Luton Flightpaths

Huw Merriman Excerpts
Monday 9th January 2023

(1 year, 3 months ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Huw Merriman Portrait The Minister of State, Department for Transport (Huw Merriman)
- View Speech - Hansard - -

I congratulate my hon. Friend the Member for South Cambridgeshire (Anthony Browne) on securing this debate on London Luton airport flightpaths. I thank my hon. Friends the Members for Huntingdon (Mr Djanogly) and for North East Bedfordshire (Richard Fuller) for their contributions.

I want to open by acknowledging the effects that aviation noise can have on the health and wellbeing of individuals and communities in the vicinity of airports and underneath flightpaths. It is important to take into consideration the impact of airspace changes. I understand the experiences my hon. Friend describes of his constituents following the implementation of airspace deployment 6, known as AD6. In 2017, the Government provided new air navigation guidance to the Civil Aviation Authority, which is now embedded within the authority’s CAP1616 airspace change process. AD6 is following that process.

The guidance requires sponsors of airspace change to undertake air pollution and noise impact assessments of their proposals, and to actively engage and consult with key stakeholders, including communities, on those proposals. The objective of AD6 is to segregate the arriving air traffic at Luton and Stansted airports. It has important safety and efficiency benefits, as my hon. Friend recognised.

AD6 was subject to public consultation between October 2020 and February 2021. In the light of the feedback received, the sponsors made some changes to the proposals. These included slightly shifting the location of the proposed new airborne holding stack, as well as increasing the minimum height in the stack by 1,000 feet. As my hon. Friend noted, AD6 is now the subject of a post-implementation review by the CAA, which seeks to determine whether the actual outcome of the airspace change is consistent with what was expected.

Jonathan Djanogly Portrait Mr Djanogly
- Hansard - - - Excerpts

The Minister mentions that after the initial consultation the height of the stack was increased. What we have been discussing is what happens after the airplanes come out of the stack. What no one realises and what was not in the consultation—a lot of clever people have been looking at the consultation, which is, frankly, unintelligible—is that the planes very quickly come out of the stack and descend. Why can the planes not stay at stack level until a much later time and then come down, thus not disturbing as many rural people?

Huw Merriman Portrait Huw Merriman
- Hansard - -

I am about to refer to the airspace modernisation changes, which touch on the impact of lower and deeper climbs. If that does not address my hon. Friend’s point, I will happily meet him and take other points he may feel need to be made. There are wider airspace modernisation changes that also impact on this field, but I am happy to meet him if he does not feel reassured by what I say.

I am pleased to report to the House that the CAA’s review of AD6 allows two opportunities for any concerns to be raised by those who consider they are being affected by the airspace change we are discussing. The first is by contacting London Luton airport before it concludes its impact data collection. Secondly, those impacted can focus on the requirement of the sponsor to publish on the CAA’s airspace change portal its detailed assessment of how any impacts compare with what was set out in the airspace change proposal and accompanying options appraisal on which stakeholders were consulted. Once that assessment has been published, there will be a 28-day window during which anyone may provide feedback about whether the impacts of airspace change have been as they anticipated.

That feedback can be submitted directly to the Civil Aviation Authority via its airspace change portal, which gives local residents the direct channel for complaints post implementation that my hon. Friend the Member for South Cambridgeshire asked for in his third point. When completing the review, the CAA will take account both of the sponsor’s assessment and of the feedback that the CAA has received on it. The CAA’s own assessment will include an analysis of the actual flight track data to determine whether aircraft are flying the AD6 airspace design as expected.

I also note my hon. Friend’s fourth and final point: namely, his desire for the data to be available to communities. I agree that that would be helpful. As part of their post-implementation review submission to the Civil Aviation Authority, the sponsors must—I underline “must”—provide air traffic dispersion graphics, including both lateral and vertical actual flight track information. Before the completion of the review, residents will therefore get a chance to see the air traffic dispersion picture.

The Civil Aviation Authority will use all relevant evidence to determine whether AD6 has met its objectives and can be considered approved, or whether it must be amended or withdrawn; I hear the points that hon. Friends have made in that regard. I remind the House that the Government are not involved in the review process, which is entirely a matter for the Civil Aviation Authority.

Richard Fuller Portrait Richard Fuller
- Hansard - - - Excerpts

I concur with the Minister’s point about the independence of the review. In my earlier intervention I raised a deeper point about airport expansion and the effect that it can have on surrounding communities. Such expansion makes no provision for financial consideration or remuneration for the communities affected. That is a particular issue in the context of Luton airport, because the property owner is Luton Borough Council, which directly financially benefits from expansion and is also the planning authority for the expansion. Will the Minister—as the last aviation Minister, my hon. Friend the Member for Witney (Robert Courts), suggested when he was taking legislation through the House—look at whether the law can be changed so that communities such as those in Cambridgeshire, Huntingdonshire and Bedfordshire, which are affected by airport expansion, can somehow be compensated when airport expansion changes are made?

Huw Merriman Portrait Huw Merriman
- Hansard - -

I thank my hon. Friend for that point; he has made interesting points as the debate has evolved. I have some knowledge of the issue, in the sense that my constituency is relatively near Gatwick, although not in its flightpaths. It is fair to say that Gatwick provides a lot of economic regeneration for my constituency, but I also know that those who are closer to the airport are affected by airspace noise. It is also fair to say that Manchester Airports Group, which is involved in local authority remuneration, is in a similar situation to Luton airport with respect to what my hon. Friend has described. Yes, of course we can look at sharing the costs, but I also ask that we consider the wider economic benefits for those outside the airport perimeter. However, I obviously recognise that as noise encroaches, it becomes a pollution to them; I will touch on that point further. I recognise the point that my hon. Friend makes and am willing to look again at his ask.

I want to focus, albeit not in order, on the four points that my hon. Friend the Member for South Cambridgeshire made. His second point was a request to ensure that the post-implementation review period is extended to September 2023. I can give him that assurance. Following the request made to the CAA, it intends to extend the data collection period until September 2023. I ask him to accept that response, and I thank him very much for his suggestion. I hope that extending the consultation period will allow more transparency.

My hon. Friend’s first point—as I say, I am going in no particular order—raised the question of background or ambient noise. In 2018 the Department for Transport commissioned the CAA’s environmental research and consultancy department to examine the impact of aircraft noise in areas with different background or ambient noise. The study, which was published in 2019, found no significant association between annoyance and background or ambient noise when other factors were taken into account. That does not mean that the concerns that have been raised tonight should be dismissed. My hon. Friend has informed the House of some upsetting cases of constituents being affected by aviation noise. It can have a demonstrable impact on a person’s health and wellbeing, but that varies from individual to individual and is not attributed only to the noise itself.

However, my hon. Friend also recognised some of the benefits that aviation brings, and I hope he will not mind my joining him in recognising them as well. London Luton Airport makes a positive contribution to the local and national economy. It indirectly employs more than 9,400 staff, and is a key economic driver for the region. I welcome its continued recovery following the impacts of the covid-19 pandemic. We therefore need to strike a fair balance between the negative impacts of aviation on the local environment and communities and the positive economic benefits that flights bring. That is the challenge for aviation noise policy. The Government are committed to reducing the negative impacts of aviation where possible, and that includes noise. We will be considering what changes may be needed to aviation noise policy in due course, and we will set out our next steps later this year. I look forward to working with all my hon. Friends in that regard.

Jonathan Djanogly Portrait Mr Djanogly
- Hansard - - - Excerpts

Will my hon. Friend give way?

Huw Merriman Portrait Huw Merriman
- Hansard - -

If I may, Mr Deputy Speaker, I will indeed give way.

Jonathan Djanogly Portrait Mr Djanogly
- Hansard - - - Excerpts

I thank my hon. Friend, who is being very generous.

--- Later in debate ---
Jonathan Djanogly Portrait Mr Djanogly
- Hansard - - - Excerpts

If the noise policy changes are made, as my hon. Friend says they will be, will they be retrospective?

Huw Merriman Portrait Huw Merriman
- Hansard - -

I do not wish to make policy on the hoof from the Dispatch Box, but I am willing to meet all three of my hon. Friends to discuss the point from which this should apply. Perhaps we can have that discussion, and I will accept any feedback that they wish to give me.

In the time that I have left—less than one minute—let me reiterate that the Government are committed to reducing the negative impacts of aviation where possible. We also recognise that we live in a fully interconnected, global world, and that the aviation sector is of material value to the UK economy. Airspace modernisation will help the delivery of quicker, quieter and cleaner journeys.

I thank my hon. Friend the Member for South Cambridgeshire not only for securing the debate, but—along with my hon. Friends the Members for North East Bedfordshire (Richard Fuller) and for Huntingdon (Mr Djanogly)—moving this matter further forward. Let me also put on the record how well they represent their constituents on this issue.

Question put and agreed to.

Future of Rail Services

Huw Merriman Excerpts
Tuesday 20th December 2022

(1 year, 4 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Huw Merriman Portrait The Minister of State, Department for Transport (Huw Merriman)
- Hansard - -

It is a pleasure to serve under your chairmanship, Mr Robertson. It is also a great pleasure to be part of this debate, which was secured by my hon. Friend the Member for Wimbledon (Stephen Hammond). He said at the very end of his speech that he hoped the debate would be taken as positive and constructive, with ideas to feed into the mix. That is something that I always do with my hon. Friend, who has great expertise both as a brilliant railway constituency representative and as a former Transport Minister. In that regard, I thank him and all the other former Transport Ministers who have fed their ideas into the mix. I hope that I can cover the points made by my hon. Friend in the round, but I will try to address some of them specifically.

The Government remain absolutely committed to reforming our railways and ensuring there are high-quality railway services across the whole country. As my hon. Friend pointed out, the Government commissioned Keith Williams to conduct the first root-and-branch review of the rail industry in a generation, which led to the publication of the plan for rail White Paper in 2021. Before that, more than 750 representations were made to the review, which met over 200 groups across the country. Although my hon. Friend pointed out that the review was completed some time ago—back at the end of 2019—it was extended to allow more time to test the conclusions and ensure that they were appropriate, given the impact of the pandemic on rail.

There have been various changes of personnel, as my hon. Friend is well aware. The Secretary of State and I have been in post only since the end of October. We are reviewing the options for reform, and we expect to be able to provide concrete proposals as to what the reform will look like very shortly. We believe that the case for reform is stronger than when the plan for rail was first published. The lasting consequences of covid-19, along with industrial relations, sustained poor performance and financial challenges, increase the need for modernisation and efficiency. I will come on to the role of the private sector. If we want to regrow the railways back to the passenger numbers that we have previously seen, the best way to do that is to wrap in the private sector, which doubled those numbers post privatisation. I am very much with my hon. Friend the Member for Wimbledon on those optics.

Lisa Cameron Portrait Dr Lisa Cameron (East Kilbride, Strathaven and Lesmahagow) (SNP)
- Hansard - - - Excerpts

I am grateful to the Minister for speaking so eloquently about his vision for the future of rail services. As chair of the all-party parliamentary group for disability, I often hear from people right across the United Kingdom about difficulties in accessing rail services, ticketing offices and disabled toilet facilities. Will the Minister consider those important inclusion issues in his future vision?

Huw Merriman Portrait Huw Merriman
- Hansard - -

Yes, we certainly will. We are looking at an interesting and challenging set of reforms. Ticket offices are largely unchanged from how they were 30 years back, but only 12% to 14% of tickets are purchased from ticket offices. The key is to find a way to get those personnel outside—on the platform and in the station—to help those with disabilities and mobility issues. Getting them on the platform and on the trains may mean change, but I hope that that will be a positive change for the passenger and the workforce. It will be a more interesting and exciting role with passengers.

Munira Wilson Portrait Munira Wilson (Twickenham) (LD)
- Hansard - - - Excerpts

The Minister touched on his current focus on industrial relations and the need to grow the number of passengers coming back to the railways. Is he aware of the situation with South Western Railway, which serves all of south-west London, Surrey, Wiltshire and the south-west? Until the new year, there will be no services at all on non-strike days at 40 stations across the network, including Whitton, St Margarets and Strawberry Hill in my constituency, and numerous stations in Surrey. Nurses who are not striking cannot get to work, police officers cannot get to work and children cannot get to the schools that are open. What is the Minister doing to work with South Western Railway to ensure that services are available on non-strike days? We will never get people back on to the railways and improve industrial relations if passengers cannot get where they need to.

Huw Merriman Portrait Huw Merriman
- Hansard - -

I agree with the hon. Lady, and I am aware that she applied for an urgent question on the matter. I will write to her.

I call for all hon. and right hon. Members to come together as one on this issue. We cannot focus on good passenger experience and a future for the railways if there is industrial action that involves the workforce not working on rest days when it has previously done so. I have never encouraged that pattern or seen a future for it, because it means that we are reliant on goodwill. When goodwill is withdrawn at short notice, we end up with what the hon. Member for Twickenham (Munira Wilson) described. We need to move away from rest-day working, which does not work. Equally, I urge all those who are involved on the union side of matters to consider that it is Christmas. If we want a future for our railways, we must work positively and constructively, rather than withdrawing labour. I will write to the hon. Lady, as I mentioned.

John Penrose Portrait John Penrose
- Hansard - - - Excerpts

Will the Minister give way?

Huw Merriman Portrait Huw Merriman
- Hansard - -

I should make some progress, because time will push me towards the end. I shall try to take a further intervention if I can.

I want to talk about other parts of the reform: fares and ticketing. As part of the plan, we will invest £360 million to radically reform and improve the passenger experience. We will also look to deliver our manifesto commitment by introducing tap-in and tap-out at additional stations in regional and urban areas, and contactless pay-as-you-go ticketing at over 200 stations in the south-east. We will also introduce simpler, modern ways of paying for travel and a straightforward compensation process.

Let me touch on the proposals for reform. In addition to our significant investment in the passenger experience, one reform that we are considering is the creation of a new guiding mind to bring the fragmented railways under a single point of accountability. That would not be nationalisation; rather, it would be simplification. A simple, more agile structure will be needed to change travel and working patterns, introduce new technologies and enhance business models. My hon. Friend the Member for Wimbledon talked about the role of the private sector.

My hon. Friend the Member for Wimbledon talked about the role of the private sector. Rail reform must have at its core greater private sector involvement. I want any new model to take the very best of the private sector: innovation, an unrelenting focus on quality and the type of models that drive reform, a better experience for the passenger and better return for taxpayer value. I am happy to discuss the private sector contribution, and to meet my hon. Friend to reassure him about that. He knows that I have always had a real passion for what the private sector has brought for rail. I agree that, although the franchise model may have run its course, it was not made easy for the private sector to navigate, because it became a very complex, documented process that put off new entrants to the market. Any rail reform has to be simple and nimble enough to bring in new innovators, not just the largest.

