the urgency of the climate crisis and the immense benefits associated with solar PV mean that he should stop raining on the parade of this Bill and give us the opportunity to vote on photons?
The hon. Lady makes a fair challenge, but the Government do not intend to proceed on the basis of primary legislation. She might find that the primary legislation route is ultimately slower than the way in which we intend to introduce the future standards later this year. Speed is absolutely an issue we are grappling with, but I gently challenge the idea that this private Member’s Bill is the fastest way to proceed, even leaving aside the points I have raised, which I do not consider to be minor or technical.
In contrast, the future homes standards consultation sets out two options for transitional arrangements, which we believe are far more robust. The first option involves a six-month period between the laying date of the regulations and the regulations coming into force. The second option involves a period of up to 12 months. That approach to transition will ensure that as many homes as possible are required to meet the new standards in a way that is structured and achievable.
It is our responsibility to ensure that the standards we set for new homes are ambitious, but also technically feasible and deliverable, as I have said. For the reasons I have set out, and others that I have not covered today, we believe that forthcoming future standards, developed as a clear and coherent response to the 2023 consultation, are a more appropriate and arguably faster means of achieving the Bill’s aims, which we fully share with the hon. Member for Cheltenham.
(1 year, 4 months ago)
Commons ChamberThere have been a number of competing proposals. I do not believe in elephants in the room, but one was an explicit proposal to have a Devon and Cornwall combined authority with a mayor. It was by and large proposed by Devon, but it was met with what I would describe as quite animated resistance from Cornwall for different reasons. It is not our intention—and, frankly, there are not enough hours in the day—to keep getting involved in local disputes about boundaries and identity. What we want, and this is genuine, is for the local area to self-organise, come up with a proposal that is right for the area, and make that proposal to the Government so that we can work in partnership and deliver the outcome of getting powers out of this place and into places such as Cornwall.
Ellie Chowns (North Herefordshire) (Green)
I welcome the elements of this White Paper that are about devolution, but we have to recognise that some elements are about concentration. The Minister has talked about the two-tier premium, but the reality is that his proposals mean that in some places a local tier will be replaced by a more distant mayoral tier. Does he recognise that this risks creating a bit of a democratic deficit? Surely, we should be trying to keep the “local” in local government as much as possible. Given that average turnout in the last lot of mayoral elections last year averaged 30%, what will he do to address the risk of democratic deficit? In particular, will he introduce a fair and proportional system for local elections?
The truth is that these strategic authorities are about taking power from this place and moving it down to communities. Every Minister gets hundreds of sign-offs every single day, but as Conservative Members will remember, they include Ministers having to sign off whether cyclists can pass through a local park because the parish council has to apply to central Government for permission. That is part of the centralising nature of the state that we have to change.
(1 year, 5 months ago)
Commons ChamberI really hope so, Mr Speaker; that is the plan. We are taking steps through the new national planning policy framework, and we have new mandatory targets for local authorities. We have also allowed local authorities to keep their right to buy receipts. The Government are taking a number of measures to ensure that we get the homes that we so desperately need, and I am determined to get to that 1.5 million figure.
Ellie Chowns (North Herefordshire) (Green)
I welcome the Secretary of State’s warm words about improving affordable housing availability. Does she agree that the affordability of housing is closely related to the bills that people have to pay—energy bills in particular? Will she ensure that all new social housing from this stage forward is built to the highest possible standards of energy efficiency, to save people’s bills?
Again, we have been looking at how we build safe, secure, energy-efficient homes that bring down people’s energy bills. The previous Government saw energy bills go up really high. We are introducing Great British Energy so that we can bring bills down, and are building the homes that people desperately need.
(1 year, 6 months ago)
Commons Chamber
Ellie Chowns (North Herefordshire) (Green)
I begin by welcoming this Bill on behalf of my Green colleagues. I would like to gently comment on the tone of some of this debate. I find myself on the Opposition Benches, but that is not to say that I share the sentiments expressed by Conservative Members. In particular, it is a shame that we have seen some very polarised debate today. I want to challenge the rhetoric of, “It’s workers versus employers and unions versus small businesses.” That is both ahistorical and economically illiterate, frankly. It is ahistorical because if we did not have workers organising together to improve their conditions, we would still have children up chimneys and women being paid a small fraction of what men are paid for doing the same work.
Such rhetoric is economically illiterate because inequality is bad for growth. It is not just me and Labour Members who say that; the International Monetary Fund has specified that inequality is bad for growth. Let us try to look for the common ground together, and to welcome measures that will improve work and the security of people who work. Let us recognise that, frankly, this Bill is long overdue, because we have seen the erosion of workers’ rights over decades. We are now in a position where work does not pay well enough for far too many people in our country, which is why we have so many people on in-work benefits.
I really welcome the sentiments expressed by the right hon. Member for Hayes and Harlington (John McDonnell), who pointed out that there are much better labour relations in countries where there is a positive recognition that workers’ rights go along with improved economic growth. As a country, let us try to move towards that point.
I want to briefly mention a few areas where I would like the Government to go further. The Bill’s failure to fully ban fire and rehire practices is inexplicable. It leaves a loophole or get-out clause that effectively condones this practice, and I do not think there can be any grounds for treating workers in purely transactional terms.
Zero-hours contracts are a complex area. I know that some people welcome the opportunity to have zero-hours contracts, but this flies in the face of what the majority of the public wants. The current model leaves far too much power in the hands of employers.
I want to briefly mention other aspects of equality. It is disappointing that this Bill does not uphold previous Labour pledges on mandatory disability and ethnicity pay gap reporting. It will lead to increased inequality between migrant workers and others, because it does not address the risks that migrant workers face when their visas are dependent on employers, and they may exit the country before they have had a chance to pursue their employment claims.
I would like to see kinship care treated in the same way as adoption leave. The hon. Member for Torbay (Steve Darling) talked about foster carers, too.
In summary, I welcome this bill, but there are areas where I would like to see the Government go further to protect workers’ rights.