My hon. Friends the Members for Wimbledon and for Weston-super-Mare (John Penrose) have championed open access. Rail reform must see an important role for open-access operators. We want to make the best use of the network and grow new markets for rail. The Department recently supported Go-Op’s innovative proposal to operate open-access services from Taunton to Swindon and Weston-super-Mare, providing new direct services and improved connectivity for communities.

I have challenged my Department on open access. It seems to be the case that we are not putting open access on equal footing, which means that there is some sort of charge and enablement. The response is always, “It just takes away from the other contracted operators.” We need to charge open access more to allow it not to take away but to compete. In my view, open access definitely has a place, but we perhaps need to reform the entrance requirements so it is not constantly turned down. I am very excited about those possibilities.

My hon. Friend the Member for Wimbledon asked when legislation would be forthcoming. We will not be taking forward legislation on rail reform in this parliamentary Session, as he is aware, but we will introduce it when the parliamentary timetable allows, and I am very keen that we do so. In the interim, rather than do nothing because legislation is not immediately forthcoming, many areas can be progressed outside legislation. They include making significant investment in ticketing and retail, and the formation of the reform proposals that we will focus on. I assure my hon. Friend that we will bring those forward in parallel with legislation.

My hon. Friend mentioned the control period 7 settlement. That process is vital for securing value for money for the taxpayer and providing certainty to investors. The Government published a strong funding settlement of more than £44 billion for England and Wales for the next control period, which begins in April 2024. My hon. Friend touched on that. That demonstrates our long-term commitment to securing a safe, reliable and efficient railway. The industry—public and private—now needs to work together to establish stretching yet realistic targets for improvements and reliability, supported by Government investment.

On the lack of reference to rail reform or GBR, the HLOS, which my hon. Friend mentioned, is more of a statement of principle. He should not read anything into that. We have not landed on one particular model, so it would not have been appropriate to insert one in there. I got my pen out and made sure there was reference to innovation and private sector involvement—I do not believe anyone took those words out. I was particularly keen to ensure that, with innovation, we included small and medium-sized enterprises so that we are focusing not just on larger private sector involvement but on the small innovators that can really drive change. They need to be in the room too.

On industrial action, passengers rightly expect a regular, reliable service, seven days a week. Current shift patterns and voluntary weekend working for railway staff make that vision nearly impossible. The only solution is for everyone to come together and agree a new way forward. I have met the unions and employers, and the Secretary of State has met the unions too. I hope that will send a message to this House that we want to facilitate an end to industrial action. I again ask all right hon. and hon. Members to come together and push not just the train operators and the Government but those who are responsible for the strikes—the trade unions. It is time for all to be called out where they can deliver more.

The Government are wholly committed to improving journeys for passengers and creating a better, more modern rail industry. I thank my hon. Friend for his contribution. I assure him that the private sector will be right at the heart of any reform proposals. The Secretary of State and I are committed to an improved railway with the private sector at its heart, and I hope that my hon. Friend will keep me to that mantra.

Laurence Robertson Portrait Mr Laurence Robertson (in the Chair)
- Hansard - - - Excerpts

I wish everyone a very happy Christmas and a very peaceful new year.

Question put and agreed to.

West Coast Main Line: Services

Huw Merriman Excerpts
Thursday 15th December 2022

(1 year, 4 months ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Huw Merriman Portrait The Minister of State, Department for Transport (Huw Merriman)
- View Speech - Hansard - -

I thank my hon. Friend the Member for Ynys Môn (Virginia Crosbie) for securing this important debate on rail transport services to the communities served by the west coast main line. She is a doughty campaigner and advocate for train services in her area. In my short tenure, we have spoken many times, and I know that we will speak more.

I also thank all right hon. and hon. Members who contributed to the debate, who were my right hon. Friends the Members for Tatton (Esther McVey) and for Clwyd West (Mr Jones), my hon. Friends the Members for Milton Keynes North (Ben Everitt), for Aberconwy (Robin Millar) and for Delyn (Rob Roberts), and not forgetting the hon. Member for Stockport (Navendu Mishra) and my shadow colleagues the hon. Members for Paisley and Renfrewshire North (Gavin Newlands) and for Slough (Mr Dhesi). I think that I have remembered everybody.

May I start by empathising with all my colleagues and their constituents for the challenges they have all faced on the west coast main line service? I am very sorry about the situation and am determined to see it turned around. I will explain how we will do that, but I owe it to those who have taken part in the debate to explain why the service levels have deteriorated so sharply.

Colleagues whom I have spoken to about this matter in recent weeks have told me that, prior to the summer, the service had been holding up relatively well. Indeed, between 9 January and 1 May, 3% of cancellations were attributed to Avanti. After the end of July, the figure rose to 25%, which is clearly unacceptable. The reason for such a dramatic deterioration can be traced back to the decision on 30 July by many drivers not to work beyond their contracted hours. Let me put that into context and perhaps explain why that may have happened.

A two-year qualified Avanti train driver is paid almost £67,500 and typically works 35 hours over three to four days. To ensure that the railways can operate over a seven-day period, the industry has relied on drivers working additional hours during their rest days. That, in my view—it would also appear to be the view of my right hon. Friend the Member for Clwyd West—has never been a satisfactory means to run our railway, as it relies on good will and means that a train operator cannot put its roster together without drivers volunteering.

On 30 July, as I said, things changed. Avanti experienced an immediate and near total cessation of drivers volunteering to work passenger trains on rest days. More than 90% of drivers who had previously volunteered to work overtime informed Avanti that they would no longer do so, which would not occur without some level of union organisation. That left Avanti unable to resource its timetable and, in the immediate term, resulted in the significant short-notice cancellations that right hon. and hon. Members have described. Avanti therefore reduced its timetable in response to the withdrawal of rest-day working. Although highly disruptive, it gave passengers a chance to try to make alternative plans. That approach reduced cancellations from about 25% of the service in late-July and August to about 5% this month.

May I now look more towards the future and be more positive as to what we are seeking to deliver? Indeed, my hon. Friend the Member for Ynys Môn touched on this in her speech. The Department has been working with Avanti to overcome the operational issues. Agreed steps include almost 100 additional drivers entering service, extra trains on its key routes and extended booking options. Avanti is now operating a seven trains per hour timetable amounting to 264 daily train services on weekdays, which is a significant step up from the 180 daily services previously offered during the last six-month period, and more than those offered before the cessation of drivers volunteering to work rest days. Importantly—this is the really important part—the services are not dependent on rest-day working. That is good for Avanti, because it allows the company to put a roster together seven days a week, and it is seemingly good for the 90% of drivers who decided over the summer that they did not wish to work beyond their contracted hours. This timetable change represents an opportunity to put in place a long-term timetable base and to return to the extended booking horizons that passengers rightly expect.

I will touch on one point from the hon. Member for Stockport about catering services. I do not recognise those exact figures, but I will write to him. I have heard many stories where the catering services and the on-board service have just not been good enough, and within that we look to turn it around. He also touched on route knowledge and transferring between operators—a point with which the SNP spokesperson, the hon. Member for Paisley and Renfrewshire North agreed. We completely concur; it takes months of route knowledge to get a driver to be able to travel a route safely.

The Office of Rail and Road and Network Rail have reviewed Avanti’s plan and are supportive of the proposition, noting that its full and successful delivery requires agreement with trade unions. The Department is monitoring Avanti’s delivery and holding the company to account as appropriate. The new timetable started on Sunday 11 December—Sunday just gone. Alas, as highlighted by my hon. Friend the Member for Aberconwy, we are now in a further period of national industrial action, so it may take time to assess fully the performance of the new timetable. I put on record that I am grateful to all the staff at Avanti who have allowed us to introduce this new timetable.

Many hon. and right hon. Members have inquired about Avanti’s contract extension. On 7 October this year, a short-term contract was entered into with the incumbent operator. The contract extends the delivery of the West Coast Partnership and Avanti West Coast business for six months until 1 April 2023. This gives Avanti a clear opportunity to improve its services to the standards that we and the public expect. The Government will then consider Avanti’s performance while finalising a national rail contract for consideration in relation to the route, alongside preparations by the operator of last resort, should it become necessary for the operator to step in at the end of the extension period.

David Jones Portrait Mr David Jones
- Hansard - - - Excerpts

Can the Minister say in percentage terms what his expectation is for Avanti being able to deliver a full timetable by the end of March?

Huw Merriman Portrait Huw Merriman
- Hansard - -

I cannot, unfortunately, because as things stand we have industrial action. I would be unable to determine even what the service will be like into the first week of January, because there is an expectation when national industrial action takes place that only 20% of services can run, and the day after—a day like today—only 65% can run. Until that industrial action comes down, which I will touch on, I cannot give my right hon. Friend that assurance at all. I call on all parties in this House to call for industrial action to come down.

David Jones Portrait Mr Jones
- Hansard - - - Excerpts

I fully understand that we have national rail strikes, but putting that to one side, and focusing on the efforts that Avanti is making and the work that the Minister’s Department is doing, what is his expectation in percentage terms that Avanti will deliver a full timetable?

Huw Merriman Portrait Huw Merriman
- Hansard - -

My right hon. Friend is experienced in this place, and he will perhaps be aware that I cannot give a percentage. All I can say is that the rail regulator and Network Rail’s project management office have reviewed the recovery plan, and they are content, while recognising the challenges that the operator faces, that matters within Avanti’s control look to be within its control, and therefore it should be able to roll the timetable out. Indeed, with 100 extra staff and not working on rest-day working practices, Avanti should be confident, and I am confident as well, but I cannot give him a percentage figure, I am afraid; I can just give him my optimism.

Navendu Mishra Portrait Navendu Mishra
- Hansard - - - Excerpts

Will the Minister give way?

Huw Merriman Portrait Huw Merriman
- Hansard - -

I will not, because I want to make some progress, if the hon. Gentleman does not mind.

My hon. Friends the Members for Milton Keynes North and for Delyn called for the decision to award a short contract to have a “keep options open” status, and they are right to say that. An extension to the contract at this stage will not preclude transferring the contract to the operator of last resort at the end of the extension term.

I will respond to what the hon. Member for Stockport said in exchanges with the hon. Member for Slough, who then brought up the TransPennine Express franchise. I was asked specifically why the Secretary of State was blocking an offer to resolve issues at TPE. I am happy to tell the hon. Member for Stockport that the Secretary of State signed off an offer for rest-day working to be put back to ASLEF on TPE, because that rest-day working agreement was not extended at ASLEF’s request at the end of last year. That offer was made, so he will be pleased by the Secretary of State’s input, but it was rejected by ASLEF despite being equally the most generous at time and a half. I will work on the basis that he will call for ASLEF to take a refreshed view on that situation.

That leads me nicely on to workforce reform; my right hon. Friend the Member for Tatton and my hon. Friend the Member for Aberconwy both touched on industrial action. The way that passengers use the railway has changed. With more people working at home, we need to ensure that rail is put on a sustainable footing. The railway is losing up to £175 million of revenue each month as a result of fewer passengers post pandemic. That cannot continue. Passengers rightly expect a regular, reliable service seven days a week, but as we have found with Avanti, current shift patterns and voluntary weekend working for railway staff make that vision almost impossible.

Getting stuck in endless disputes will not solve any of that, or bring back the passengers that the railway so badly needs. The only solution is for everyone to come together and agree a new way forward. Contrary to what has been said, the Secretary of State and I have met the trade unions and heard their concerns. We helped to facilitate a fair offer that delivers a pay increase more generous than those in the private sector are gaining and that guarantees no compulsory redundancies. More than a third of RMT members voted to accept Network Rail’s proposal, despite being instructed not to. There is clearly an appetite among workers to strike a deal and I welcome today’s decision by the Transport Salaried Staffs Association—the second-largest union—to do just that. We urge the RMT to reconsider and to return to the negotiating table with the employers.

We have a once-in-a-generation opportunity to rebuild a world-leading network. The result will be a thriving rail industry that continues to support Britain’s economy and society for generations to come. The hon. Member for Stockport urged me, through the hon. Member for Slough, to get involved. I can tell him that after this debate, I will be sitting down with Mick Lynch from the RMT and the employers to try to facilitate some form of agreement.

Navendu Mishra Portrait Navendu Mishra
- Hansard - - - Excerpts

The Minister is being generous in giving way. On his point about the workforce, I encourage him to comment on low pay, zero hours and the treatment of cleaning contractors who work on the railway. Inflation is at almost 11% and they deserve fair pay and a decent pension.

Huw Merriman Portrait Huw Merriman
- Hansard - -

I will look into that and get back to the hon. Gentleman, because the stories that he shared need investigating. My constituent, who is also on a zero-hours contract, is concerned because every day that the trade unions go on strike on the railways, she loses her wages. She contrasted her wages with some of those taking strike action. I hope that we can work together in that spirit of compromise.

It is vital that we invest in infrastructure in the long term. The Department is investing £54 million to improve the power supply on the west coast main line at Bushey near Watford, which will create additional reliability and support the introduction of new bi-mode rolling stock for use on partially non-electrified routes, such as those in north Wales. In control period 7 between 2024 and 2029, we will invest more than £44 billion in the existing rail network to support Network Rail’s operations, maintenance and renewal activity. Network Rail’s business planning processes for control period 7 will focus on how the railway can contribute to long-term economic growth; support levelling up and connectivity; meet customers’ needs; and deliver financial sustainability.

As all right hon. and hon. Members have said, the west coast main line is critical to the national network today, but it is also important to the future of the railways. For example, on completion of High Speed 2 phase 2a, new HS2 trains will join the existing west coast main line to create direct services to places including Liverpool, Manchester, Preston, Carlisle and Glasgow.

Turning to the name change, my hon. Friend the Member for Aberconwy has made his pitch. All I can say is that, with a name such as mine, I am very much attracted to the idea, although I am sorry to say that my family came from south Wales rather than north Wales. However, that will not hold back the appetite for work.

Robin Millar Portrait Robin Millar
- Hansard - - - Excerpts

Will the Minister give way?

Huw Merriman Portrait Huw Merriman
- Hansard - -

I was about to conclude, but I will.

Robin Millar Portrait Robin Millar
- Hansard - - - Excerpts

I thank the Minister; he is being very generous with his time, and I shall be brief. The reason for the name change is not simply to change the name; it is to reflect the strategic importance of north Wales to the integration of the United Kingdom and everything that flows from that. Does he accept that?

Huw Merriman Portrait Huw Merriman
- Hansard - -

I do, and I accept that we are not talking gimmicks here; we are talking about detailed descriptions of what the line actually does, but also about what it can do to enhance the north Wales economy and community. I absolutely do get that.

To conclude, I thank my hon. Friend the Member for Ynys Môn and all right hon. and hon. Members for contributing to this important debate. Passengers on the west coast main line have had a torrid time, and we owe it to them to deliver a vastly improved service. The additional drivers, the move away from voluntary working and the new timetable afford the opportunity to turn matters around. I am determined to play my part. I expect Avanti, the unions and everyone connected with this to join me and ensure that this line delivers once again.

Nigel Evans Portrait Mr Deputy Speaker (Mr Nigel Evans)
- Hansard - - - Excerpts

This must be a Christmas miracle. We have had a debate on the west coast main line, and not only was it not cancelled at short notice, but it has not even run late. A miracle indeed! The final word goes to Virginia Crosbie.

Southeastern Railway Timetable Changes

Huw Merriman Excerpts
Tuesday 6th December 2022

(1 year, 5 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Huw Merriman Portrait The Minister of State, Department for Transport (Huw Merriman)
- Hansard - -

It is a pleasure to serve under your chairship, Ms Harris. I thank the hon. Member for Eltham (Clive Efford) for securing this important debate on Southeastern’s rail timetable changes, and I thank all right hon. and hon. Members who have spoken. I have always been a south-eastern MP. Over the past seven years, I have shared debates with many Members or their predecessors in Westminster Hall, the main Chamber and, indeed, meetings on Southeastern. I declare that as an interest, but I have always enjoyed working with south-eastern MPs.

I will do my best to cover the rationale for these changes and to explain the positives and negatives. I will explain the positive changes, although sadly there are no Members present from the constituencies where those changes will take place. I will certainly talk more about the consultation—or lack of one, as Members have pointed out. I will write to all Members who have contributed, so if I have not answered their points directly, I will ensure that we do so via correspondence.

I have met many Members, including my right hon. Friend the Member for Bexleyheath and Crayford (Sir David Evennett), and they have made their points with force. I appreciate what they said because I empathise with colleagues and their constituents who believe that the changes will negatively impact them. With any timetable change, some will feel that they are losing out. There is ultimately no way of making changes that will please everyone who uses the railway, but the changes are necessary, and I hope to highlight some of the reasons behind it.

The changes are driven by our current financial and travel habit situation. Travel habits have changed and there is a need to make our railways more financially sustainable, as well as improving their reliability. That has been the starting point. Within that framework, the team has worked hard to ensure that we will build a more resilient and reliable timetable through the process; again, I will talk more about that. The benefits of resilience and reliability will be there for all who use Southeastern, and we must look at the network as a whole. We must acknowledge that the pandemic has caused changes in travel habits, with many people who can adopting a hybrid approach, working from home some days of the week and/or travelling at different times of the day to avoid peak times. The new timetable needs to reflect that.

The changes in travel habits, alongside the successful introduction of Elizabeth line services, mean that all-day weekday demand on Southeastern services is around 70% of pre-covid levels. That figure drops to between 50% and 65% during peak periods. Demand simply does not warrant 2019 levels of service provision. The Government have earmarked £16 billion of funding for rail services since the start of the pandemic. That is taxpayers’ money and is clearly unsustainable in the long term, so the Department has asked all operators, not just Southeastern, to develop timetables that are appropriate to customer demand and that deliver good value for the taxpayer while prioritising the punctual services that customers rightly demand.

Clive Efford Portrait Clive Efford
- Hansard - - - Excerpts

Will the Minister give way?

Huw Merriman Portrait Huw Merriman
- Hansard - -

Can I go on a little further? I will touch on the three key reasons why Southeastern has changed its timetable and then I will give way. The first reason is efficiency and the post-covid rail situation. The timetable reduces train mileage to better match capacity to demand and changes the underlying structure to improve efficiency. At a time of unprecedented pressure on Government finances, this will save significant taxpayer subsidy and is essential to enable Southeastern to meet its spending review budgets. Southeastern is taking the opportunity to remove first-class seats from its mainline services, freeing up almost 4 million extra seats for all each year. That creates capacity without adding cost.

The second reason is punctuality and reliability, which are the No. 1 drivers of customer satisfaction as measured by Transport Focus. Today’s timetable includes many crossing moves at key junctions that have a damaging impact on performance. Furthermore, at times of service disruption, the current timetable leads to the spread of delays to other routes and makes it much harder to recover the service. By deconflicting key junctions and changing the base structure, the new timetable is estimated to deliver a 12% reduction in cancellations and a 3% improvement in on-time station stops across the whole Southeastern network services. That is 300,000 more on-time station stops ever year. I want to make clear that reducing the number of London terminals directly served on some routes, which have been touched on today, will dramatically reduce the number of trains having to make complicated crossing moves at Lewisham, a notorious bottleneck. That will significantly improve performance for everyone using Southeastern.

I will turn to the third part of the rationale, which is flexibility. The change provides a simpler, cleaner, basic structure from which services can be altered far more easily and efficiently. Should demand patterns change in the way that we all want them to, services can more easily be scaled up—or down, if that is not the case—subject to available funding, of course.

Clive Efford Portrait Clive Efford
- Hansard - - - Excerpts

The Minister gave figures for the reduction in demand. According to the ORR report I have in front of me, the peak of 183.2 million passenger journeys was in 2018-19. That is back up to 97.8 million, which is well over 50%. That is not the 65% reduction that I think he quoted. It is similar with the passenger kilometres, which are at 2,543 million, which is way over 50% of where we were at the highest point. What is happening is that rail services are recovering after covid, as we would expect. It is too early to make these decisions.

Huw Merriman Portrait Huw Merriman
- Hansard - -

I am happy to send our statistic base to the hon. Gentleman and others who have contributed to the debate, so that we can agree on our starting point. The ORR report also demonstrates that passenger contributions through the fare box were more than £12 billion during pre-covid time, and we have got back to only £6 billion. That in itself demonstrates that we do not have the same patronage across our services. He will know that commuting has been the worst hit, because commuters can work differently. I am confident that my evidence base will stack up for this, but I will exchange it with him and other to ensure that is the case. I am about to come to consultation, but I will take an intervention.

Matthew Pennycook Portrait Matthew Pennycook
- Hansard - - - Excerpts

I want to probe the Minister a little further on levels of demand. Southeastern approached the Department for the derogation on 22 June, so were using demand data from that time. Will the Minister give us a sense of what the Department thinks is the permanent level of demand reduction? Or does he accept that passenger numbers are steadily recovering, which may require the timetable to shift again very quickly?

Huw Merriman Portrait Huw Merriman
- Hansard - -

Again, we will come back to that. The point I would bring back is that during the peak times we have largely been talking about, the 70% of pre-covid level figure drops to 50% to 65% during those peak periods. We are arguing about different parts of the service at different times. That is why I want to write, to explain exactly where my base is. Members can write back and say that they have a different base.

There have been a lot of points about transparency. I hope that right hon. and hon. Members who have met me know that I have an absolute desire to ensure that all the facts that I have are all the facts that right hon. and hon. Members will have—[Interruption.] I will take one more intervention; why not?

David Evennett Portrait Sir David Evennett
- Hansard - - - Excerpts

I totally agree that the Minister has been helpful and transparent. We are very grateful for the meetings that we have had. My concern is that if there is no train service on the Bexleyheath line to Charing Cross at weekends, the passenger numbers will fall. Therefore, it is a flawed argument. I hear what has been said about the peak period, but I am also concerned about the weekends. We have already heard about the disadvantage for certain members of our communities who will not go up to London. It could be that Southeastern loses a lot more passengers and revenue at the weekends.

Huw Merriman Portrait Huw Merriman
- Hansard - -

My right hon. Friend makes a good point. This is the challenging balance for Government and train operators. The cloth has to be cut accordingly. If I look at my Southeastern service, I am now down to an hourly service, without the benefit of going up to Cannon Street but having to change at London Bridge, in the same way that Members are about to experience with their constituents.

I recognise the danger that, in order to grow the railway, it is necessary to demonstrate a positive experience. We do not want to get to a situation where the railway service looks like the bus service. At the same time, there has been time taken post pandemic to assess how passenger numbers have been performing and they have not performed with the level of uptick that we need to give us an indication that people will not change their work habits—they are not going to return to the office five days a week. That is why difficult decisions have had to be made, but my right hon. Friend makes a very good point and it will be taken into account.

On consultation, there has been a need to recast the Southeastern timetable for many years. The last recast was over a decade ago, when Southeastern’s highspeed services were introduced. Even before the pandemic, the timetable no longer matched demands and had inherent efficiency and structural performance issues. As has been pointed out, Southeastern has changed its timetable 15 times since March 2020. Coming out of the pandemic, the industry has had to continue to work at pace to provide rail timetables that meet the new travel patterns and carefully balance cost, capacity and performance.

Operators have had to move at speed to address changes in demand and deliver cost-efficient timetables. That means that traditional public consultation has not always been possible. It takes many months to design and consult on a timetable, and it would have been challenging for Southeastern to conduct a meaningful consultation without time to change the timetable based on the feedback it received. That ultimately means money spent on running an inefficient timetable for longer, costing the taxpayer money. Ministers at the time thought that this was unacceptable, and, as a result, agreed to allow operators to implement demand-led timetables through 2020 without consulting formally.

Going forward, fiscal pressures may mean that other relatively short-notice timetable changes need to happen. However, there are lessons to be learnt from this timetable change on engagement and information sharing with stakeholders, even if timescales are compressed. I say to all right hon. and hon. Members present that I will ensure that if changes need to be made there will be transparency and engagement with Members of Parliament and other stakeholders at the earliest opportunity. It may not be possible to do a full 16-week consultation, but I will ensure that the starting point is with Members in this place. That is what I would expect, and I give them that assurance.

While I am giving assurances, I was also asked by my hon. Friend the Member for Old Bexley and Sidcup (Mr French) for an assurance that there are no plans in place to close Albany Park station: there are no plans in place to close Albany Park station.

Vicky Foxcroft Portrait Vicky Foxcroft
- Hansard - - - Excerpts

There has been quite a lot of talk about Lewisham station, which is in my constituency. I can assure the Minister that Lewisham station is absolutely rammed at times, and there have been humungous safety concerns around it and the rerouting of passengers. We have had many new developments going up in the area. In the spirit of the Minister wanting to do consultations, would he like to come and meet me and Lewisham station’s user group—who are very expert in the rail network and Lewisham station—to hear their views on what might happen as we proceed?

Huw Merriman Portrait Huw Merriman
- Hansard - -

I have always enjoyed spending time with the hon. Member—if that does not damage her electoral chances—so I would be very happy to meet her and the user group. I will put out another offer at the end of my speech.

Since the publication of the timetable in September there has been a mixed reaction from stakeholders. Many are pleased by the delivery of long-held ambitions on their routes, but others, such as those on the Bexleyheath and Sidcup line, are concerned about the loss of direct services to either Cannon Street or Charing Cross stations at off-peak times. All passengers affected by losing direct services can change at London Bridge to access high-frequency services to either station at no extra cost, and without having to use the tube. I see the hon. Member for Eltham shaking his head—that is a change I do on a regular basis, and I know what it takes. I will explain why it is not the poor experience that some may think it to be.

London Bridge is a modern station that has been designed for high volumes of interchanging passengers. I understand that some Members have concerns about changing there, but I can assure them that, as someone who does the change often, the station is well designed for that purpose. We believe it is one of the best in the country. The station is well lit, is sheltered and has full CCTV coverage. Southeastern has completed an equalities impact assessment and has made further improvements, which include the increased provision of dedicated mobile assistance staff, on-site lift engineers to ensure that all platforms remain accessible and on-site paramedics for any emergencies.

I turn to some of the benefits that Members who are not here might receive from the timetable change.

Janet Daby Portrait Janet Daby
- Hansard - - - Excerpts

In conversation, many of my residents raised concerns about their daughters working up town quite late. The parents and the young women like the reassurance that they can get on the train at one end and be taken straight to their destination at the other, rather than having to change at London Bridge—no matter how lovely that station may be.

Huw Merriman Portrait Huw Merriman
- Hansard - -

That experience involves getting off the platform, taking the lift—while staying within the station, not going all the way through the station—and then going back up the lift to another platform that can be seen directly. It is a change that I see many do daily. I recognise that it is not ideal, and we would rather that it did not occur, but it is a safe, well-designed and modern station environment. I hope that that reassurance can be given to those who may be concerned.

Let me turn to the benefits. As with any timetable change, there are trade-offs. Inevitably, those who feel that they are losing out are making their voices heard. However, as well as the improved performance, which we believe will benefit everyone, the changes deliver a wide range of other benefits. In the metro area, passengers will benefit from the reintroduction of peak Beckenham Junction to Blackfriars services, and all metro services on the Herne Hill line will be extended to Orpington, which will benefit Bickley and Petts Wood. Bexleyheath line customers will enjoy an uplift to four trains per hour on a Sunday from the current two per hour. Passengers on that line will also have off-peak connections to London overground via New Cross for the first time.

The Sidcup line will receive a new peak service to Blackfriars via Denmark Hill, and Swanley will gain an all-day fast service via London Bridge. Woolwich line passengers will benefit from the new Elizabeth line offering 10 trains per hour from Abbey Wood at peak times, and eight for the rest of the day, as well as extra services on the DLR from both Woolwich and Greenwich. On the main line, the December 2022 timetable will deliver the long-awaited service from Maidstone East to the City of London in under an hour. Tunbridge Wells and Hastings services will see journey time improvements in the morning peak, and there will be new peak services between Cannon Street and Tonbridge. Finally, local services in Kent will see a service doubling of one to two trains per hour between Strood and Paddock Wood, which will improve connectivity on that corridor.

To conclude, I appreciate the concerns raised by some Members. We should bear in mind that the timetable changes will undoubtedly be affected by the planned industrial action. When we can evaluate, we will. There will be transparency. We will reflect and act accordingly. As part of that process, I can perhaps visit more services and stations. I have already given one offer, across the Chamber, to the hon. Member for Lewisham, Deptford (Vicky Foxcroft). Perhaps I can also offer to visit my hon. Friend the Member for Old Bexley and Sidcup and my right hon. Friend the Member for Bexleyheath and Crayford. I am keen to find out how the changes are bedding in. I ask all right hon. and hon. Members to allow the changes to bed in and see whether they work.

A1 Northumberland-Morpeth to Ellingham Development Consent Order: Deadline Extension

Huw Merriman Excerpts
Tuesday 6th December 2022

(1 year, 5 months ago)

Written Statements
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Huw Merriman Portrait The Minister of State, Department for Transport (Huw Merriman)
- Hansard - -

I have been asked by the Secretary of State for Transport, my right hon. Friend the Member for Forest of Dean (Mr Harper) to make this written statement. The statement confirms that it has been necessary to extend the deadline for the decision for the A1 Northumberland - Morpeth to Ellingham Development Consent Order under the Planning Act 2008.

Under section 107(1) of the Planning Act 2008, the Secretary of State must make his decision within three months of receipt of the Examining Authority’s report unless exercising the power under section 107(3) to extend the deadline and make a statement to the House of Parliament announcing the new deadline.

The Secretary of State received the Examining Authority’s report on the A1 Northumberland - Morpeth to Ellingham Development Consent Order application on 5 October 2021. The current deadline for a decision is 5 December 2022, having been extended from 5 January 2022 to 5 June 2022 by way of written ministerial statement of 15 December 2021 and then to 5 December 2022 by written ministerial statement of 6 June 2022.

The deadline for the decision is to be further extended to 5 September 2023—an extension of nine months. The reason remains as that set out in the written ministerial statement of 6 June 2022.

The decision to set a new deadline is without prejudice to the decision on whether to give development consent for the above application.

[HCWS413]

Rail Cancellations and Service Levels

Huw Merriman Excerpts
Thursday 1st December 2022

(1 year, 5 months ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts

Urgent Questions are proposed each morning by backbench MPs, and up to two may be selected each day by the Speaker. Chosen Urgent Questions are announced 30 minutes before Parliament sits each day.

Each Urgent Question requires a Government Minister to give a response on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Louise Haigh Portrait Louise Haigh (Sheffield, Heeley) (Lab)
- Hansard - - - Excerpts

(Urgent Question): To ask the Rail Minister if he will make a statement on rail cancellations and services, in particular across the north and nationwide.

Huw Merriman Portrait The Minister of State, Department for Transport (Huw Merriman)
- View Speech - Hansard - -

I thank the hon. Lady for her urgent question, which gives me the opportunity to set out the Government’s disappointment with the experience of many passengers, not just across the north, but in other parts of the country. We recognise that current performance is not acceptable and is having a significant effect on passengers and the northern economy.

I will focus on two operators to set the scene. The first is TransPennine Express services. TPE services have been impacted by a number of factors, including higher than average sickness levels among train crew, the withdrawal of driver rest day working, which is the option for drivers to work their non-working days as overtime, the withdrawal of conductor rest day working and other overtime working, and strike action on Sundays and some Saturdays since mid-February under a formal RMT union dispute.

TransPennine Express had a formal rest day working agreement with ASLEF that was due to expire in December 2021. The rates of pay under that agreement were 1.75 times the basic pay with a minimum of 10 hours paid, the most generous such agreement in the industry. In December 2021, TPE approached ASLEF seeking to extend the existing agreement. Rest day working forms no part of the terms and conditions, so either side is free to refuse or enter into the agreement when it expires.

On this occasion, local ASLEF officials refused to extend the agreement and sought to negotiate different terms. In the absence of a new agreement, drivers withdrew their rest day working when the existing agreement ended, and further offers have not materialised into an agreement. TPE is undertaking an intensive programme of crew training to eliminate a backlog of pandemic-induced route knowledge loss and delayed traction training, and to prepare the business for timetable changes such as the Manchester recovery taskforce December 2022 change.

Turning briefly to Avanti, the primary cause of recent problems with Avanti train services has been a shortage of fully trained drivers. It is a long-standing practice for train companies to use a degree of overtime to run the timetable, to the mutual benefit of staff and the operators. Avanti was heavily reliant on drivers volunteering to work additional days because of delays in training during covid. When volunteering suddenly all but ceased, Avanti was no longer able to operate its timetable. However, nearly 100 additional drivers will have entered formal service this year between April and December, and Avanti West Coast has begun to restore services, focusing on its key Manchester and Birmingham routes.

I will end by saying that we need train services that are reliable and resilient to modern-day life. While the companies have taken positive steps to get more trains moving, they must do more to deliver certainty of service to their passengers. We will fully hold them to account for things that are within their control, and we look for others to be held to account on matters that are outside of the train operators’ control.

Louise Haigh Portrait Louise Haigh
- View Speech - Hansard - - - Excerpts

I thank you, Madam Deputy Speaker, and Mr Speaker for granting this important urgent question. Rail services across the north are once again in meltdown. Today, almost 40 services have been cancelled on TransPennine Express alone—and those are just the published figures, because they were cancelled overnight. People are cut off from jobs and opportunities, investors I spoke to this morning in Manchester are thinking twice about investing in the north, and businesses are unable to recruit because their potential employees simply cannot rely on the train to get to work. The damage that this fiasco is doing is enormous, and in just 11 days, major timetable changes are due to come into force. I do not say it lightly, but if this were happening elsewhere in the country, the Government would have taken far greater action by now. Instead, they have—not just for weeks, but for months and years—forced the north to settle for a sub-standard service and to accept delays, cancellations and overcrowding.

Not only did Ministers allow that, but they actually rewarded the abject failure of the operators. Six years ago, TransPennine Express had exactly the same issues it faces today. Then, as now, it blamed staff shortages and rest day working. It said six years ago that it would recruit drivers and improve resilience, but here we are again, in crisis—and the public are paying the price. Have the Government sanctioned operators or demanded improvement? No. They continue to reward failing operators such as Avanti West Coast by extending their contracts. Yesterday, it was revealed that they signed off a decision for Avanti to hand over £12 million in taxpayers’ cash as dividends to its shareholders.

Enough is enough. We cannot continue like this. It is time for Ministers to take action. Will they put operators on a binding remedial plan to fully restore services or face penalties and withdrawal of the contract? Will they claw back the taxpayers’ money that Ministers have allowed to flow out in dividends? Can the Minister confirm whether the Secretary of State is preventing an offer on rest day working between operators and unions? Enough is enough. We cannot continue like this.

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I agree with the hon. Lady: we cannot continue like this. That is why we have set in place a series of talks and negotiations aimed at changing working practices so that train operators are not reliant on seeking the approval of workforce to run a seven-day operation. That just does not work for anyone—management, workforce or, indeed, passengers—because the train operators are then required to seek the voluntary assistance of workforce to work on certain days. The hon. Lady says that we cannot carry on like this and that enough is enough, so I hope that she will join me in pushing for reforms.

With regard to Network Rail reforms, a 4% plus 4% offer has been put on the table. That can be self-funded and allow workforce to move to better, more modern working jobs with more interaction with and assistance for passengers, and a better experience for workforce and the passenger. Yet we have been unable to reach an agreement. The hon. Lady refers to timetable changes. Those are vital for us to increase the number of Avanti services again, but if we have industrial action in December, it will be even more challenging to put them in place.

I join the hon. Lady in saying that enough is enough and that we need change. This Government are seeking to implement change, but as Opposition Members will know, that cannot be dealt with unilaterally. It requires the agreement of the unions to modernise and change working practices. That will give train operators the ability to roster on a seven-day working basis and to see training go through on a much swifter basis. We will then have the workforce in place and the resilience. I call on the hon. Lady to not just talk about the fact that we need change, but to work with us and to influence the unions to get that change delivered.

Edward Leigh Portrait Sir Edward Leigh (Gainsborough) (Con)
- View Speech - Hansard - - - Excerpts

London North Eastern Railway seems to have been less affected than other services. Does that not underline that importance of the campaign by my hon. Friend the Member for Cleethorpes (Martin Vickers) and me to get the through service from London via Market Rasen to Cleethorpes, so that we can take the pressure off TransPennine Express? Can we get on with the through train, which has been promised again and again? Action this day!

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

My right hon. Friend makes a great bid that is linked into this matter. I am happy to meet him and my hon. Friend the Member for Cleethorpes (Martin Vickers) to discuss that further. He is absolutely right that we see a knock-on effect. Take Northern, for example. It has been less impacted by the matters I have referenced than TPE and Avanti, but the knock-on from those operators—particularly TPE—has caused it to fall in parts as well. He is absolutely right to point out that contagion can pass from one part of the network to another. I will happily meet him.

Gavin Newlands Portrait Gavin Newlands (Paisley and Renfrewshire North) (SNP)
- View Speech - Hansard - - - Excerpts

Over the past two days, TransPennine Express has managed to run a total of 42% of its timetabled cross-border services from Glasgow Central. That is from a timetable that was already slashed, as TPE struggled to provide even a basic service to passengers. Add to that the Avanti shambles and cross-border services are a disaster. It simply is not good enough, and there are real implications for the cross-border economy.

Two separate industrial disputes involving ScotRail and the Scottish Government have been resolved this year, in contrast to the ongoing disputes across talks that have dragged on for months and are only now involving Government Ministers. The RMT’s general secretary Mick Lynch said yesterday:

“In Scotland and Wales, RMT has settled similar disputes with the support of the governments there but where companies are controlled by the DfT, time is running out.”

Previous Ministers have stood at the Dispatch Box and told us that disputes were for the talks and Network Rail to resolve, but clearly that stance is no longer fit for purpose. This Government are letting down Scotland and the north of England, and it is now well past time for rail to be fully devolved to Scotland. Will this welcome new and shiny team at the DFT meet me to discuss how we advance that?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

This shiny rail Minister will always happily meet the hon. Member. I have always enjoyed working closely with him in our previous roles, so I am happy to discuss matters with him. He talks about the ministerial approach, and I think it should be put on the record. Yesterday, the Secretary of State for Transport travelled up to the north to meet the northern mayors to discuss these issues. We want to work collaboratively with all those who can influence change. The Secretary of State’s trip yesterday demonstrates that we do not just talk about it—we actually want to deliver on it, as well. Both the Secretary of State and I have talked of the need to reach some form of agreement. We have not used the language that might have been expected or heard in the past. We want to work closely. We have both met Mick Lynch and his counter at the Transport Salaried Staffs Association. I am due to meet again with Mick Lynch, the trade unions, the train operators and Network Rail, so that will be the employers and the trade unions, with a Minister in the room, not to negotiate, but to try to facilitate some form of end and to allow this change to come through. I will happily meet the hon. Gentleman and all across the piece so that we can make a difference and get this settled.

Sara Britcliffe Portrait Sara Britcliffe (Hyndburn) (Con)
- View Speech - Hansard - - - Excerpts

As someone who travels on the Avanti West Coast service on a weekly basis, I know that delays and cancellations are the norm. Customers are being charged unreasonable prices for a very poor service. Can my hon. Friend confirm that he is meeting Avanti regularly to discuss its performance, as well as giving it six months to roll out a recovery plan and deliver long overdue reliability for passengers?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I am sorry for the experiences that my hon. Friend and her constituents have experienced, and that goes to all Members of this House, too. With regard to Avanti, from December it plans to operate 264 daily train services on weekdays, which is a step up from the 180 daily services at present. That would also be greater than the number prior to the refusal on rest day working, which has triggered this issue over the past six months. Of course, that is all contingent on having that co-operation, which I am keen to seek to get into place. The Office of Rail and Road has looked at the plans and signed them off, and we and officials meet Avanti on a weekly basis to hold it to account. We will continue to do so. As my hon. Friend points out, a shorter-term contract is in place. We need performance improvements to go beyond that stage.

Jeff Smith Portrait Jeff Smith (Manchester, Withington) (Lab)
- View Speech - Hansard - - - Excerpts

Yesterday, the West Midlands Mayor was late for that meeting with the Secretary of State to discuss the problems on trains because her train was cancelled. You couldn’t make it up. My constituents in south Manchester do not want to hear that the Government are disappointed with the problems; they want to hear that some action is being taken. What can I do to reassure my constituents that the Government will get a grip and get the train services sorted on the Avanti west coast main line and the cross-Pennine routes?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

Again, I pass on my disappointment with the experience that the hon. Gentleman has outlined. I want to be clear: we have been going on like this for years because we have a railway that just does not operate on a seven-day basis. We have leisure that has grown to 115% over weekends, and we still cannot roster the workforce. We require an agreement. Can one imagine Tesco operating on that basis? It just would not work. The tragedy when we look at the north is that we have a £96 billion infrastructure investment plan through the integrated rail plan, so we want to invest further in the north. However, the hon. Gentleman is absolutely right: if we cannot deliver the daily services right now, there is a danger that people will turn their back on rail. The only way to get long-term performance improvements is to reform the way we work the railways. We are trying to put those reforms in place, but it requires agreement from union and workforce, as well as Government willing.

John Penrose Portrait John Penrose (Weston-super-Mare) (Con)
- View Speech - Hansard - - - Excerpts

I completely support the Rail Minister in his comments that something has to change and that we cannot go on as we are. Can he confirm that the pattern of performance and service levels is dramatically better for providers offering open access—in other words, competitive services—compared with some of the more traditional post-franchising ones such as Avanti? It is vital for passengers to have choice on the same track between different providers, so that if one of them is suffering from driver shortages or strikes, the others may be able to pick up the slack or at least provide a service when others fail.

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I thank my hon. Friend, a former Minister, who has great expertise in and policy knowledge of this matter. He is absolutely right to champion open access. When we can actually drive competition through the system, one tends to see better outcomes and choice for passengers as a result. Open access, as we have discussed before, has some constraints. He certainly believes there is more that can be done, and I agree with him. We are keen—and I have asked my officials to look further at how we can do this—to provide more access for open access, and I am very happy to discuss that with him further.

Holly Lynch Portrait Holly Lynch (Halifax) (Lab)
- View Speech - Hansard - - - Excerpts

The Minister has just said that it is not a seven-day-a-week service, but actually it is not an any-day-of-the-week service currently. We have already heard from my hon. Friend the Member for Sheffield, Heeley (Louise Haigh) at the Dispatch Box that almost 40 services have been cancelled on TransPennine Express in just the last 24 hours in the middle of the working week. There is nothing new at all about the driver shortages that have been crippling service provision in the north. Can he be very specific about what the Government are doing to ensure that driver provision is there so that we can unlock the potential of our towns and our cities in the north of England?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I thank the hon. Member, and she is absolutely right. We cannot be in a situation where we are relying on good will; we need to make sure we have enough drivers in the system. The difficulty we have is that a driver contract for train operators is for 35 hours over four days, which leaves us with that block. We have struggled to get enough drivers through the training course due to covid and the restrictions in the cab, which is why there has been catch-up. This has been exacerbated by covid, but I want to move away from a situation in which we have to rely on good will. I want certainty, because that is certainty for the workforce, for the train operators and, most importantly, for the passengers that their train will arrive. However, it does require such an agreement to be in place for us to deliver the specific measures she has asked from me.

Anna Firth Portrait Anna Firth (Southend West) (Con)
- View Speech - Hansard - - - Excerpts

Does the Minister agree with me that service levels across the country are just as important? There have been 10 negative stories in the last month about the c2c line, which hard-working commuters from Southend West and Leigh-on-Sea need, including signal failures, overrunning engineering works and rush-hour queues to buy tickets. Would the Secretary of State sit down with me to discuss this level of service, and in particular our long-awaited disabled access at Chalkwell station and the long-awaited contactless ticketing?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I had perhaps better not promise that the Secretary of State will sit down with my hon. Friend because that may be above my pay grade, but I certainly will, and I will certainly ask him if he would like to do so. We are very keen to work with all hon. Members across the House on the specific issues they may have, hers among them.

My hon. Friend is absolutely right to say that, while this urgent question is on cancellations in the north, we are conscious that there has been a knock-on effect across the country and the network is not performing as we would like it to. One of the issues, and I again recognise that this comes down to the morale of both the management and the workforce, is that there is a contagion effect after strikes. We want a modern railway in which all in the workforce feel they have a future, with their jobs changing as ours all change and evolve, where there is more interaction with passengers and more pride as a result and we therefore see more passengers enjoying the experience. That is the passion I have for what we can do with rail. We just need everybody to work together to deliver it.

Ian Mearns Portrait Ian Mearns (Gateshead) (Lab)
- View Speech - Hansard - - - Excerpts

First and foremost, the train operators need to recruit and train more staff more quickly, and that would help to alleviate some of the strains we are working under. However, even when trains are working to timetable, travel times between cities and towns in the north of England are unacceptably slow—for instance, one hour and 20 minutes from Newcastle to Middlesbrough, which is 40 miles, and two hours from Newcastle to Carlisle, which is 60 miles. That is unacceptably slow due to antiquated infrastructure. When is something going to be done about this antiquated infrastructure in the north of England, so that we can travel as quickly as anyone anywhere else in the country?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

We are about to enter the next five-year control period where we will look at renewal. Where we have assets that have become tired, we will look at replacing them and moving away from some of the older forms of working to, say, digital signalling, which would allow more trains to enter blocks. I am happy to meet the hon. Gentleman to discuss that further, as he may have indicated that he would like. He is right that trains are a lot slower in certain parts of the country than others; I experience that in the south-east. It takes two hours to get to London from Bexhill, but the exact same distance in miles to Milton Keynes takes 32 minutes. There are parts of the country that do not get the same deal as others and we need to work even harder for them to make sure that their trains arrive.

Ian Liddell-Grainger Portrait Mr Ian Liddell-Grainger (Bridgwater and West Somerset) (Con)
- View Speech - Hansard - - - Excerpts

If we are talking about service level, Taunton station is an example of what we have got wrong in this country. We spent an enormous of amount of money on redoing the station, but the parking is inadequate; cars queue back to the road to get in; people cannot get in if they are disabled or have heavy bags; and people have to walk 100 yards to get a bus to go anywhere. The service level of our stations is not right, so how on earth can the service level of our trains be right? If the first points of call for people—the ticket offices, the staff who work in the stations and the type of stations we have—are not there, we have a fundamental problem. Can we please look at the way that stations are run in this country?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

My hon. Friend is right that we need to ensure that the entire experience attracts passengers and brings them back. It is about not just the service level, but the station experience. I travelled through Taunton station on Monday on my way to the reopened Okehampton line from Exeter. I am afraid that I did not stop off, so I was not able to experience what he has described, but I am happy to look at that further and discuss it with him. We have a station modernisation fund and the Access for All programme that is delivering more accessibility to passengers, which is vital. I will have a chat with him about it.

Chi Onwurah Portrait Chi Onwurah (Newcastle upon Tyne Central) (Lab)
- View Speech - Hansard - - - Excerpts

As well as being a global icon of the north-east, the Tyne bridge is a critical part of our transport infrastructure. We are all the more reliant on it given the atrocious levels of service on the railways and buses, and given the lack of investment in our northern infrastructure, such as Northern Powerhouse Rail. The much-needed restoration of the Tyne bridge from its current dilapidated state will lead to further disruption to our transport links, which really cannot get any worse. Will the Minister meet me urgently to see what can be done to mitigate the impact on our transport links of restoring our great Tyne bridge to its full glory in time for its 100th birthday?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

As I said, I am keen to meet as many hon. Members as require it—no doubt my officials will be tearing their hair out—and I am happy to meet the hon. Lady. We certainly know that, because our railways were built by our pioneering Victorians, much of the infrastructure needs renewal, some of which can be particularly complex and expensive to deliver. Ownership can have an impact on that as well. I am keen to meet her to find out more and see what we can do.

Jo Gideon Portrait Jo Gideon (Stoke-on-Trent Central) (Con)
- View Speech - Hansard - - - Excerpts

My hon. Friend might have seen the picture of me sitting on the floor of an Avanti train that was picked up by the media. Avanti’s response was mealy mouthed and gave every excuse under the sun—unions, working practices, leaves on the line, engineering works—but there is no excuse for bad management. As well as inefficient services, the services do not run on time and the ticketing is shoddy. If someone gets on a train, they cannot have a cup of coffee because the machines do not work, and there is overcharging. Everything to do with the Avanti rail service is appalling and I urge the Government to look at it in the round, not just at the reasons it gives for not running an efficient service.

--- Later in debate ---
Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I assure my hon. Friend that I do not just take the assurances that, “This is very difficult for us for all these third-party reasons.” We look at what every part of the system can deliver, including the management and those responsible for the contract. I have also heard other experiences, not least of Mr Speaker on his Avanti services, that show that things are absolutely not good enough for passengers.

We need to get Avanti to do better and we need to help it to do better as well. Where matters are within its control, I assure my hon. Friend that we will hold it to account through the Office of Rail and Road and the regular meetings that I have. Where matters are not within its control, we require it to do even more to mitigate them. I am keen that we see an improvement to the tone that is given out, the customer service and the updates.

Clive Betts Portrait Mr Clive Betts (Sheffield South East) (Lab)
- View Speech - Hansard - - - Excerpts

The other day, I read with amazement an article in The Guardian which said, with regard to cancellations on the TransPennine Express, that between the middle of October and the middle of November, the reported figures were between 5% and 12% a week, but actual cancellations were over 20% each week. The difference is that train operators do not count as a cancellation a train that is cancelled before 10 pm the night before. When train operators are penalised under their contracts for non-performance, are the cancellation figures used those that the train operators report, or those that passengers experience?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I will write to the hon. Gentleman and specify how those figures are calculated. I will also give him up-to-date figures from the methodology that we calculate. I am confident that those figures recognise the same experience that passengers have suffered and he has described, but I will write to him and set that out in full.

Michael Fabricant Portrait Michael Fabricant (Lichfield) (Con)
- View Speech - Hansard - - - Excerpts

The Minister comes to his position having been a very successful and, I think, very thoughtful Chair of the Transport Committee. He will know that there is a balance of blame—it is not just the trade unions, but also the operating companies. He will also know that lines such as London Northwestern had problems two years ago with a shortage of drivers, but it now seems to be working well. How long does he think it will take Avanti to get the number of drivers required for us to get a reliable service?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

My hon. Friend is very kind. I have always enjoyed working with him, and I know he has a great passion for rail projects within his constituency, as we discussed last night. Avanti’s plan is to bring on 100 new drivers, and to change the timetable on 11 December so that those drivers can add more services. The concern is that that takes place at the same time as industrial action is scheduled, over the month of December and into January. Given all the hard work from the drivers and those training them, and from the management to try to get those services in place, it will be difficult if we see all that undermined by wider industrial action. The plan is for 11 December, but if we cannot get the strikes called off, my concern is about our ability to roll that out.

Andrew Gwynne Portrait Andrew Gwynne (Denton and Reddish) (Lab)
- View Speech - Hansard - - - Excerpts

I accept the sincerity of the Minister, but “disappointment” from the Government frankly does not cut it. These issues have long been known for at least the past six years or more. They are not new or particular to Avanti and the TransPennine Express, which are just manifestations of the problem right now. Last month we had more than 4,000 cancelled services, on top of 17,800 fewer services that had been pulled from the timetable. Why are Ministers not demanding a binding remedial plan urgently to restore the services that are desperately needed in communities, not just in the north of England but all over the country?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I agree with the hon. Gentleman. For too long we have worked in a manner that does not allow us to plan ahead and give certainty to the passenger or the workforce. TransPennine Express had too much reliance on the rest-day agreement. It seemed to operate because it was at 1.75 wage, which is the highest. Two other train operators operate at 1.5, and the others are much lower or have just normal rates. That was a high rate, and we could not get ASLEF to continue to operate it, which exacerbated the issue. There is too much reliance on rest-day working. When it operates, it works well, because train operators do not have as many drivers in place, but the train drivers earn overtime from that. When industrial action comes in, that breaks down. We want to move, and our modernisation plans and reforms, which we are trying to get an agreement to put in place, would deliver a seven-day railway where we are not reliant on rest-day working. That is the kind of certainty we want brought in, and that is the only way we will ever be able to avoid such issues in the years to come.

Chris Clarkson Portrait Chris Clarkson (Heywood and Middleton) (Con)
- View Speech - Hansard - - - Excerpts

It will not have escaped the Minister’s attention that a number of MPs from Greater Manchester are in their places. The west coast main line is essential to our local economy, so we need three services to London an hour, but as far as I can tell, the schedule is currently designed using a tombola. I am convinced that the Minister is serious about getting modernisation in the way in which Avanti runs the service, but should there be no significant improvement at the end of the six-month period, will he outline the steps he will take to ensure that we have a functioning service? Greater Manchester cannot afford what is going on at the moment.

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

Our plan, as signed off by the Office of Rail and Road, was always to see Avanti deliver the extra 100 drivers, change the timetable and then bring services back. As I specified, that would have seen us operating more services than had been the case before the end of June, when arrangements saw drivers not taking up rest-day working. At the moment, we are contingent on the drivers to ensure that that new timetable is put in place. However, it is a two-way process—we cannot unilaterally force it, because we do not have the ability.

On my hon. Friend’s question about the contract, it was renewed for six months, but we will not wait until the end of those six months—we will need to see improvements in place at the beginning of the year to make that decision. I make the point again that where matters are in the control of Avanti to deliver, we hold it to account. Where matters are outside of its control and in the control of the unions, we must take that into account as well.

Navendu Mishra Portrait Navendu Mishra (Stockport) (Lab)
- View Speech - Hansard - - - Excerpts

The parent company of TransPennine Express is FirstGroup and Avanti West Coast is a joint venture with 70% ownership by FirstGroup. Does the Minister see the link? Gross mismanagement by FirstGroup is causing utter chaos in my constituency and damaging the economy of Stockport and the wider north-west region.

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I am aware of that. I am also aware that the lead negotiator for the train operators is the chief executive of FirstGroup and that those two entities have had those specific issues targeted against them while other train operators perhaps have not. Again, my tone and my message is to try to bring all parties together so that we can improve the service for our passengers and give them more confidence. If we are not careful—this applies to everybody involved in rail, including me—people will give up on rail, and that will cause us even greater challenges in funding the timetable that we have. It is in the interests of management, shareholders—they continue to benefit if revenues grow—and absolutely the workforce and the passengers that we turn this around. We will do that only by working together.

Simon Fell Portrait Simon Fell (Barrow and Furness) (Con)
- View Speech - Hansard - - - Excerpts

My constituents are fortunate to rely on both Northern and Avanti—it feels like they have won a ghastly lottery. Yesterday, I got an email from Steve, a constituent based in Ulverston, who travels from Kirkby to Whitehaven to work in Sellafield. He says that the trains are late and cancelled, that there are horrendous bus replacements and that, on return, there are direct trains that miss out the smaller stops. It is an unviable service. The service on Avanti is abysmal, but those who rely on smaller operators are also seeing a really bad service. With that in mind, will my hon. Friend confirm that he will do everything in his power to restore trains to a level of service that our constituents all deserve and expect?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

My hon. Friend is right. Of course, Northern is in the control of the operator of last resort, which is what would occur in the event that we took away a contract from one of the private train operators. Perhaps his point on Northern demonstrates that we can talk of stripping contracts away, but ultimately how the entire system operates needs to change; just changing the contracts does not change the passenger experience for the better. I am sorry to hear of his constituent Steve’s experiences. Such experiences have been relayed to me by many colleagues on the Government side who have just had enough. With Northern, we see that, while it has a 6% cancellation rate, the knock-on from TPE is causing many of its challenges. That is another example of how one part of the system can knock over another part.

Christian Wakeford Portrait Christian Wakeford (Bury South) (Lab)
- View Speech - Hansard - - - Excerpts

Another month, another urgent question to discuss how companies such as Avanti are taking not only our constituents, but all of us, for mugs. As I have mentioned to the Minister before, we keep on getting claims of progress and improvement, but we continue to reward failure. Just last week, the last direct train from Manchester to Euston was at 2.15 pm. The Beveridge report was released 80 years ago, and one of the five giant evils it identified was idleness; we are certainly seeing that with Avanti, and I would argue we saw it from the Government prior to this mess as well. When will the Department stop idling and sort out this mess?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

The Department is certainly not idling: our officials work incredibly hard, and we hold train operators to account to ensure they do everything they can. As I mentioned, the Secretary of State was up in Leeds yesterday meeting the Mayors of Manchester, Leeds, and the other great northern cities. We are focused on not just putting the reforms in place, but seeking the agreement of all those who we require to do their part to ensure we get agreement—as I have said, it is not a unilateral process, but one that requires parties to come together. Tomorrow, I will be sitting down with the employers, trade union representatives and Network Rail to see what more we can do. There is certainly no idleness on our part.

Natalie Elphicke Portrait Mrs Natalie Elphicke (Dover) (Con)
- View Speech - Hansard - - - Excerpts

I put on record the usually good service that we receive from Southeastern workers. However, rail use is still not where it needs to be, and there is no doubt that days—indeed, now months —of strike action are affecting rail use and confidence in the railways. Can my hon. Friend confirm that he and his ministerial colleagues are doing everything they can to urge the unions to get around the table, end these strikes, and stop damaging confidence in all our railways?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I thank my hon. Friend. I know she is a passionate advocate for transport in Dover as a whole; I am a fellow Southeastern user, so I experience some of what she has talked to.

I am particularly concerned about the month of December and the impact it will have on the economy. A series of strikes will cover a four-week period over Christmas. Not just the strikes but the unofficial action can have the exact same ramifications. As someone who is passionate about rail, and always has been—as someone who believes that rail has a great future, and who sees the investment that this Government are putting into rail, not least in the north—my concern is that we will never really harness all those improvements if we cannot change the current working practices. I urge everybody to think about what more they can do in the spirit of compromise. It is Christmas; I would urge settlement.

Jim Shannon Portrait Jim Shannon (Strangford) (DUP)
- View Speech - Hansard - - - Excerpts

I thank the Minister for his very concrete and helpful answers, as we would expect of him. As we approach the festive season, thousands of people—some of them my constituents—will be travelling from all over the United Kingdom of Great Britain and Northern Ireland, visiting their loved ones and friends this Christmas. The announcement of further rail strikes has stoked fear of disruption for so many, and has introduced uncertainty in their travel arrangements. What immediate steps are being taken to find a solution and ensure the smooth running of public transport as we come into the busiest weeks of the year, so that my constituents will know that they can travel and get where they are going on time?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

What the hon. Gentleman has described is a huge concern. Last December, there was uncertainty about the ability to travel; we thought we had moved beyond that. As that uncertainty related to health, one could say that it was beyond control, but this action is within control: it is still possible for the unions to take the strike action down so that people can get to see their loved ones across the country, and so that businesses can reopen and recover after the terrible time they have had. For many companies, December is make-or-break time: if they do not get a December in, they may not see January. We all have to think about this in an altruistic manner and see what more we can do. We will certainly do so on our side of the fence; we need the trade unions—they, ultimately, can call off the strikes or action them—to take those strikes down.

Mark Jenkinson Portrait Mark Jenkinson (Workington) (Con)
- View Speech - Hansard - - - Excerpts

The number of daily services from Carlisle and Penrith to Euston that my constituents use is significantly reduced from previous levels, and the services that are running are timetabled at a much longer length than they used to be. Despite that, the percentage of services that are running on time hardly hits double figures. It is not the fault of my fare-paying constituents that Avanti has chosen short-term cost savings over driver training. Why are we delaying the inevitable, and when will we strip Avanti of the contract?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

Again, I am sorry for the experiences that my hon. Friend and his constituents have had to endure. It takes about 18 months to fully train a driver. A lot of hon. Members will find that extraordinary, but I sat in a cab on Monday and I saw that it is a technical and difficult job. However, there may be more improvements that we can make. During covid, there was a hold-up in what would have been the usual 18-month period, because it was not possible for the unions to have workforce next to workforce for health and safety reasons. However, I again make the point that we should not rely on rest-day working arrangements. We should have driver resilience in place so that we can fully run a seven-day train operation. That requires not only us to implement change, but the workforce, through the unions, to accept that change. I very much hope that they will and that all hon. Members will do everything they can to persuade them and make that case.

Greg Smith Portrait Greg Smith (Buckingham) (Con)
- View Speech - Hansard - - - Excerpts

My hon. Friend is right to point out the myriad issues that the railways face. Chiltern Railways serves a great many of my constituents, and delays, the use of shorter trains than expected and cancellations have crept in, when we never really saw that with Chiltern before. The difference seems to be Network Rail’s ability to allow flexibility in the timetabling for Chiltern to run additional services or move its rolling stock around. What can we do, with Network Rail, to get greater flexibility to allow Chiltern to serve its consumers much better?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I know my hon. Friend’s line well, because he represents my mum and my family. He is right that we need to ask not only the workforce, but Network Rail to modernise. For example, is it still the case that engineering works should take place at weekends, when we have seen the greatest growth at weekends and use has perhaps dropped off on other days of the week? I am not saying that we will change things in that way, but we will look at ensuring that we have the best possible case in relation to when Network Rail intervenes on the asset and takes it over. I absolutely give him that assurance. I am sure that, as a member of the Transport Committee, he can give me much more guidance on how I should do that.

Chris Loder Portrait Chris Loder (West Dorset) (Con)
- View Speech - Hansard - - - Excerpts

I warmly welcome my hon. Friend’s work to facilitate the negotiations and encourage unions and rail providers to get to a deal that solves these issues. A month ago, however, the TUC paid fully for members of the shadow Cabinet to go to Madrid to get hints and tips from the Spanish unions on how to use hard-working union members to fulfil Labour’s objectives to fully disrupt the railway. [Interruption.] Will my hon. Friend join me in calling on Labour to get off the picket line and condemn the official and unofficial strike action that we are seeing?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

My hon. Friend is another esteemed member of the Transport Committee and I thank him for what he does. I heard some responses from Opposition Members. Perhaps I can set the tone on this: I will work collaboratively with the trade unions, and I recognise that they have a role to play in representing their members, and that they can influence change, because they can deliver it. I want to do that and have always done that with the trade union leaders with whom I have worked. They have that pledge from me.

I will meet Mick Lynch tomorrow and I very much hope that we can have a good conversation. However, my hon. Friend is absolutely right. When push comes to shove, the train operators, Network Rail and the Government are not putting the strikes on; the trade unions are. They have the choice as to whether we go ahead with a really damaging December for the railway and the economy, or whether we lift that gloom and have a good, positive Christmas. It is in their hands and I very much hope that they take the opportunity to take down the strikes.

Elliot Colburn Portrait Elliot Colburn (Carshalton and Wallington) (Con)
- View Speech - Hansard - - - Excerpts

This is not just about Avanti and Northern Rail. Commuters coming from Carshalton, Wallington, Hackbridge and Carshalton Beeches stations are also struggling because of morning commuter changes made by Govia Thameslink Railway. Will the Minister agree to another meeting with me and colleagues representing constituencies served by Southern and Thameslink to ensure that that issue can be tackled?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I am very happy to meet my hon. Friend. He talked about other colleagues in the GTR network and that includes me, because that is an operator in my constituency. We recognise that improvements are needed from GTR, and officials are working with GTR in that regard. That is important; I recognise that although this urgent question is about cancellations to the north, we should be talking about service improvements that need to be made to the entire network.

Nigel Evans Portrait Mr Deputy Speaker (Mr Nigel Evans)
- Hansard - - - Excerpts

I thank the Minister for responding to the urgent question for almost 45 minutes.

Luton Train Station Redevelopment

Huw Merriman Excerpts
Monday 28th November 2022

(1 year, 5 months ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Huw Merriman Portrait The Minister of State, Department for Transport (Huw Merriman)
- View Speech - Hansard - -

It is a pleasure to respond to my first Adjournment debate. I congratulate the hon. Member for Luton South (Rachel Hopkins) on securing today’s debate on Luton station in her constituency. I know her constituency well—she rumbled me as an Arsenal fan, but it is fair to say that my nearest top-quality football team would have been Luton, as I was brought up in Buckinghamshire. I have family who live near Luton and, I am pleased to say, are big Luton Town supporters. I wish the team well in their bid for premiership promotion.

This is an exciting opportunity for me to talk about the work that we are delivering across the rail network to enhance stations and bring them into the 21st century. As the hon. Member rightly said, stations act as a gateway to towns and cities, and connect people to new opportunities for work, education and employment. We share her belief that stations must therefore be inclusive, accessible and fit for purpose.

I know that Luton has ambitions for its station to be a gateway to the town, not only to provide a positive first impression for visitors, but to enhance the ambience in and around the station for its residents and rail users. It will also provide an additional reason for potential future investors and businesses to choose Luton. On that basis, I would be happy to come and see the hon. Members for Luton South and for Luton North (Sarah Owen) in their Luton constituencies to see it for myself. As the hon. Member for Luton South said, it is only 25 minutes from London, but it might be even closer if I go and see my mum at the same time.

I assure the hon. Member that Luton is being actively considered in our plans for growth. The Government have demonstrated our commitment to invest in the town. We are delivering accessibility improvements at Luton station, as well as enhancements to bus services across the town and beyond. We are also improving road access to London Luton airport and investing in regenerating Luton’s town centre. I will explain further details of our plans for growth in Luton.

On the Access for All programme, our first priority at Luton station is accessibility. No passenger should be inhibited from accessing the opportunities presented by rail travel, whether as a result of a disability or struggling to carry pushchairs or luggage up the station steps. That is where the Access for All programme comes in.

With £383 million available across England and Wales until 2024, Luton station, as the hon. Member pointed out, is set to receive Access for All funding to provide accessible routes to all four of the station’s currently inaccessible platforms. To her question, the project is currently in design stage and is due to complete by 2024. I understand that there was a delay due to a lack of planning consent, but if the council agrees and we start next year, we should be able to complete by 2024. I assure her that I will write to her about the specific points that she raised. Our Access for All programme will have delivered more than 300 step-free accessible routes, and smaller accessibility improvements, at more than 1,500 stations by 2024.

We will also continue to invest more widely in Luton town centre. In 2021, Luton Borough Council received £20 million from round 1 of the levelling-up fund to fund the first step in redeveloping the area around Luton station and the entrance to the town centre. This project will set a new standard for redevelopment and provide confidence to the private sector to unlock other key sites that are ripe for development. This will build on the improvements already in place, such as the busway and interchange adjacent to the station and the improved access to the town centre. I know these public realm improvements are all part of the wider masterplan ambition for Luton to create a hub for business and employment, leisure and entertainment.

Through the local growth fund, we have invested £4 million for the development of the Hat district in the town centre, close to the station, providing over 130 new jobs and more than 1,700 new opportunities for skills-based learning; £1.2 million to improve road capacity around Luton airport, which will also enable the development of 800 new homes and the creation of 750 new jobs; and £800,000 towards new bus stops and access points on the Dunstable to Luton busway.

We are also providing—if the hon. Lady does not mind my giving out the shopping list—over £19 million as part of Luton’s bus service improvement plan to deliver enhanced bus services across the town. I hope that makes it clear that we are making massive investments across Luton’s transport network. In addition, my Department is providing the council with around £10 million for the maintenance and small improvements of Luton’s highways for the period 2022 to 2025.

Turning back to rail specifically, I would now like to talk about some of the national programmes that my Department is championing, and that Luton and the surrounding communities could directly benefit from. However, before I do that, I should recognise the plea of the hon. Member for Luton North about Leagrave station. I do not know whether it will be possible to fit in a visit at the same time, but I will look into that application, and see where it currently sits and where we go from there. I know what it is like to be disappointed with applications, because I have had many myself.

More centrally, where communities are not yet served by rail, we are building new stations accordingly. The new stations fund has already delivered eight new stations across England and Wales—most recently, Bow Street station in 2021, with five new stations due to open in 2023 at Portway Parkway, Reading Green Park, Thanet Parkway, Marsh Barton and White Rose.

We continue to make good progress on our commitments in the 2021 plan for rail, which set out how the railway must specifically evolve to meet the needs of its customers. As part of this plan, we are committed to a comprehensive accessibility audit of rail network facilities. Once the audit is completed, publicly available data will enable passengers to better plan their journeys and will enable us in Government to make better investment decisions to bring the entire rail network into the 21st century. We are already 90% of the way to completing this audit of Great British mainline stations, ahead of schedule, and we expect the remainder to be completed by spring 2023. I very much hope that the hon. Members for Luton South and for Luton North will work—I know they will—with local authorities and the rail industry to leverage these opportunities for investment in rail in and around Luton.

The autumn statement recommitted to transformative growth plans for our railways. We are investing significant amounts in rail enhancements across Great Britain to grow and level up the economy and to spread prosperity and opportunity. We will review the rail network enhancements portfolio, and announce the update once this work is complete.

Finally, I am aware of the strong aspirations of the hon. Members for Luton South and for Luton North for a full redevelopment of Luton station. Their advocacy on behalf of their constituents is admirable and genuinely felt and meant. I was concerned to hear that aspirations for full redevelopment may have previously delayed investment in accessibility at the station. I pledge to work with them to work out how we can ensure delivery of the accessibility points while also keeping in mind their aspirations for wider regeneration.

Luton now has an opportunity to become fully accessible in the short to medium term, with benefits to a wide range of users. I hope the hon. Member for Luton South will support those works. In relation to her aspirations for a wider regeneration of the station, I urge her to work with local authorities, the local enterprise partnership and the rail industry to develop a business case for such works, including identifying funding sources for their delivery. Once again, I thank the hon. Member for securing this debate on the redevelopment at Luton station, and I look forward to working with both hon. Members to see how that can be delivered.

Nigel Evans Portrait Mr Deputy Speaker (Mr Nigel Evans)
- Hansard - - - Excerpts

I congratulate the Minister on his maiden speech from the Dispatch Box.

Question put and agreed to.

Oral Answers to Questions

Huw Merriman Excerpts
Thursday 24th November 2022

(1 year, 5 months ago)

Commons Chamber
Read Full debate Read Hansard Text Watch Debate Read Debate Ministerial Extracts
Jeremy Wright Portrait Sir Jeremy Wright (Kenilworth and Southam) (Con)
- Hansard - - - Excerpts

3. What steps he is taking to help ensure those people adversely affected by HS2 are compensated fairly.

Huw Merriman Portrait The Minister of State, Department for Transport (Huw Merriman)
- View Speech - Hansard - -

Compensation is available to property owners affected by HS2, in accordance with the compensation code. We aim to be fair, while protecting the public purse.

Jeremy Wright Portrait Sir Jeremy Wright
- View Speech - Hansard - - - Excerpts

I welcome my hon. Friend to his new responsibilities and offer him my sympathy that one of them is HS2. He will know that for those who find themselves in the path of this project, obtaining compensation is a painful and long drawn-out experience. That is particularly true for those subject to compulsory purchase, where payments are delayed. Where they are delayed, there are very low rates of interest, and valuations are heavily contested. That is not meeting the promise that he referred to, that the Government would be fair and that people would not be worse off as a result of this project. May I ask him to look urgently at this problem? In particular, will he look at those low rates of interest that are paid on delayed payments? The Government legislated to increase those rates but never brought the measure into effect.

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I thank my right hon. and learned Friend for his warm welcome of my entire portfolio; I am very proud to be covering HS2 and rail. Some £3.2 billion has already been paid out in land acquisitions, and more is to be paid out. The Government did recognise that there were problems with acquisitions, and a report was commissioned by a predecessor of mine. We will ensure that we can learn lessons. With regard to the payment of interest, HS2 Ltd pays interest at 0.5% below the Bank of England base rate, and there was a period of two years between 2020 and 2022 when no interest was paid because the base rate was below 0.5%, but I am willing to meet my right hon. and learned Friend to discuss these matters further.

Grahame Morris Portrait Grahame Morris (Easington) (Lab)
- View Speech - Hansard - - - Excerpts

I welcome my hon. Friend the Minister to his position. I remind him that Mark Thurston told the Transport Committee that the anticipated spend for the current year was within the envelope of £5.7 billion. My question relates to how that £5.7 billion is being used in terms of procurement. What can the Minister and the Department do to encourage or specify the use of British steel for rails and structures within the terms of the contract?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I thank the hon. Member, or should I say my hon. Friend, as he is indeed that. I recognise all the work that he has done and continues to do on the Transport Committee. I thought he might ask that question. Some £122 million of British steel has been purchased by HS2. I am keen that we talk to HS2 more about how it can further invest in British steel. I will supply him with figures on how much steel has been produced from outside the UK, because that is how we will end up holding to account. Some 60% of the HS2 procurement contracts will go to small and medium-sized enterprises, as well as large entities such as British Steel.

Gareth Johnson Portrait Gareth Johnson (Dartford) (Con)
- Hansard - - - Excerpts

4. What recent discussions he has had with National Highways on closures of the Dartford crossing due to protests.

--- Later in debate ---
Emma Lewell-Buck Portrait Mrs Emma Lewell-Buck (South Shields) (Lab)
- Hansard - - - Excerpts

7. What steps his Department is taking to deliver Northern Powerhouse Rail and the Leamside line.

Huw Merriman Portrait The Minister of State, Department for Transport (Huw Merriman)
- View Speech - Hansard - -

As set out in the autumn statement, the Government are committed to delivering the Northern Powerhouse Rail core network outlined in the integrated rail plan. Reopening of the Leamside line would be best considered by north-east partners as part of a future city region settlement.

Emma Lewell-Buck Portrait Mrs Lewell-Buck
- View Speech - Hansard - - - Excerpts

Yesterday, at the Great Northern conference, the Transport Secretary promised that Northern Powerhouse Rail will indeed go ahead. Since the Government know that it is going ahead, they should also know what that entails. Does it, or does it not, include the Leamside line?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I thank the hon. Lady for her question. I am aware that the Leamside line closed in 1964, that she and others across the Chamber have been campaigning for its reopening and that Transport North East is currently conducting a series of studies into the costs and potential benefits. I will restate that the integrated rail plan stated that it would be best dealt with as part of a future city region settlement. Of course, we will await further details from Transport North East as they come out.

Paul Howell Portrait Paul Howell (Sedgefield) (Con)
- View Speech - Hansard - - - Excerpts

I welcome the Minister to his place. When it comes to Northern Powerhouse Rail, can we remember that it is not Manchester Powerhouse Rail or Leeds Powerhouse Rail? It is Northern Powerhouse Rail and that includes the north-east. The Leamside line is a critical part of the infrastructure, which gets us resilience locally, resilience in connections to the Union and local transport initiatives. Could I encourage the Minister to meet me, Transport North East and other interested Members to appreciate its importance to the north-east fully and to ensure that it is considered properly?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

My hon. Friend is a true champion for rail in the north-east, and I know that he has been campaigning for the reopening of the line. I agree that the northern powerhouse means the entire north and not just parts of the north; that is the culture that I see. I commit to meeting him, Transport North East and other bodies that he wishes to invite for further discussion. However, I remind the House that funding budgets are tight for the Department for Transport and that not every single project that Members will want to see can be brought forward.

Lindsay Hoyle Portrait Mr Speaker
- Hansard - - - Excerpts

I call the shadow Secretary of State.

Louise Haigh Portrait Louise Haigh (Sheffield, Heeley) (Lab)
- View Speech - Hansard - - - Excerpts

I warmly welcome the new Secretary of State and the entire ministerial team—and in particular the former Chair of the Transport Committee, the hon. Member for Bexhill and Battle (Huw Merriman), who I am sure will bring his expertise and experience to the team. Of course, the problem for him and the benefit for the Opposition is that we know what he really thinks. [Laughter.] Has he managed to persuade the Secretary of State that the integrated rail plan under-serves the needs of the north and lets down those who require change the most?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I thank the hon. Lady for her very warm welcome and her pledge to hold me to account on things that may have been written before. I am passionate about seeing the entire levelling up of the United Kingdom when it comes to rail. On the integrated rail plan, I gently remind her, using words from a Transport Committee report, that we welcomed

“the scale of the Government’s promised spending on improving rail in the North and the Midlands. £96 billion is a very substantial sum; it has the potential to transform rail travel for future generations”

and level up the country. Wise words; I still believe in them now.

Louise Haigh Portrait Louise Haigh
- View Speech - Hansard - - - Excerpts

I thank the Minister for that gentle reminder. He knows full well that that was not what was promised to the north and the midlands no fewer than 60 times and in successive Conservative manifestos. Not only are the north and the midlands not getting the infrastructure that they require, but rail services across the country are in freefall, experiencing record cancellations on top of fewer services than at any time since records began. One couple wrote to me this week and said they felt in danger from overcrowding and began to understand how real tragedies could occur. Will the rail Minister apologise for his predecessor’s signing off the decision to slash tens of thousands of services every month and confirm when those services will be restored?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

It is of course the case, post the pandemic, that travel habits have changed. Rail is at only 80% of its pre-pandemic patronage but services have been reduced by only 10%, so we continue to subsidise on that basis to the tune of £16 billion. There is a great commitment to rail on behalf of the Government across the country, but we have to look at the entire taxpayer burden that is paying for that and difficult decisions will have to be made. I very much hope I can work with the hon. Lady in a constructive manner to ensure we talk up rail and try to get more people on the rail network, and that it continues to grow as it had before the pandemic.

Virendra Sharma Portrait Mr Virendra Sharma (Ealing, Southall) (Lab)
- Hansard - - - Excerpts

8. What recent estimate he has made of the number of people waiting for a practical driving test.

--- Later in debate ---
Geraint Davies Portrait Geraint Davies (Swansea West) (Lab/Co-op)
- Hansard - - - Excerpts

13. Whether he has plans to increase rail funding in Wales.

Huw Merriman Portrait The Minister of State, Department for Transport (Huw Merriman)
- View Speech - Hansard - -

This Government are investing through Network Rail up to £2 billion in the rail network in Wales over the current five-year control period to March 2024. That is twice the level of investment carried out in the previous five years.

Geraint Davies Portrait Geraint Davies
- View Speech - Hansard - - - Excerpts

The Minister will know that HS2 will reduce travel times from London to Manchester from two hours 10 minutes to one hour 10 minutes and by even more to Scotland, yet the travel time by train to Swansea, which I represent, will remain at about three hours. How is it that Scotland will get an additional £8 billion in Barnett consequentials but Wales will not get the £5 billion that it should get, given that in the past 12 years we have seen only 1.5% of the rail enhancements go to Wales? Will he look at that again and meet me to discuss it, so that we can have our fair share to deliver net zero, improve productivity and deliver levelling up?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

The hon. Member is right that there are no direct Barnett consequentials from HS2 to Wales, but there are indirect benefits that I can explain when I meet him—to take up his invitation to meet. I welcome the fact that the Office of Rail and Road reports that Government funding for the operational railway was £1.27 per passenger kilometre in England and £2.39 per passenger kilometre in Wales and Scotland, which I am keen to support.

Virginia Crosbie Portrait Virginia Crosbie (Ynys Môn) (Con)
- View Speech - Hansard - - - Excerpts

I welcome the Minister to his place. The Government are committed to levelling up, and that means improving transport and connectivity for my Ynys Môn constituents. How is the Minister using RNEP—the rail network enhancements pipeline—to improve north Wales journey times; will the scope be extended to include rail links to HS2 and the northern powerhouse; and when the Minister visits Ynys Môn, will he come by train?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I will certainly come by train to meet my hon. Friend, who is a true champion for transport in Ynys Môn and the wider north Wales region. She has secured a Backbench Business debate on the west coast main line in the Chamber on 15 December, and that demonstrates what a champion she is. I expect to have the business case for the project that she mentions on my desk in the new year, when I can talk to her further about it.

Peter Grant Portrait Peter Grant (Glenrothes) (SNP)
- Hansard - - - Excerpts

14. What assessment he has made of his Department’s spending priorities in the context of the autumn statement 2022.

--- Later in debate ---
Huw Merriman Portrait The Minister of State, Department for Transport (Huw Merriman)
- View Speech - Hansard - -

As well as committing to the core integrated rail plan, over the summer the Prime Minister set this Department the challenge of assessing options for Bradford with regard to a new station and better connecting Bradford. That is work that I am doing. It is an incredibly high priority for me, and I will come back to the hon. Gentleman with detail once that is ready.

Luke Evans Portrait Dr Luke Evans  (Bosworth) (Con)
- View Speech - Hansard - - - Excerpts

T8.   The campaign to reopen the Ivanhoe line, joining Burton to Leicester and coming through my constituency, has the support of four MPs. It has been gaining traction, support and funding from the Department for Transport. We are now into the millions and the project is getting closer to coming to fruition. Will the Minister comment on where this programme is and how likely it is to come forward?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I thank my hon. Friend for all the work that he does with regard to the campaign to reopen the Ivanhoe line and for the success in securing more funding for the Ivanhoe line project in June this year. Network Rail is undertaking development work to test different service and scope options and progress the business case. Decisions on this scheme and others in the restoring your railway programme are expected in the next year, but I just remind him of the financial envelope within which we are all working.

Chris Stephens Portrait Chris Stephens (Glasgow South West) (SNP)
- View Speech - Hansard - - - Excerpts

T4. Unite the union, which represents tens of thousands of lorry drivers, has discovered by a freedom of information request that the UK Government’s scheme of £32 million to improve toilet facilities for lorry drivers is entirely unspent a year after the then Chancellor announced it. Why is that the case?

--- Later in debate ---
Wera Hobhouse Portrait Wera Hobhouse (Bath) (LD)
- View Speech - Hansard - - - Excerpts

Research from the Campaign for Better Transport suggests that the Government are so far behind on their electrification plans that rolling stock leasing companies are being forced to destroy electric units that they cannot use. At the same time, the Government continue to introduce new diesel trains—more not zero than net zero. Will the Government ensure that they order no more diesel trains and get on with electrification?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

The Government are committed to phasing out all diesel trains by 2040. That remains our aim and our ambition. There is electrification going on at the moment along the west midlands line, and we are certainly committed to ensuring that we can roll out more electrification, and indeed use hydrogen and battery power where appropriate, in the years to come.

Amanda Milling Portrait Amanda Milling (Cannock Chase) (Con)
- View Speech - Hansard - - - Excerpts

The electrification of the Chase line means that passengers benefit from a more frequent service. However, passengers from Rugeley remain disadvantaged because the last train from Birmingham terminates at Hednesford. Will the Rail Minister meet me to discuss this matter and other issues that Chase line passengers face?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

My right hon. Friend does an incredible job for her constituents, and on that basis of course I say yes to meeting her and learning more about those issues.

Sam Tarry Portrait Sam Tarry (Ilford South) (Lab)
- View Speech - Hansard - - - Excerpts

Last week the RMT voted overwhelmingly for strike action. Last night the Secretary of State said he would be prepared to meet the leader of the RMT. Some 50% of the public and passengers support those rail strikes. They should not just have been shaking hands last night, but they should be shaking hands today on a deal. The Secretary of State knows full well that he sets the flexibility and parameters for both Network Rail and train operating companies on the financial offer they can put forward. It is in his hands to end those strikes, and to do so today.

--- Later in debate ---
Clive Efford Portrait Clive Efford (Eltham) (Lab)
- View Speech - Hansard - - - Excerpts

Before the pandemic, the rail services through my constituency suffered from chronic overcrowding, yet the Government used the pandemic as an excuse to cut peak-time services from my constituency without consultation of those rail users. What is he going to do to monitor the damage that he has done and to ensure that those services are restored when those trains get chronically overcrowded again?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

Southeastern did indeed ask for a derogation to consult, and changes had to be made quite rapidly during the pandemic, although may I just say that, as a fellow user of Southeastern, the hon. Member will find that there are some benefits from that? It is not just about taking down some costs; it is also about simplifying the line structure, so that at Lewisham, for example, there will not be as many trains crossing. If he would just wait and see how matters progress, he and I might find that it has been a good timetable change after all.

Pauline Latham Portrait Mrs Pauline Latham (Mid Derbyshire) (Con)
- View Speech - Hansard - - - Excerpts

Derby’s bid to be the headquarters of Great British Railways has huge support: more than 20 right hon. and hon. Members, 40 local authorities, and the businesses forming the largest rail cluster in the country, and maybe even in Europe. Will the Minister confirm when the announcement will be made to confirm which of the six shortlisted locations has won the bidding process?

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

We have had six excellent shortlisted bids, one of which of course is Derby. The Government remain committed to reform of the railways. We will be looking at all the options, and that includes looking at bringing forward legislation to make this happen and revealing the winning bid at that time.

Lindsay Hoyle Portrait Mr Speaker
- Hansard - - - Excerpts

Sooner rather than later, I hope.

--- Later in debate ---
Lindsay Hoyle Portrait Mr Speaker
- Hansard - - - Excerpts

It is dreadful at the moment. Come on, Minister.

Huw Merriman Portrait Huw Merriman
- View Speech - Hansard - -

I am sorry for my hon. Friend’s experience and that of his constituents. We are working very hard with the Avanti team to get more services restored. In December, with the good will of the unions and the workforce, we will see an increase in weekday services from the current 180 to 264, which would be a greater number than before the unions decided not to work to the rest day agreement, which is something I very much regret. I am committed to ensuring that Avanti services improve, which I know is important to you, Mr Speaker, and all Members of the House.

Lindsay Hoyle Portrait Mr Speaker
- Hansard - - - Excerpts

What happens if they do not, which they do not seem to?

Draft Transport and Works (Guided Transport Modes) (Amendment) Order 2022

Huw Merriman Excerpts
Tuesday 22nd November 2022

(1 year, 5 months ago)

General Committees
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Huw Merriman Portrait The Minister of State, Department for Transport (Huw Merriman)
- Hansard - -

I beg to move,

That the Committee has considered the draft Transport and Works (Guided Transport Modes) (Amendment) Order 2022.

It is a pleasure to serve under your chairship, Dame Caroline. Orders made under the Transport and Works Act 1992 are the usual way to authorise the construction or operation of local transport schemes, such as railways, tramways or trolley vehicle systems, in England and Wales, as well as transport systems using a mode of guided transport prescribed by order.

The modes that are currently prescribed that can seek authorisation via the Transport and Works Act include road-based and track-based systems, but those are limited to systems guided by physical means, such as cables or tracks. Changes in technology mean that transport systems can now be guided by non-physical means, which might include simple sensor systems that detect paint or other road markings to direct a vehicle, or more complex sensor systems that read the surrounding environment to direct the vehicle. The draft amendment order will extend the Transport and Works (Guided Transport Modes) Order 1992 to allow applications for public transport schemes using non-physical guidance systems to be authorised via a Transport and Works Act order.

The order will not change the process that a promoter is required to follow in seeking authorisation through the Transport and Works Act regime or the way in which such applications are decided. It will simply allow a wider and more modern range of schemes to be considered and authorised under the Transport and Works Act. In other words, should the proposed change be approved, parties impacted by a scheme that will use a form of non-physically guided technology will continue to have the opportunity to submit their views on that scheme. Any views that are submitted will be fully considered before a decision is made on whether to grant consent on a specific scheme.

Let me provide further context and background on what the Transport and Works Act covers. The Act is intended to be a one-stop consenting mechanism for all the powers needed to deliver and operate a transport scheme. An application made under section 1 of the Act can include a wide range of matters set out in schedule 1 to the Act, such as the construction, alteration, repair, maintenance, demolition and removal of railways, tramways, trolley vehicle systems and other transport systems allowed under the Act.

Greg Knight Portrait Sir Greg Knight (East Yorkshire) (Con)
- Hansard - - - Excerpts

Can the Minister assure the Committee that there will be a joined-up approach here? For example, I notice that this proposal applies only to England and Wales. What assurances can he give me that, if I decide in a few years’ time to go from the north of England to Scotland in a self-driving car, that car will not stop at the Scottish border because Scotland has introduced a different method?

Huw Merriman Portrait Huw Merriman
- Hansard - -

My right hon. Friend makes an excellent point. As he rightly mentioned, the order applies to England and Wales. We have sought the approval of the Welsh Administration, who are content with it. Scotland has its own Transport and Works Act mechanism. My right hon. Friend is right that the issue he raises will have to be taken into consideration when one gets to the stage of looking at a joined-up Union system. However, it will be for the Scottish Administration to move matters forward. I will write to the Scottish Executive, and I will go beyond the point that they are content because they have their own mechanism and actually inquire as to how they would see cross-border activity working in practice. I would just make the point that this is an enabling piece of legislation, so every project under it would itself have to be approved, and Scotland would of course need the same enabling mechanism. However, I will write to my right hon. Friend with the assurance he seeks.

Applicants seeking authorisation under the Transport and Works Act can apply to construct, alter, repair, maintain or demolish roads buildings and other structures, as needed to allow for the delivery of a scheme. If the order is approved, such provisions will apply equally to a guided mode of transport system using sensor technology, where applicants are required to deliver such a scheme. That demonstrates that there is currently wide provision to allow an application to incorporate any of the aforementioned matters where they are necessary and appropriate for the delivery of the scheme under consideration. That will not change as a result of the order. The power to make this amending order is set out in section 2 of the Transport and Works Act but is subject to approval by a resolution of each House of Parliament.

The term “guided transport” is defined as

“transport by vehicles guided by means external to the vehicles (whether or not the vehicles are also capable of being operated in some other way)”.

The order seeks to cover transport by vehicles guided by non-physical guidance systems. These systems, whether simple sensor systems that detect paint or other road markings, or more complex sensor systems that read the surrounding environment, are external to the vehicle.

To conclude, the order is essential to support innovation in transport and to allow the use of new, more advanced technologies. It had wide support from those who responded to the public consultation on this change. As enabling legislation, it does not impose additional costs on applicants applying for Transport and Works Act orders or on the Government in taking forward and providing consent for such applications. I hope Members will join me in supporting the order, and I commend it to the Committee.

--- Later in debate ---
Huw Merriman Portrait Huw Merriman
- Hansard - -

I hope that the Committee has found the debate informative and will join me in supporting the order. Let me respond to the points the shadow Minister sought reassurance over.

On safety, I make the point again that this is enabling legislation and will just extend the perimeter to non-physical transport means. There will still be the opportunity under the Transport and Works Act to fully assess a project. I am sure the hon. Gentleman has experience—I certainly do—of constituency projects, and one project I have in mind has had a full public inquiry, which had the remit to look at all the angles. Technology, and reliance on technology, will be just another angle to be looked at, but it will be looked at more deeply because this technology is novel and a new way of operating. I can absolutely give the hon. Gentleman the assurance that there will be no weakening of safety. Indeed, I envisage safety being looked at even more prominently as we deal with new technologies that come onstream.

The hon. Gentleman sought reassurance over workforce employment security, if I can put it in that manner. Again, to give him reassurance, let me say that a scheme being looked at in one part of the country would involve a bus using a sensor, but where the bus comes on to the public highway, the driver would take control—there will be a driver there at all times, and they will operate the bus at different times. Again, that is not being implemented by what we are talking about today—this being enabling legislation—but it could be put forward as part of a subsequent application. However, there will be no workforce issue. Of course, these brand-new, innovative projects and modes of transport should actually create a huge jobs market for this country, if it is at the forefront of this technology. That is why this legislation is so important: this is not just about building, or having the capability to build these things, but legislating to ensure that they can be operated in this country.

On the steps taken to deliver research and development, I should not put on an old hat, but I know that the Transport Committee is looking at the manner in which this country is innovating, and one reassuring point I would make to the hon. Gentleman is that the sheer amount of evidence coming from companies and organisations developing these products in this country demonstrates not only that the R&D budget is there and that there is investment from the UK Government, but that companies find the environment in this country very much to their liking. I hope the Committee will send out the message that we support that.

To conclude, the draft order will amend legislation to permit a wider range of transport to be authorised under the Transport and Works Act 1992, supporting, and allowing advantage to be taken of, new and more advanced technologies. On that basis, I commend it to the Committee.

Question put and agreed to.

North Wales Main Line

Huw Merriman Excerpts
Tuesday 15th November 2022

(1 year, 5 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Huw Merriman Portrait The Minister of State, Department for Transport (Huw Merriman)
- Hansard - -

It is a pleasure to serve under your chairship, Ms McVey, as it was to serve as your Parliamentary Private Secretary all those years ago—now look what has happened. I thank my hon. Friend the Member for Aberconwy (Robin Millar) for securing this important debate on the strategic importance of the north Wales main line, and for the passionate manner in which he made his case.

I thank my hon. Friends the Member for Clwyd South (Simon Baynes) and for Ynys Môn (Virginia Crosbie) for their contributions. I also thank the Under-Secretary of State for Wales, my hon. Friend the Member for Vale of Clwyd (Dr Davies), who is unable to speak due to his ministerial position but has been speaking to me and representing his constituents. I thank the hon. Member for Slough (Mr Dhesi), for whom I have always had a warm regard—I hope that continues, notwithstanding our various positions—for his kind welcome. I hope that we continue to work well.

In responding to the debate, I will speak first about Welsh investment and what is being done to invest in north Wales. I will then speak to the situation with Avanti. My hon. Friend the Member for Ynys Môn asked me to give some detail about that, and I hope that I can do so.

On Welsh investment, during the current railway investment control period, which covers 2019 to 2024, a record £2 billion will be spent in Wales by Network Rail. Of that, nearly £1.2 billion will be spent on renewing and upgrading the infrastructure to meet current and future needs. In addition, through the rail network enhancements pipeline, we continue to deliver ambitious enhancements to the rail network, investing in key priorities with an unrelenting focus on levelling up our nation and ensuring that all communities have the connections they need to support growth and prosperity.

By way of example, Network Rail is currently finalising an outline business case for upgrading the north Wales main line between Chester and Holyhead, and improving journey times between north Wales, the north-west of England and other major UK centres. We have this year delivered an upgrade to the digital signalling system on the Cambrian line, supporting the transformation of passenger experience and enabling the operation of state-of-the-art new trains. Those trains are currently undergoing testing and will soon be introduced on the line, as well as on other routes across Wales. We expect to be in a position to publish an update to RNEP, confirming the status of all enhancement schemes, very shortly.

My hon. Friend the Member for Aberconwy has highlighted the findings of Sir Peter Hendy’s Union connectivity Review. The Government are grateful to Sir Peter for his work, and we are considering his 19 recommendations carefully. As Sir Peter has highlighted, in most cases his report does not contain new detailed infrastructure proposals. Instead, he points the way to further work, which should better identify where, when and what to invest in for the best results for people across the United Kingdom.

In anticipation of Sir Peter’s recommendations, the Government set aside further funding at spending review 2021 to add to the £20 million previously allocated to take forward some of this essential development work. The funding will set us on the right path to developing the best infrastructure development options to strengthen our main transport arteries for people and businesses across the UK.

We have been discussing Sir Peter’s recommendations and the opportunities for development funding with the devolved Administrations to identify the solutions that work best for the people of the UK. We are pleased that the Welsh Government agree with Sir Peter’s recommendations and we are discussing with them how we can best support his work.

My hon. Friend the Member for Clwyd South mentioned the impact of HS2 on north Wales. HS2 will free up capacity on the existing west coast main line and enable faster journey times from the rest of Great Britain to both north and south Wales via new interchange opportunities. Journey times from many places in north Wales to London could be reduced to about two hours and 15 minutes, changing at Crewe station.

Hon. Members have ably addressed the reduction in Avanti services. I share and recognise their frustration, but want to be clear about the reasons behind the reduction and the action the Government have taken to mitigate the effects on passengers where possible. It is long-standing practice for rail operators to use a degree of rest-day working to operate the normal timetable, to the mutual benefit of companies and staff. It gives companies a degree of flexibility to cover for things such as staff sicknesses and holidays, and it gives staff the opportunity to earn additional money should they wish.

Avanti, in common with many other companies in the rail sector and beyond, has experienced a range of difficulties in responding to the pandemic. Each rail operator is unique and the impacts fell differently across them all. In Avanti’s case, they included a higher than expected retirement rate, restrictions on training that required two people in a cab and a number of drivers who needed retraining when they returned from an extended period of shielding. Approximately 15% of Avanti’s driver workforce were unable to work for varying degrees of time during the pandemic due to being clinically extremely vulnerable and requiring partial or full retraining on returning to work. That contributed to a position where the company was relatively dependent on rest-day working, as has been pointed out.

None of that explanation is to exclude the operator’s responsibility to manage its operation effectively, but it is important that we hold it to account for what it is responsible for, and do not seek to hold it to account for matters outside its control. The Department is considering that carefully, under the terms of the contract.

On 30 July this year, Avanti experienced immediate and near-total cessation of drivers volunteering to work passenger trains on rest days. That left Avanti unable to operate its full timetable and facing a choice of whether to try, day by day, to run what it could, with the inevitable short-notice cancellations, or to reduce the timetable to a level operable without overtime.

That was a difficult and invidious choice, but I am sure that Members will appreciate that the impact of short-notice cancellations is particularly bad for passengers. It is not possible for passengers to plan around them as they do not know in advance what will be cancelled, so it leads to late journeys and overcrowded trains. While that is bad for anyone, it is particularly bad for passengers who may have booked assistance, be unable to stand or be travelling with children, for example.

The alternative—reducing the timetable—is also highly disruptive, and that case has been made, but it is honest with passengers and gives them a chance to try to make alternative plans. That approach has reduced cancellations of about 25% of the service in late July and early August to about 5% today.

Members in today’s debate have made the point that the impact on north Wales has been particularly severe because the majority of through trains to London have been replaced by a shuttle to Crewe. Avanti has sought to mitigate the situation by adding more stops at Crewe on its other services to improve the interchange, but I acknowledge the point and the particular impact the situation has had on passengers travelling to and from north Wales.

Virginia Crosbie Portrait Virginia Crosbie
- Hansard - - - Excerpts

Will the Minister take me up on my offer of coming to Holyhead, having a panad and sitting down with the train drivers to hear at first hand about how their working practices impact them on a daily basis?

Huw Merriman Portrait Huw Merriman
- Hansard - -

I assure my hon. Friend that I had not forgotten that ask—I will answer it now instead of later. I am keen in my new role to meet as many members of the rail workforce as I can, as far across the nation as I can. I will be delighted to join her in Holyhead, meet those drivers and have a look around her constituency to see the impact she has so ably described. I look forward to having a good, honest conversation with the drivers. I always worked well with the rail force in my previous role, and hope I can do so again in my current one.

Let me turn to service restoration plans. Nearly 100 drivers will have entered service with Avanti between April and December this year, comprising new recruits and those who have completed the required retraining. As they have become available to work, Avanti started to introduce additional services where they are most needed, and where train crew resources allow. So far, those have been focused on London to Birmingham and London to Manchester. Avanti plans a further increase in December, at the next major timetable change. That will see the majority of direct north Wales services restored, with five trains a day in each direction between Holyhead and London, which I know Members and their constituents will welcome.

I want to see Avanti’s plan to increase services succeed, so that passengers travelling to and from north Wales get the experience they deserve. My officials are holding weekly meetings with Avanti senior management, and are reviewing Avanti’s progress against the plan and handling of risks. They are reporting to the Secretary of State and to me as Rail Minister.

I have also met Steve Montgomery, who is managing director for rail at FirstGroup, the ultimate parent company. The Office of Rail and Road—the independent regulator—and Network Rail’s programme management office have both reviewed Avanti’s plans, and are content. I hope that independence gives hon. Members some reassurance.

It is important to be clear that many of these factors are not in Avanti’s control. Crucially, this improvement will require the support of the trade unions. It is important to modernise the railway to phase out old-fashioned ways of working, improve people’s journeys, help make trains more reliable and create savings that can provide funding towards a pay rise for staff.

Finally, I turn to the contract that Avanti has with the Department, which I know has been a matter of interest for many across the House. On 7 October, the Department entered into a short-term extension of six months to 1 April 2023. That short-term extension will allow the Avanti side of the business to roll out its recovery plan. The Department will consider Avanti’s performance, while officials finalise a national rail contract for consideration.

I conclude by thanking you, Ms McVey, and all hon. Members. I hope they have been reassured by the updates I have been able to give them. I look forward to working with all my colleagues across the House and in north Wales, so that we can give them the rail services they need.